Skip to content
Skills Library
Finance & accounting · Analysis

variance-analysis

/variance-analysis

When the user wants to analyze the difference between actual and standard costs in manufacturing. Also use when the user mentions "material price variance," "labor efficiency," "overhead variance," "standard costing," or "production audit.

Licence
MIT
Last repository change
01.10.2026

Assessment and security

90/ 100Class: good
Format25 / 25
Frontmatter with name and description, valid name, description up to 1,024 characters, name matching the folder.
Discoverability25 / 25
Description explains when to use the skill, has a reasonable length and uses third person.
Content25 / 35
At least 150 words and at most 500 lines, headings, step lists, examples or code.
Hygiene15 / 15
No placeholders such as TODO, no Windows paths, with a licence.
Riskno signals detected in the scan
Files in this package
7
Scripts
1
HTML comments
0
URLs in SKILL.md
0
Deprecation

No signals detected. Repository changed on 01.10.2026, without references to retired models or APIs.

Licence

MIT, open: use and modify while retaining author attribution.

What to check before installing
  • 1 scripts in this package. Review them before installing, as Claude may execute them.

Scripts: scripts/calculate.py

What it does and when to use it

When the user wants to analyze the difference between actual and standard costs in manufacturing. Also use when the user mentions "material price variance," "labor efficiency," "overhead variance," "standard costing," or "production audit.

Triggers from the description

material price variance,labor efficiency,overhead variance,standard costing,
Original author description

When the user wants to analyze the difference between actual and standard costs in manufacturing. Also use when the user mentions "material price variance," "labor efficiency," "overhead variance," "standard costing," or "production audit.

How it works

  1. Initial Assessment
  2. Variance Framework
  3. Technical Analysis Steps
  4. Output Format
  5. Scripts
  6. References
  7. Related Skills
Original SKILL.md headings · 73 lines, 321 words
SKILL.md preview
---
name: variance-analysis
description: When the user wants to analyze the difference between actual and standard costs in manufacturing. Also use when the user mentions "material price variance," "labor efficiency," "overhead variance," "standard costing," or "production audit."
metadata:
  version: 1.0.0
---

# Standard Cost Variance Analysis

You are a Plant Controller. Your goal is to identify exactly *why* actual production costs differed from the budget—whether due to price, volume, or efficiency.

## Initial Assessment

1. **Standard Inputs**
   - Standard Price ($P_s$) and Standard Quantity ($Q_s$) per unit.
   - Standard Labor Rate ($R_s$) and Standard Hours ($H_s$) per unit.

2. **Actual Results**
   - Actual Price ($P_a$) and Actual Quantity used ($Q_a$).
   - Actual Labor Rate ($R_a$) and Actual Hours worked ($H_a$).

---

## Variance Framework

### Material Variances
1. **Price Variance**: `(Standard Price - Actual Price) * Actual Quantity`.
2. **Usage Variance**: `(Standard Quantity - Actual Quantity) * Standard Price`.

### Labor Variances
1. **Rate Variance**: `(Standard Rate - Actual Rate) * Actual Hours`.
2. **Efficiency Variance**: `(Standard Hours - Actual Hours) * Standard Rate`.

---

## Technical Analysis Steps

### 1. Root Cause Identification
- Was the **Price Variance** due to a bad purchasing deal or a market spike?
- Was the **Efficiency Variance** due to machine downtime or poor training?

### 2. Overhead Variance
- Fixed Overhead Spending Variance.
- Fixed Overhead Volume Variance (Over/Under absorption).

---

## Output Format

### Production Variance Report

**Summary Dashboard**
- **Total Variance**: $X (Favorable/Unfavorable).
- **Primary Driver**: (e.g., "70% of variance driven by material price").

**Variance Table**
- Material Price | Material Usage | Labor Rate | Labor Efficiency | Overhead.

**Corrective Actions**
- Recommended fixes for unfavorable variances (e.g., "Retrain shift B," "Search for new copper supplier").

---

## Scripts
- [calculate.py](./scripts/calculate.py): Material, labor, and overhead variance functions. Run with `python3 scripts/calculate.py` to self-test; import the functions for actual computations.

---

## References
- [Variance Formulas](./references/variance-math.md): Quick look-up for all manufacturing variances.
- [Absorption vs. Variable Costing](./references/overhead-logic.md): Understanding fixed overhead.

---

## Related Skills
- **product-profitability**: To see how variances impact SKU-level margins.
- **budget-forecast**: For setting the "Standard Costs" for the next period.
- **audit-checklist**: For auditing the accuracy of production reporting.
Files in this package (7)
  • EXAMPLE.md 1 KB
  • SKILL.md 3 KB
  • evals/evals.json 3 KB
  • evals/files/production_data.xlsx 5 KB
  • references/overhead-logic.md 2 KB
  • references/variance-math.md 1 KB
  • scripts/calculate.py 2 KB

Versions

RepositoryScoreLicence
This page · GAJETOso/financeskills90MIT
fabioannovazzi/app_files100AGPL-3.0
fabioannovazzi/app_files100AGPL-3.0
davekilleen/Dex100MIT
alebgl77/claude-inc100MIT
anthropics/knowledge-work-plugins100Apache-2.0
sandbaseai/sandbase-skills100Apache-2.0
rongxinzy/rongxinai90AGPL-3.0
criptogus/agent-evolve-network86Apache-2.0

Identical content appears in 1 other GitHub folders. We show one copy with the highest score.

Database snapshot: 13.11.2026 · package version ff4e60cafebe (SHA-256 digest of the entire package)

Downloads in the last 30 days: 1 · ranking

Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.

Similar skills

  • 100excel-variance-analyzer
    Analyze budget vs actual variances in Excel with drill-down and root cause analysis. Use when performing variance analysis or explaining budget differences. Trigger with phrases like ''excel variance'', ''analyze budget variance'', ''actual vs budget''.
  • 100budget-variance-analysis
    Analyze budget vs. actual variances, identify root causes, and recommend corrective actions. Use when an accountant or finance professional says "explain this variance", "budget vs. actual analysis", "why did we miss budget", "favorable / unfavorable variance", "price volume…
  • 95mparanza-variance-analysis
    Use when a user wants Claude to inspect a sales or management-accounting CSV/XLSX file, compare scenarios or periods, run amount or price-volume-mix variance calculations, and produce reviewable plots and interpretation.
  • 90budget-vs-actual
    Compare actual performance with budget, quantify material variances, and explain timing, volume, price, mix, rate, and one-off drivers. Use for variance analysis.
  • 85budget-variance-explainer
    Drafts the narrative behind a budget variance from the context the user supplies and the discussion in mail and meetings, never producing or changing the figure itself. Use when the user asks to explain a variance, draft the commentary for a budget review, write the story behind…
  • 100mparanza-variance-analysis
    Use when a user wants Claude to inspect a sales or management-accounting CSV/XLSX file, compare scenarios or periods, run amount or price-volume-mix variance calculations, and produce reviewable plots and interpretation.

Feedback and reports

Your message goes to Bartosz Sokoliński. An email address is needed only for a reply. See the privacy policy.