dte-arc-work

/dte-arc-work

The full cycle for a task, bug, area, or a whole plan index — review, plan, do the work, then verify — with quality gates and progress reporting throughout. Composes dte-arc-review (or a light scan), dte-arc-plan, ce-work, ce-simplify-code/ponytail, and dte-deep-reviewer + dte-test-auditor to verify. Loops over a list of tasks/bugs OR over a dte-arc-plan INDEX worklist to complete many plans (one branch + gate + report each). Use when the user says "fix this", "do the work", "implement this plan", "work through these plans/tasks", or "handle this end to end". Stops for review after each item b

Repository
dte-skills ↗
Licence
MIT
Last repository change
13.10.2026

Assessment and security

90/ 100Class: good
Format25 / 25
Frontmatter with name and description, valid name, description up to 1,024 characters, name matching the folder.
Discoverability25 / 25
Description explains when to use the skill, has a reasonable length and uses third person.
Content25 / 35
At least 150 words and at most 500 lines, headings, step lists, examples or code.
Hygiene15 / 15
No placeholders such as TODO, no Windows paths, with a licence.
Riskno signals detected in the scan
Files in this package
1
Scripts
0
HTML comments
0
URLs in SKILL.md
0
Deprecation

No signals detected. Repository changed on 13.10.2026, without references to retired models or APIs.

Licence

MIT, open: use and modify while retaining author attribution.

What it does and when to use it

The full cycle for a task, bug, area, or a whole plan index — review, plan, do the work, then verify — with quality gates and progress reporting throughout. Composes dte-arc-review (or a light scan), dte-arc-plan, ce-work, ce-simplify-code/ponytail, and dte-deep-reviewer + dte-test-auditor to verify. Loops over a list of tasks/bugs OR over a dte-arc-plan INDEX worklist to complete many plans (one branch + gate + report each). Use when the user says "fix this", "do the work", "implement this plan", "work through these plans/tasks", or "handle this end to end". Stops for review after each item b

Triggers from the description

fix thisdo the workimplement this planwork through these plans/taskshandle this end to end
Original author description

The full cycle for a task, bug, area, or a whole plan index — review, plan, do the work, then verify — with quality gates and progress reporting throughout. Composes dte-arc-review (or a light scan), dte-arc-plan, ce-work, ce-simplify-code/ponytail, and dte-deep-reviewer + dte-test-auditor to verify. Loops over a list of tasks/bugs OR over a dte-arc-plan INDEX worklist to complete many plans (one branch + gate + report each). Use when the user says "fix this", "do the work", "implement this plan", "work through these plans/tasks", or "handle this end to end". Stops for review after each item b

How it works

  1. Input
  2. Establish the gate FIRST (before any change)
  3. Cycle (per item / phase)
  4. Completing MANY plans (an INDEX worklist)
  5. Guardrails
  6. Done when
Original SKILL.md headings · 49 lines, 468 words
SKILL.md preview
---
name: dte-arc-work
description: The full cycle for a task, bug, area, or a whole plan index — review, plan, do the work, then verify — with quality gates and progress reporting throughout. Composes dte-arc-review (or a light scan), dte-arc-plan, ce-work, ce-simplify-code/ponytail, and dte-deep-reviewer + dte-test-auditor to verify. Loops over a list of tasks/bugs OR over a dte-arc-plan INDEX worklist to complete many plans (one branch + gate + report each). Use when the user says "fix this", "do the work", "implement this plan", "work through these plans/tasks", or "handle this end to end". Stops for review after each item by default; --ship to auto commit/PR. --quick for a small bug, --deep for a real change. Not for a pure root-cause bug hunt (use dte-debug), a full-stack feature with UI (use dte-feature), an upgrade/data migration (use dte-migrate), or setting up an autonomous batch loop (use dte-loop).
---

# dte-arc-work — review → plan → work → verify (looping, gated, reported)

Read `../../references/conventions.md` first — especially **"Progress: report every phase"**,
**"Runnable gate"**, and **"Decomposition"**. This skill **changes code**. Default: **stop for the
user's review** after each item; only commit/PR if `--ship`.

## Input
- A single target (task/bug/area), **or** a list, **or** a `docs/plans/INDEX-<topic>.md` worklist from
  `dte-arc-plan` (the "complete many plans" path).
- Read the project `CLAUDE.md`/`AGENTS.md`; honor interactors-not-services + the project's test framework.

## Establish the gate FIRST (before any change)
Derive the project's runnable gate and confirm it's **green on the current tree**. Detect from: the
plan/INDEX's stated gate, CI config, `bin/rails`/`bin/rake` tasks. If none, use **test suite + a
boot/eager-load check** (e.g. `zeitwerk:check`, `CI=1`). This gate runs before **every** commit. A red
gate is **revert-the-phase**, never patch-around. The gate is the only real safety net — especially if
deploys are not test-gated.

## Cycle (per item / phase)
1. **Branch.** Meaningful name (`fix/...`, `feat/...`). Never the default branch.
2. **Review.** `--deep`: `dte-arc-review` on the affected slice. `--quick`: focused read + `/ce-debug` to
   the root cause (fix the cause, grep all callers first). _If the item already has a validated plan
   (INDEX/`docs/plans`), skip to step 4._
3. **Plan.** `dte-arc-plan` → a **validated** plan (ce-plan + fit-validate-plan; gaps resolved).
4. **Work.** `/ce-work` the plan. Follow existing patterns; write/update tests as you go.
5. **Elegant.** `/ce-simplify-code` + `ponytail` over the diff — the ladder, not just "less code".
6. **Verify.** `dte-deep-reviewer` on the diff + `dte-test-auditor` on changed code. Feed 🔴/🟠 back into
   step 4 (bounded: ≤2 fix passes, then surface what remains).
7. **Gate.** Run the project gate. Green → (commit + tick the worklist box + **report this phase**) or, if
   `--ship`, `/ce-commit-push-pr`. Red → **revert this phase, log why, stop.**
8. **Report + pause.** Print a phase report — what changed, verify verdict, gate result, branch, what's
   next — and **pause for go-ahead** (default cadence). Never advance silently.

## Completing MANY plans (an INDEX worklist)
Treat it like the proven loop: read `INDEX-<topic>.md` → take the **first unchecked, dependency-ready**
plan → run steps 1/4–8 for it (each plan already validated by `dte-arc-plan`) → on green, tick its box +
update the pointer + report + pause → next. One branch per plan unless the INDEX says otherwise. Maintain
an iteration log. **Serial by default** for a shared codebase (avoid index/merge races).

## Guardrails
- Stop-and-ask before anything irreversible/outward-facing (push, PR, deploy) unless `--ship`.
- High-severity findings still open after 2 passes → **not done**; surface them.
- Trace the whole problem before picking a fix; a small diff in the wrong place is a second bug.

## Done when
Each item/plan is implemented on a branch, simplified, **verified**, and **gate-green**, with the
worklist updated and a phase report given. Shipped only if `--ship`.

Versions

The database has no other skills named dte-arc-work.

Database snapshot: 13.11.2026 · package version 88761d0d7483 (SHA-256 digest of the entire package)

Downloads in the last 30 days: 2 · ranking

Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.

Similar skills

  • 100dte-feature
    Full-stack new feature spanning front-end AND back-end — plan, implement, and verify across architecture/back-end AND UI/UX/front-end, making sure BOTH are solid. Composes dte-arc-plan (validated plan), dte-arc-work (gated build), dte-ux + the ui.sh family for the front-end, and…
  • 100dte-loop
    Set up an autonomous, gated loop over a batch of work — turn "I have many plans to implement / reviews to run / bugs to fix" into a worklist doc the loop iterates, with every predictable decision asked UP FRONT, then emit the exact command to trigger it. Each item runs on its…
  • 100ship
    Full-cycle development workflow for any non-trivial feature or fix. Runs up to 10 phases (explore+interview loop, plan, implement, verify, edge cases, e2e tests, code review, security review, final verify) using the strongest available model for planning and autonomous goal…
  • 86arc-workflow
    Use when the operator requests Arc's evidence-gated plan, progress, checks, and independent review workflow for a multi-step coding task.
  • 98arc
    Full plan-to-merged-PR pipeline with checkpoint framework, QA phases, and multi-agent orchestration. Use when running end-to-end from plan to merge, resuming an interrupted arc with --resume after a crash or session end, or when any named phase fails (forge, work, code-review,…
  • 100implement-feature
    End-to-end feature implementation workflow. Use when the user says "implement", "build feature", "work on task", "start implementation", or any feature development work. Covers plan review, test writing, implementation, verification, and delivery.

Feedback and reports

Your message goes to Bartosz Sokoliński. An email address is needed only for a reply. See the privacy policy.