verification-before-completion
/verification-before-completion
Use when about to claim work is done, or asked "is it done?", "can I close the ticket?", "Flux/CI/pods are green, are we good?" after a deploy, merge or config change — prove the effect through the real user path before any success claim.
- Author
- nikospavlopoulos ↗
- Repository
- devops-mutant-powers ↗
- Licence
- MIT
- Last repository change
- 12.11.2026
Assessment and security
- Files in this package
- 2
- Scripts
- 0
- HTML comments
- 0
- URLs in SKILL.md
- 2
No signals detected. Repository changed on 12.11.2026, without references to retired models or APIs.
MIT, open: use and modify while retaining author attribution.
What it does and when to use it
Use when about to claim work is done, or asked "is it done?", "can I close the ticket?", "Flux/CI/pods are green, are we good?" after a deploy, merge or config change — prove the effect through the real user path before any success claim.
Triggers from the description
Original author description
Use when about to claim work is done, or asked "is it done?", "can I close the ticket?", "Flux/CI/pods are green, are we good?" after a deploy, merge or config change — prove the effect through the real user path before any success claim.
How it works
- Overview
- The Iron Law
- The Gate Function
- Common Failures
- Verification by Task Type
- Red Flags — STOP
- Rationalization Prevention
- Key Patterns
- When To Apply
- DevOps depth
SKILL.md preview
---
name: verification-before-completion
description: Use when about to claim work is done, or asked "is it done?", "can I close the ticket?", "Flux/CI/pods are green, are we good?" after a deploy, merge or config change — prove the effect through the real user path before any success claim.
---
# Verification Before Completion
## Overview
**Core principle:** Evidence before claims, always.
**Violating the letter of this rule is violating the spirit of this rule.**
## The Iron Law
```
NO COMPLETION CLAIMS WITHOUT FRESH VERIFICATION EVIDENCE
```
If you haven't run the verification command in this message, you cannot claim it passes.
## The Gate Function
```
BEFORE claiming any status or expressing satisfaction:
1. IDENTIFY: What command proves this claim?
2. RUN: Execute the FULL command (fresh, complete)
3. READ: Full output, check exit code, count failures
4. VERIFY: Does output confirm the claim?
- If NO: State actual status with evidence
- If YES: State claim WITH evidence
5. ONLY THEN: Make the claim
Skip any step = lying, not verifying
```
## Common Failures
| Claim | Requires | Not Sufficient |
|-------|----------|----------------|
| Tests pass | Test command output: 0 failures | Previous run, "should pass" |
| Deploy succeeded | New image digest running + the real endpoint answering through the user's path (`references/devops-proof-table.md`) | `kubectl apply` exit 0, Pod `Running` |
| No errors since the deploy | Requests on the changed path counted in that window (> 0), then its errors (`references/devops-proof-table.md`) | An empty error panel or log search |
| Infra applied correctly | `terraform show` matches intent | `terraform apply` exit 0 |
| Bug fixed | Original symptom tested: passes | Code changed, assumed fixed |
| Pipeline fixed | Green checkmark in CI | Config change committed |
| Agent completed | VCS diff shows changes | Agent reports "success" |
| Requirements met | Line-by-line checklist | Tests passing |
## Verification by Task Type
**Infrastructure apply:**
```bash
terraform show # confirm state matches intent
# test the actual resource in cloud console/CLI
```
**Container deploy:**
```bash
kubectl --context <ctx> -n <ns> get pods # all Running and Ready, restarts not climbing
kubectl --context <ctx> -n <ns> logs <pod> -c <container> --since=10m # no errors
curl /health # health check passes
```
**CI/CD change:**
- Trigger the pipeline and watch it pass
- Don't claim "fixed" until the green checkmark exists
**DNS change:**
```bash
dig +trace example.com # authoritative answer: what is published
dig @<resolver> example.com # what the users' resolver serves (TTL column = remaining cache)
curl https://example.com # site loads correctly
```
**Proxy/network change:**
```bash
curl -v https://example.com
tail -n 50 /var/log/nginx/error.log # no new errors
```
## Red Flags — STOP
- Using "should", "probably", "seems to"
- Expressing satisfaction before verification ("Done!", "Fixed!", "Deployed!", etc.)
- About to commit/push/PR without verification
- Trusting agent success reports
- Relying on partial verification
- Thinking "just this once"
- **ANY wording implying success without having run verification**
## Rationalization Prevention
| Excuse | Reality |
|--------|---------|
| "Should work now" | RUN the verification |
| "I'm confident" | Confidence ≠ evidence |
| "Just this once" | No exceptions |
| "The command exited 0" | Exit code ≠ correct behavior |
| "Agent said success" | Verify independently |
| "The change was small" | Small changes break things too |
| "Partial check is enough" | Partial proves nothing |
| "Different words so rule doesn't apply" | Spirit over letter |
| "Flux/CI says Ready, so they can close the ticket" | Ready = applied. Name the effect check for the ticket's outcome (proof table) |
## Key Patterns
**Infra:**
```
✅ [Run terraform show] [Confirm resource matches intent] "Infrastructure applied correctly"
❌ "Apply exited 0, should be good"
```
**Deploy:**
```
✅ [new digest in containerStatuses[].imageID] [real endpoint via the user's path: 200 + expected body] "Deploy successful"
❌ "Kubectl apply succeeded"
```
**Requirements:**
```
✅ Re-read plan → Create checklist → Verify each → Report gaps or completion
❌ "Tests pass, done"
```
**Agent delegation:**
```
✅ Agent reports success → Check VCS diff → Verify changes → Report actual state
❌ Trust agent report
```
## When To Apply
**ALWAYS before:**
- ANY variation of success/completion claims
- ANY expression of satisfaction
- ANY positive statement about work state
- Committing, PR creation, task completion
- Moving to next task
- Delegating to agents
- Answering "is it done?" / "can I close the ticket?" about someone else's change: give the effect check, not a yes
**Rule applies to:**
- Exact phrases
- Paraphrases and synonyms
- Implications of success
- ANY communication suggesting completion/correctness
## DevOps depth
For infrastructure work, also apply `references/devops-proof-table.md` — what each green signal proves, and the effect check that proves the rest.
Files in this package (2)
- SKILL.md 5 KB
- references/devops-proof-table.md 23 KB
Versions
| Repository | Score | Licence |
|---|---|---|
| This page · nikospavlopoulos/devops-mutant-powers | 100 | MIT |
| jjuraszek/pi-gauntlet | 100 | MIT |
| GanyuanRan/Aegis | 100 | MIT |
| mvschwarz/openrig | 100 | Apache-2.0 |
| FrancoStino/opencode-skills-collection | 100 | MIT |
| foryourhealth111-pixel/Vibe-Skills | 100 | Apache-2.0 |
| rootcastleco/rei-skills | 100 | MIT |
| Montinou/triqual | 100 | MIT |
| coco-research/coco | 100 | MIT |
Database snapshot: 13.11.2026 · package version 2fadb53c21a0 (SHA-256 digest of the entire package)
Downloads in the last 30 days: 2 · ranking
Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.
Similar skills
- 100spot-verification-before-completion
Use when about to claim work is complete, fixed, passing, verified, release-ready, or ready to commit, merge, publish, or hand off. - 100sr-verification-before-completion
Use when about to claim work is complete, fixed, or passing, before committing or creating PRs - requires running verification commands and confirming output before making any success claims; evidence before assertions always - 100deploy
Post-merge deployment workflow covering feature flags, canary/blue-green rollout, smoke-test verification, and rollback triggers. Use after a PR is merged and you need to ship it safely to production. Trigger on "deploy", "roll out", "canary", "feature flag", "rollback".