dte-feature
/dte-feature
Full-stack new feature spanning front-end AND back-end — plan, implement, and verify across architecture/back-end AND UI/UX/front-end, making sure BOTH are solid. Composes dte-arc-plan (validated plan), dte-arc-work (gated build), dte-ux + the ui.sh family for the front-end, and dte-deep-reviewer + fit-experience-reviewer to verify both layers. Use when the user says "build this feature", "ship this idea end to end", "add <feature> with a UI", or describes something that needs both a model/controller/job AND a screen. Loops over a list of features. Not for a back-end-only change (use dte-arc-w
- Author
- davidteren ↗
- Repository
- dte-skills ↗
- Licence
- MIT
- Last repository change
- 13.10.2026
Assessment and security
- Files in this package
- 1
- Scripts
- 0
- HTML comments
- 0
- URLs in SKILL.md
- 0
No signals detected. Repository changed on 13.10.2026, without references to retired models or APIs.
MIT, open: use and modify while retaining author attribution.
What it does and when to use it
Full-stack new feature spanning front-end AND back-end — plan, implement, and verify across architecture/back-end AND UI/UX/front-end, making sure BOTH are solid. Composes dte-arc-plan (validated plan), dte-arc-work (gated build), dte-ux + the ui.sh family for the front-end, and dte-deep-reviewer + fit-experience-reviewer to verify both layers. Use when the user says "build this feature", "ship this idea end to end", "add <feature> with a UI", or describes something that needs both a model/controller/job AND a screen. Loops over a list of features. Not for a back-end-only change (use dte-arc-w
Triggers from the description
Original author description
Full-stack new feature spanning front-end AND back-end — plan, implement, and verify across architecture/back-end AND UI/UX/front-end, making sure BOTH are solid. Composes dte-arc-plan (validated plan), dte-arc-work (gated build), dte-ux + the ui.sh family for the front-end, and dte-deep-reviewer + fit-experience-reviewer to verify both layers. Use when the user says "build this feature", "ship this idea end to end", "add <feature> with a UI", or describes something that needs both a model/controller/job AND a screen. Loops over a list of features. Not for a back-end-only change (use dte-arc-w
How it works
- Input
- Establish the gate FIRST
- Cycle (per feature)
- For a list of features
- Degrade gracefully
- Guardrails
- Done when
SKILL.md preview
--- name: dte-feature description: Full-stack new feature spanning front-end AND back-end — plan, implement, and verify across architecture/back-end AND UI/UX/front-end, making sure BOTH are solid. Composes dte-arc-plan (validated plan), dte-arc-work (gated build), dte-ux + the ui.sh family for the front-end, and dte-deep-reviewer + fit-experience-reviewer to verify both layers. Use when the user says "build this feature", "ship this idea end to end", "add <feature> with a UI", or describes something that needs both a model/controller/job AND a screen. Loops over a list of features. Not for a back-end-only change (use dte-arc-work), pure UI (use dte-ux), or just defining the what (use dte-spec). --- # dte-feature — full-stack feature: plan → build → verify, both layers solid Read `../../references/conventions.md` first — **Planning is mandatory and validated**, **Runnable gate**, **Progress: report every phase**. This skill **changes code on both sides of the stack**. It ensures the back-end *and* the front-end each get a real plan, real build, and real verification — neither half is an afterthought. Default: **stop for review after each phase**; `--ship` to auto commit/PR. ## Input - A feature idea/spec (or a `dte-spec` output). If it's still fuzzy, run **`dte-spec`** first to get a validated spec, then come back. - Or a **list** of features → loop (serial by default on a shared codebase). - Read the project `CLAUDE.md`/`AGENTS.md`: interactors-not-services, test framework, design system. ## Establish the gate FIRST Derive the runnable gate (tests + boot/eager-load check; add a JS/asset build + a Lighthouse/a11y check if the feature ships UI) and confirm green on the current tree. It runs before every commit; red = revert. ## Cycle (per feature) 1. **Branch** — `feat/<slug>`. 2. **Plan BOTH layers.** Run **`dte-arc-plan`** → a validated plan that explicitly covers the back-end (models/controllers/jobs/interactors, data, authorization) **and** the front-end (screens, components, states, responsiveness, a11y). A plan missing either layer is not done — send it back. 3. **Build back-end.** `/ce-work` the back-end slice. Interactors not services; follow existing patterns; tests as you go. 4. **Build front-end.** Hand the UI slice to **`dte-ux --build`** (ui.sh family + frontend-design) — real interaction states (loading/empty/error), responsive, dark-mode-aware, accessible. Wire it to the back-end. 5. **Elegance.** `/ce-simplify-code` + `ponytail` over the whole diff. 6. **Verify BOTH.** `dte-deep-reviewer` on the diff (correctness/architecture) **and** **`dte-ux --review`** / `fit-experience-reviewer` on the UI (states, a11y, look-and-feel). Feed 🔴/🟠 back into 3–4 (≤2 passes, then surface what remains). `dte-test-auditor` on changed code. 7. **Gate.** Run the gate. Green → commit + **report the phase** (or `--ship` → `/ce-commit-push-pr`). Red → revert the phase, log why, stop. 8. **Report + pause** — what shipped on each layer, both verify verdicts, gate result, branch, what's next. ## For a list of features One branch per feature; serial by default. Or hand the list to **`dte-loop`** to build a worklist + run it autonomously. Report + pause per feature. ## Degrade gracefully - No `dte-ux`/ui.sh → build the UI with `frontend-design` + `fit-experience-reviewer` directly; note it. - No `dte-arc-plan` → plan via `ce-plan` alone (validation weaker); no `dte-deep-reviewer` → verify with `ce-code-review`/`fit-review`. State any missing layer-verifier — never ship a layer unverified silently. ## Guardrails - **Both layers or it's not done.** A feature with a working back-end and an untested/inaccessible UI (or vice-versa) fails the bar — say so, don't ship half. - Stop-and-ask before push/PR/deploy unless `--ship`. High-sev findings open after 2 passes → not done. ## Done when The feature is implemented on a branch with back-end **and** front-end built, simplified, **both verified** (code review + UX/a11y review green-ish), and **gate-green**, with a phase report. Shipped only if `--ship`.
Versions
The database has no other skills named dte-feature.
Database snapshot: 13.11.2026 · package version d5b22df33d27 (SHA-256 digest of the entire package)
Downloads in the last 30 days: 1 · ranking
Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.
Similar skills
- 90dte-arc-work
The full cycle for a task, bug, area, or a whole plan index — review, plan, do the work, then verify — with quality gates and progress reporting throughout. Composes dte-arc-review (or a light scan), dte-arc-plan, ce-work, ce-simplify-code/ponytail, and dte-deep-reviewer +… - 90dte-arc-plan
Turn architectural findings, a spec, a bug report, or an "improve area X" request into concrete, validated implementation plan(s) — always built with compound-engineering's ce-plan and validated with expectation-fit's fit-validate-plan. For a massive task it decomposes the work… - 100feature-cycle
End-to-end orchestrator chaining spec → plan → implement → verify → review → ship from a local spec — the whole CLAUDE.md lifecycle as one command. Use to drive a complete feature from a ready spec. To validate what to build first use /office-hours. - 100roblox-feature
End-to-end workflow for a Roblox feature from a plain-language request - understand, plan the client/server split, implement with template modules, lint, verify in Studio, report. Use when the user asks for a new mechanic or system ("make a shop", "add pets", "build an obby", "double jump"). - 100scaffold
Scaffold a new feature end-to-end: API contract → database schema → backend service/controller → frontend. Use when building something new from scratch across multiple layers. More opinionated than /implement — always runs the full vertical slice in the correct dependency order.… - 100implement-feature
End-to-end feature implementation workflow. Use when the user says "implement", "build feature", "work on task", "start implementation", or any feature development work. Covers plan review, test writing, implementation, verification, and delivery.