Skip to content
Skills Library
Programming · Building & coding

dte-feature

/dte-feature

Full-stack new feature spanning front-end AND back-end — plan, implement, and verify across architecture/back-end AND UI/UX/front-end, making sure BOTH are solid. Composes dte-arc-plan (validated plan), dte-arc-work (gated build), dte-ux + the ui.sh family for the front-end, and dte-deep-reviewer + fit-experience-reviewer to verify both layers. Use when the user says "build this feature", "ship this idea end to end", "add <feature> with a UI", or describes something that needs both a model/controller/job AND a screen. Loops over a list of features. Not for a back-end-only change (use dte-arc-w

Repository
dte-skills ↗
Licence
MIT
Last repository change
13.10.2026

Assessment and security

100/ 100Class: good
Format25 / 25
Frontmatter with name and description, valid name, description up to 1,024 characters, name matching the folder.
Discoverability25 / 25
Description explains when to use the skill, has a reasonable length and uses third person.
Content35 / 35
At least 150 words and at most 500 lines, headings, step lists, examples or code.
Hygiene15 / 15
No placeholders such as TODO, no Windows paths, with a licence.
Riskno signals detected in the scan
Files in this package
1
Scripts
0
HTML comments
0
URLs in SKILL.md
0
Deprecation

No signals detected. Repository changed on 13.10.2026, without references to retired models or APIs.

Licence

MIT, open: use and modify while retaining author attribution.

What it does and when to use it

Full-stack new feature spanning front-end AND back-end — plan, implement, and verify across architecture/back-end AND UI/UX/front-end, making sure BOTH are solid. Composes dte-arc-plan (validated plan), dte-arc-work (gated build), dte-ux + the ui.sh family for the front-end, and dte-deep-reviewer + fit-experience-reviewer to verify both layers. Use when the user says "build this feature", "ship this idea end to end", "add <feature> with a UI", or describes something that needs both a model/controller/job AND a screen. Loops over a list of features. Not for a back-end-only change (use dte-arc-w

Triggers from the description

build this featureship this idea end to endadd <feature> with a UI
Original author description

Full-stack new feature spanning front-end AND back-end — plan, implement, and verify across architecture/back-end AND UI/UX/front-end, making sure BOTH are solid. Composes dte-arc-plan (validated plan), dte-arc-work (gated build), dte-ux + the ui.sh family for the front-end, and dte-deep-reviewer + fit-experience-reviewer to verify both layers. Use when the user says "build this feature", "ship this idea end to end", "add <feature> with a UI", or describes something that needs both a model/controller/job AND a screen. Loops over a list of features. Not for a back-end-only change (use dte-arc-w

How it works

  1. Input
  2. Establish the gate FIRST
  3. Cycle (per feature)
  4. For a list of features
  5. Degrade gracefully
  6. Guardrails
  7. Done when
Original SKILL.md headings · 54 lines, 493 words
SKILL.md preview
---
name: dte-feature
description: Full-stack new feature spanning front-end AND back-end — plan, implement, and verify across architecture/back-end AND UI/UX/front-end, making sure BOTH are solid. Composes dte-arc-plan (validated plan), dte-arc-work (gated build), dte-ux + the ui.sh family for the front-end, and dte-deep-reviewer + fit-experience-reviewer to verify both layers. Use when the user says "build this feature", "ship this idea end to end", "add <feature> with a UI", or describes something that needs both a model/controller/job AND a screen. Loops over a list of features. Not for a back-end-only change (use dte-arc-work), pure UI (use dte-ux), or just defining the what (use dte-spec).
---

# dte-feature — full-stack feature: plan → build → verify, both layers solid

Read `../../references/conventions.md` first — **Planning is mandatory and validated**, **Runnable gate**,
**Progress: report every phase**. This skill **changes code on both sides of the stack**. It ensures the
back-end *and* the front-end each get a real plan, real build, and real verification — neither half is an
afterthought. Default: **stop for review after each phase**; `--ship` to auto commit/PR.

## Input
- A feature idea/spec (or a `dte-spec` output). If it's still fuzzy, run **`dte-spec`** first to get a
  validated spec, then come back.
- Or a **list** of features → loop (serial by default on a shared codebase).
- Read the project `CLAUDE.md`/`AGENTS.md`: interactors-not-services, test framework, design system.

## Establish the gate FIRST
Derive the runnable gate (tests + boot/eager-load check; add a JS/asset build + a Lighthouse/a11y check if
the feature ships UI) and confirm green on the current tree. It runs before every commit; red = revert.

## Cycle (per feature)
1. **Branch** — `feat/<slug>`.
2. **Plan BOTH layers.** Run **`dte-arc-plan`** → a validated plan that explicitly covers the back-end
   (models/controllers/jobs/interactors, data, authorization) **and** the front-end (screens, components,
   states, responsiveness, a11y). A plan missing either layer is not done — send it back.
3. **Build back-end.** `/ce-work` the back-end slice. Interactors not services; follow existing patterns;
   tests as you go.
4. **Build front-end.** Hand the UI slice to **`dte-ux --build`** (ui.sh family + frontend-design) — real
   interaction states (loading/empty/error), responsive, dark-mode-aware, accessible. Wire it to the
   back-end.
5. **Elegance.** `/ce-simplify-code` + `ponytail` over the whole diff.
6. **Verify BOTH.** `dte-deep-reviewer` on the diff (correctness/architecture) **and** **`dte-ux --review`**
   / `fit-experience-reviewer` on the UI (states, a11y, look-and-feel). Feed 🔴/🟠 back into 3–4 (≤2 passes,
   then surface what remains). `dte-test-auditor` on changed code.
7. **Gate.** Run the gate. Green → commit + **report the phase** (or `--ship` → `/ce-commit-push-pr`).
   Red → revert the phase, log why, stop.
8. **Report + pause** — what shipped on each layer, both verify verdicts, gate result, branch, what's next.

## For a list of features
One branch per feature; serial by default. Or hand the list to **`dte-loop`** to build a worklist + run it
autonomously. Report + pause per feature.

## Degrade gracefully
- No `dte-ux`/ui.sh → build the UI with `frontend-design` + `fit-experience-reviewer` directly; note it.
- No `dte-arc-plan` → plan via `ce-plan` alone (validation weaker); no `dte-deep-reviewer` → verify with
  `ce-code-review`/`fit-review`. State any missing layer-verifier — never ship a layer unverified silently.

## Guardrails
- **Both layers or it's not done.** A feature with a working back-end and an untested/inaccessible UI (or
  vice-versa) fails the bar — say so, don't ship half.
- Stop-and-ask before push/PR/deploy unless `--ship`. High-sev findings open after 2 passes → not done.

## Done when
The feature is implemented on a branch with back-end **and** front-end built, simplified, **both verified**
(code review + UX/a11y review green-ish), and **gate-green**, with a phase report. Shipped only if `--ship`.

Versions

The database has no other skills named dte-feature.

Database snapshot: 13.11.2026 · package version d5b22df33d27 (SHA-256 digest of the entire package)

Downloads in the last 30 days: 1 · ranking

Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.

Similar skills

  • 90dte-arc-work
    The full cycle for a task, bug, area, or a whole plan index — review, plan, do the work, then verify — with quality gates and progress reporting throughout. Composes dte-arc-review (or a light scan), dte-arc-plan, ce-work, ce-simplify-code/ponytail, and dte-deep-reviewer +…
  • 90dte-arc-plan
    Turn architectural findings, a spec, a bug report, or an "improve area X" request into concrete, validated implementation plan(s) — always built with compound-engineering's ce-plan and validated with expectation-fit's fit-validate-plan. For a massive task it decomposes the work…
  • 100feature-cycle
    End-to-end orchestrator chaining spec → plan → implement → verify → review → ship from a local spec — the whole CLAUDE.md lifecycle as one command. Use to drive a complete feature from a ready spec. To validate what to build first use /office-hours.
  • 100roblox-feature
    End-to-end workflow for a Roblox feature from a plain-language request - understand, plan the client/server split, implement with template modules, lint, verify in Studio, report. Use when the user asks for a new mechanic or system ("make a shop", "add pets", "build an obby", "double jump").
  • 100scaffold
    Scaffold a new feature end-to-end: API contract → database schema → backend service/controller → frontend. Use when building something new from scratch across multiple layers. More opinionated than /implement — always runs the full vertical slice in the correct dependency order.…
  • 100implement-feature
    End-to-end feature implementation workflow. Use when the user says "implement", "build feature", "work on task", "start implementation", or any feature development work. Covers plan review, test writing, implementation, verification, and delivery.

Feedback and reports

Your message goes to Bartosz Sokoliński. An email address is needed only for a reply. See the privacy policy.