Skip to content
Skills Library
DevOps & cloud · Testing

verification-before-completion

/verification-before-completion

Use when about to claim infrastructure work is complete, fixed, verified, or healthy - before any commit, PR, or status update

Repository
srepowers ↗
Licence
MIT
Last repository change
09.11.2026

Assessment and security

100/ 100Class: good
Format25 / 25
Frontmatter with name and description, valid name, description up to 1,024 characters, name matching the folder.
Discoverability25 / 25
Description explains when to use the skill, has a reasonable length and uses third person.
Content35 / 35
At least 150 words and at most 500 lines, headings, step lists, examples or code.
Hygiene15 / 15
No placeholders such as TODO, no Windows paths, with a licence.
Riskno signals detected in the scan
Files in this package
2
Scripts
0
HTML comments
0
URLs in SKILL.md
1
Deprecation

No signals detected. Repository changed on 09.11.2026, without references to retired models or APIs.

Licence

MIT, open: use and modify while retaining author attribution.

What it does and when to use it

Use when about to claim infrastructure work is complete, fixed, verified, or healthy - before any commit, PR, or status update

Original author description

Use when about to claim infrastructure work is complete, fixed, verified, or healthy - before any commit, PR, or status update

How it works

  1. Overview
  2. The Iron Law
  3. Why This Matters
  4. The Gate Function
  5. Project-Wide Validation
  6. Common Infrastructure Failures
  7. Red Flags — STOP
  8. Rationalization Prevention
  9. Key Patterns
  10. When To Apply
Original SKILL.md headings · 179 lines, 1,157 words
SKILL.md preview
---
name: verification-before-completion
description: Use when about to claim infrastructure work is complete, fixed, verified, or healthy - before any commit, PR, or status update
license: MIT
---

# Verification Before Completion

## Overview

Claiming infrastructure work is complete without verification causes incidents, not efficiency.

**Core principle:** Evidence before claims, always.

**Violating the letter of this rule is violating the spirit of this rule.**

## The Iron Law

```
NO COMPLETION CLAIMS WITHOUT FRESH VERIFICATION EVIDENCE
```

If you haven't run the verification command in this message, you cannot claim it passes.

## Why This Matters

Unverified completion claims are how single changes become incidents:
- "It's deployed" when the rollout never became Ready — traffic hits a broken version
- Undefined config shipped — the service crash-loops on next restart
- Missing requirements shipped — the change is incomplete and reopens as a follow-up incident
- Time wasted on false completion → the operation gets handed back → rework under worse conditions
- Trust broken — once a stakeholder hears "it's fixed" and finds it isn't, every future status claim is doubted
- Violates the core value: honesty. A false "healthy" during an incident is worse than saying "still investigating."

## The Gate Function

```
BEFORE claiming any status or expressing satisfaction:

1. IDENTIFY: What command proves this claim?
2. RUN: Execute the FULL command (fresh, complete)
3. READ: Full output, check exit code, count failures
4. VERIFY: Does output confirm the claim?
   - If NO: State actual status with evidence
   - If YES: State claim WITH evidence
5. ONLY THEN: Make the claim

Skip any step = lying, not verifying
```

## Project-Wide Validation

When work changes repository content, the project's complete validation command
or full suite defines green — not only the one test, manifest, or module named
in the task. A scope statement bounds the deliverable, not verification.

- Run the repository's canonical complete command (`pytest`, `npm test`,
  `cargo test`, `python3 scripts/validate-repo.py`, or its documented equivalent)
- Report every failure by name, including failures you did not cause; omission
  falsifies the completion report
- Distinguish pre-existing failures from regressions with evidence, but do not
  silently suppress either and do not expand scope to fix unrelated failures
- A targeted check may establish RED/GREEN for the change; it does not replace
  the complete project gate before a completion, commit, PR, or merge claim

For live-state-only operations with no repository suite, the complete command is
the plan's full verification set for the affected and adjacent systems.

## Common Infrastructure Failures

| Claim | Requires | Not Sufficient |
|-------|----------|----------------|
| Deployment succeeded | `kubectl --context <context> rollout status` shows all ready | Helm exit 0, "should be up" |
| Service is healthy | Health endpoint returns 200 + correct response | Pod is Running |
| Config applied | `kubectl --context <context> get cm/secret -o yaml` shows new value | `kubectl --context <context> apply` exit 0 |
| Certificate valid | `openssl s_client` or cert expiry checked | Secret created |
| Migration complete | Row count / schema verified | Migration job exit 0 |
| Pipeline passed | CI job logs show green + artifacts | Job queued or "triggered" |
| Bug fixed | Original symptom reproduced and no longer fails | Code changed |
| Rollback complete | Service responding correctly at previous version | Old image tag applied |
| Resource deleted | `kubectl --context <context> get` returns NotFound | Delete command exit 0 |
| Agent completed task | VCS diff shows expected changes | Agent reports "success" |

## Red Flags — STOP

- Using "should", "probably", "seems to", "looks like"
- Expressing satisfaction before verification ("Done!", "Fixed!", "Deployed!", "All good!")
- About to commit/push/PR/merge without verification
- Trusting agent success reports without independent check
- Relying on command exit code alone (exit 0 ≠ correct result)
- Thinking "just this once" during an incident
- Tired at end of incident and wanting work over
- **ANY wording implying success without having run verification**

## Rationalization Prevention

| Excuse | Reality |
|--------|---------|
| "Helm exited 0, it's deployed" | Run `kubectl --context <context> rollout status` |
| "I'm confident it's fixed" | Confidence ≠ evidence. Run the check. |
| "Pod is Running" | Running ≠ healthy. Check health endpoint. |
| "Agent said success" | Verify independently with kubectl/git diff |
| "I'm tired, incident is over" | Exhaustion ≠ excuse. One more command. |
| "Partial check is enough" | Partial proves nothing. Run the full check. |
| "It worked in staging" | Staging ≠ production. Verify production. |
| "No time during incident" | Unverified fix extends incidents. |

## Key Patterns

**Deployment:**
```
✅ [kubectl --context <context> rollout status deploy/api -n prod] [See: successfully rolled out] "Deployment succeeded"
❌ "Helm exited 0, deployment done"
```

**Service health:**
```
✅ [curl -s https://api.example.com/healthz] [See: {"status":"ok"}] "Service healthy"
❌ "Pod is Running"
```

**Config/Secret applied:**
```
✅ [kubectl --context <context> get cm app-config -o jsonpath='{.data.KEY}'] [See: expected-value] "Config applied"
❌ "kubectl --context <context> apply returned exit 0"
```

**Infrastructure operation (TDO):**
```
✅ [Run verification command from plan] [See: expected output] "Phase complete"
❌ "Commands ran without errors"
```

**Agent delegation:**
```
✅ Agent reports success → [git diff / kubectl --context <context> get] → Verify changes → Report actual state
❌ Trust agent report at face value
```

## When To Apply

**ALWAYS before:**
- ANY success/completion/healthy claim
- ANY expression of satisfaction
- Committing, PR creation, task completion
- Moving to next step in an operation plan
- Handing off to next skill (e.g., finishing-operation-branch)
- Delegating to subagents and accepting their results
- Closing an incident

**Rule applies to:**
- Exact phrases and paraphrases
- Implications of success
- ANY communication suggesting completion or correctness

## Integration

**Pairs with:**
- **test-driven-operation** — TDO's verification step IS this skill's gate function
- **executing-operation-plans** — Each phase completion requires verification before proceeding
- **finishing-operation-branch** — Branch completion requires all verifications passed
- **incident-commander** — Incident close requires verified service restoration

## Requirements Traceability Verification

When verifying completion of an operation plan that includes a `## Requirements Traceability` section:

1. Read the requirements traceability table from the plan
2. For each requirement mapped to a task, verify the task's execution evidence covers it
3. Update the Status column: `pending` → `done` | `skipped` | `failed`
4. Present a coverage summary:

```
Requirements Coverage:
✅ "Pod has resource limits" → Task 3 → done
✅ "Health check configured" → Task 3 → done
❌ "Network policy applied" → Task 4 → failed (verification output mismatch)
```

5. If any requirement shows `failed` or is still `pending`: the operation is NOT complete
6. All requirements must be `done` or explicitly `skipped` (with documented reason) before proceeding to `finishing-operation-branch`

**Issue tracker integration:** When the plan has a `ticket` in frontmatter, cross-reference acceptance criteria against the coverage summary. If a tracker MCP (ClickUp, Jira, etc.) is available, fetch the ticket and verify criteria are met. Update the ticket to reflect completion when all criteria pass.
Files in this package (2)
  • README.md 2 KB
  • SKILL.md 8 KB

Versions

RepositoryScoreLicence
This page · yg-codes/srepowers100MIT
jjuraszek/pi-gauntlet100MIT
GanyuanRan/Aegis100MIT
mvschwarz/openrig100Apache-2.0
nikospavlopoulos/devops-mutant-powers100MIT
FrancoStino/opencode-skills-collection100MIT
foryourhealth111-pixel/Vibe-Skills100Apache-2.0
rootcastleco/rei-skills100MIT
Montinou/triqual100MIT

Database snapshot: 13.11.2026 · package version c7f2a56b42dd (SHA-256 digest of the entire package)

Downloads in the last 30 days: 0 · ranking

Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.

Similar skills

  • 100spot-verification-before-completion
    Use when about to claim work is complete, fixed, passing, verified, release-ready, or ready to commit, merge, publish, or hand off.
  • 86team-shinchan:verification-before-completion
    Use when claiming a task is complete, before commits, or before PR creation.
  • 96skill-verification-gate
    Use when about to declare work complete, fixed, passing, or done
  • 90verification
    Evidence-based verification methodology before claiming work is complete. Use when about to claim work is done, before committing, before creating PRs, or when verification-reminder hook fires. Triggers on: 'verify', 'verification', 'is it done', 'complete', 'ready to merge'.

Feedback and reports

Your message goes to Bartosz Sokoliński. An email address is needed only for a reply. See the privacy policy.