test-strategy-author
/test-strategy-author
Pisze strategię testów i master test plan: zakres, typy testów, priorytety ryzyka, narzędzia, środowiska i kryteria wyjścia.
- Autor
- testland ↗
- Repozytorium
- qa-skills ↗
- Licencja
- MIT
- Ostatnia zmiana repozytorium
- 12.11.2026
Ocena i bezpieczeństwo
- Pliki w paczce
- 1
- Skrypty
- 0
- Komentarze HTML
- 0
- Adresy URL w SKILL.md
- 6
Brak sygnałów. Repozytorium zmienione 12.11.2026, bez odwołań do wycofanych modeli i API.
MIT, otwarta: można używać i zmieniać, z zachowaniem informacji o autorze.
Co robi i kiedy
Pisze strategię testów i master test plan: zakres, typy testów, priorytety ryzyka, narzędzia, środowiska i kryteria wyjścia.
Oryginalny opis (EN)
Use for any question or task about a test strategy or master test plan, including what one contains or teams that test inconsistently so nobody knows what was tested: scope, test types per layer, risk-based prioritization, tools, environments, exit criteria and ownership, plus a budgeted per-risk test plan with owners and effort, for stakeholder sign-off.
Jak działa
- Overview
- When to use
- Step 1 - Document structure
- Step 1a - Validate the draft before approval
- Step 2 - Tailor per project size
- Step 3 - Review cadence
- Step 4 - Reference patterns
- Step 5 - Risk-based test planning (per feature / per quarter)
- Anti-patterns
- Limitations
Podgląd SKILL.md
--- name: test-strategy-author description: "Use for any question or task about a test strategy or master test plan, including what one contains or teams that test inconsistently so nobody knows what was tested: scope, test types per layer, risk-based prioritization, tools, environments, exit criteria and ownership, plus a budgeted per-risk test plan with owners and effort, for stakeholder sign-off." --- # test-strategy-author ## Overview A test strategy document answers the question "how do we know we're testing the right things?" Without it, test investment is gut-feel; with it, the team has a defensible artifact tying test work to risk and business goals. The ISTQB glossary defines a test strategy as "A high-level description of the test levels to be performed and the testing within those levels" ([istqb-strategy][istqb-strategy]). This skill produces that document, then the per-feature risk-based plan under it (Step 5). [istqb-strategy]: https://istqb-glossary.page/test-strategy/ [istqb-exit]: https://istqb-glossary.page/exit-criteria/ [istqb-rbt]: https://istqb-glossary.page/risk-based-testing/ [pyramid]: https://martinfowler.com/articles/practical-test-pyramid.html [wcag22]: https://www.w3.org/TR/WCAG22/ [owasp-top10]: https://owasp.org/www-project-top-ten/ ## When to use - A new product / large feature is in planning; the team needs to scope test investment. - A multi-quarter initiative needs a published strategy stakeholders can review. - An audit / compliance review requires a documented strategy. - A new team forming around a product needs onboarding context. For per-feature test plans (smaller scope), use the lighter-weight `risk-matrix` - strategy is for larger horizons. ## Step 1 - Document structure ```markdown # Test Strategy - `<product / release>` **Author:** _______________ **Date:** YYYY-MM-DD **Status:** Draft | Review | Approved **Stakeholders:** Engineering, Product, QA, Compliance ## 1. Scope ### In scope - (List of features / surfaces this strategy covers) ### Out of scope - (Explicit list of what's NOT covered, with rationale) ### Assumptions - (List of context the strategy depends on) ## 2. Risk basis (Reference the risk matrix per `risk-matrix`) | Risk class | Top risks (from matrix) | Test investment | |------------|-------------------------|-----------------| | Business | Promo math, Tax calculations | Property-based + UAT | | Technical | Webhook reliability, DB migrations | Chaos + integration | | Regulatory | EU GDPR, CCPA | UAT + privacy review | | Performance | Checkout latency | Load + canary | ## 3. Test types per layer (the pyramid) Per the test pyramid (`test-pyramid-balancer`). The coverage targets below are example values to replace with the team's own; no standard fixes them. | Layer | Coverage target (example) | Tools | Owner | |-------------|----------------:|-------|-------| | Unit | 80% | Jest, pytest, JUnit | Devs | | Integration | 60% | Testcontainers, supertest | Devs | | Contract | 100% of consumer-provider pairs | Pact | Devs | | E2E | Critical paths (5-10 flows) | Playwright | QA | | Performance | Critical endpoints | k6 + Lighthouse CI | QA + SRE | | Security | OWASP Top 10 (2025) | Schemathesis + manual pen test | Security | | A11y | WCAG 2.2 AA | axe + manual review | QA | ## 4. Tooling (Stack inventory per layer; references to specific skills) ## 5. Environments - **Local dev** - per-engineer; Testcontainers backing services. - **Staging** - shared; smoke + UAT. - **Canary** - 5% prod traffic; 30-min observation per prod-canary-validator. - **Prod** - synthetic monitors per synthetic-monitor-author. ## 6. Test data - **Synthetic accounts** - per synthetic-data-toolkit. - **PII handling** - per synthetic-pii-generator. - **Database state** - per database snapshot / restore. ## 7. Exit criteria Release ships when: - All AC for in-scope features pass. - All unit/integration tests green; no flake in last 3 main runs. - E2E critical-path suite green. - Coverage targets met per Section 3. - Performance targets met (p95 within budget). - A11y regression scan green. - Threat model reviewed for security-touching changes. - Risk matrix Critical (>=15) all mitigated. ## 8. Ownership | Activity | Owner | Backup | |-----------------------|-------|--------| | Unit test reviews | Devs | Tech lead | | E2E suite maintenance | QA | Dev TPM | | Perf budget approval | SRE | QA | | Threat model authorship | Security | Dev TPM | | Synthetic monitors | SRE | QA | | Risk matrix updates | QA | Product | ## 9. Cadence - **Per-PR:** Lint, unit, integration, smoke E2E, coverage delta. - **Per-merge to main:** Full E2E, perf gate. - **Nightly:** Full regression, mutation testing weekly. - **Pre-release:** Manual UAT sign-off, full security scan, release-readiness check. ## 10. Risk register snapshot (Top 10 risks from the matrix as of strategy authoring date) ## 11. Open questions / decisions needed - (List of unresolved items requiring stakeholder input) ## Approval - [ ] Engineering manager - [ ] QA lead - [ ] Product manager - [ ] Security (if applicable) ``` Sources behind the template sections: - **Section 2 (risk basis).** ISTQB defines risk-based testing as an approach "to reduce the level of product risks and inform stakeholders of their status", which "involves the identification of product risks and the use of risk levels to guide the test process" ([istqb-rbt][istqb-rbt]). That is why every layer's investment in Section 3 traces back to a risk row. - **Section 3 (layers).** The pyramid's two rules from [practical-test-pyramid][pyramid]: "Write tests with different granularity" and "The more high-level you get the fewer tests you should have". Keep E2E to the critical paths; per the same article, "Due to their high maintenance cost you should aim to reduce the number of end-to-end tests to a bare minimum." - **Section 3 (security and a11y rows).** "The OWASP Top 10 is the reference standard for the most critical web application security risks" ([owasp-top10][owasp-top10]); WCAG 2.2 is a W3C Recommendation (12 December 2024) with "three levels of conformance ... A (lowest), AA, and AAA (highest)" ([wcag22][wcag22]). Write down which level the product must meet and who set it (a law, a contract, a policy). - **Section 7 (exit criteria).** ISTQB: exit criteria are conditions "agreed upon with the stakeholders", and "Exit criteria are used to report against and to plan when to stop testing" ([istqb-exit][istqb-exit]). That is why each one must be measurable and signed off in Approval. ## Step 1a - Validate the draft before approval Before circulating for sign-off, verify the draft against its own exit gate: - Assert every in-scope feature in Section 1 maps to a risk class in Section 2, a layer + coverage target in Section 3, and at least one exit criterion in Section 7. - Assert every Section 7 exit criterion is measurable (a number or a green/red check), not a subjective phrase. If a section cannot be filled - for example the risk matrix in Section 2 does not exist yet - record it as an open question in Section 11 rather than leaving the section blank, resolve it, then re-run this check. Collect the Approval sign-offs only once no Section 11 item still blocks release. ## Step 2 - Tailor per project size | Project size | Strategy length | Scope | |--------------|----------------:|----------| | Small (1-3 mo) | 2-3 pages | Sections 1-3 + 7 | | Medium (1-2 quarters) | 5-7 pages | All sections | | Large (multi-quarter) | 10+ pages | All + sub-strategies per major feature | ## Step 3 - Review cadence | Trigger | Action | |--------------------------------------------------|--------------------------------------------------| | Quarterly | Re-review; update sections 2 (risks), 7 (exit), 10 (snapshot). | | Major architectural change | Re-author Sections 3 + 6. | | Post-incident | Update Section 2 (new risks); Section 7 (new exit criterion). | | New compliance requirement | Section 1 + Section 7. | ## Step 4 - Reference patterns Common strategy patterns by product type: | Product type | Strategy emphasis | |----------------------|---------------------------------------------------------| | E-commerce | Business risks (promo math, currency, tax); UAT-heavy. | | SaaS B2B | Security + multi-tenancy; contract testing critical. | | Mobile native | Per-platform matrix; manual tier; performance. | | Internal tooling | Light strategy; integration over E2E. | | Regulated (fintech, health) | Heavyweight RBT (FMEA); auditable trail. | ## Step 5 - Risk-based test planning (per feature / per quarter) The strategy sets the frame; a per-feature plan allocates the hours. Given a feature scope, the current risk matrix (per `risk-matrix`), an engineer-week budget, and the team's tooling inventory, produce a risk-prioritized test plan: 1. **Identify scope-relevant risks.** Direct hits (the feature modifies code in a risk's source paths) plus area-level hits (same product area as an existing risk row). No matrix, no plan - author the matrix first. 2. **Map each risk to test types** per `risk-matrix` Step 4 (business logic -> unit + property-based + UAT; technical -> integration + chaos + load; regulatory -> stakeholder UAT + compliance review; and so on). 3. **Estimate effort per test type** (rough starting points the team calibrates): unit 0.5h, property-based 2h, integration / contract 4h, E2E 8h, manual / UAT 4h per scenario, visual regression 2h per baseline, load 1d, chaos 2d, threat model 1d. 4. **Emit the plan** with a per-risk table (risk, score, class, test types, effort, owner), a budget-allocation summary with ~20% headroom for incident response and retests, and a **"Risks NOT addressed (intentional)"** table naming each skipped risk and why - the audit trail that distinguishes prioritization from neglect. ```markdown ## Test plan - Feature `Promo banner v2` **Risks implicated:** 6 (of 23) · **Budget:** 2 engineer-weeks · **Estimated:** 1.6 weeks (within budget) | Risk | Score | Class | Test types | Effort | Owner | |---|---:|---|---|---|---| | R-1 Promo math | 15 | Business logic | + 4 unit + 1 property-based | 4 hours | Alice | | R-2 Stripe webhook | 16 | Technical | + 1 integration + 1 chaos | 1.5 days | Bob | | R-3 EU tax calc | 10 | Regulatory | + 1 UAT with finance | 4 hours | Carol | ### Risks NOT addressed (intentional) | Risk | Score | Why skipped | |---|---:|---| | R-15 Old promo CMS migration | 3 | Below threshold; manual smoke covers. | ``` Planning guardrails: never plan more than 20% over budget; never skip the highest-scored Critical risk (>=15) under budget pressure - escalate to product instead; never pick test types the team has no tooling for. Version plans in markdown alongside the matrix and track revisions rather than silently rewriting prior versions. ## Anti-patterns | Anti-pattern | Why it fails | Fix | |-----------------------------------------------------------------------|---------------------------------------------------------------------------|-----| | Generic strategy template not tailored to product | Reads like boilerplate; nobody references. | Tailor per Section 1 (scope) and Section 4 (tooling). | | Plan ignores the effort budget | Idealistic; team can't execute. | Match plan to budget (Step 5). | | Skipping Critical risks under budget pressure | Defeats the prioritization purpose. | Escalate to product instead (Step 5 guardrails). | | No "risks NOT addressed" section in the plan | Audit gap; prioritization indistinguishable from neglect. | Always include it (Step 5). | | Strategy authored once; never reviewed | Becomes obsolete; team distrusts. | Quarterly cadence (Step 3). | | No exit criteria | "Done" is subjective; release decisions arbitrary. | Section 7 - explicit + measurable. | | Strategy = test plan | Per [istqb-strategy][istqb-strategy] a strategy is "high-level"; per-feature plans are detailed (different artifact). | Use Step 5 and `risk-matrix` for per-feature plans. | | Copying the example coverage targets as if they were a standard | 80% / 60% are placeholders; the right number depends on the codebase and risk. | Set targets from the risk matrix and current baseline. | | Owner column missing | Activities slip; "everyone owns it = nobody." | Section 8 explicit owners. | | Strategy in slides, not version-controlled | History lost; updates invisible. | Markdown + git. | ## Limitations - **Strategy ≠ execution.** A great strategy doesn't ensure great testing - pair with per-feature plans + per-PR enforcement. - **Quarterly cadence is a floor.** Fast-moving products may need more frequent revisits. - **Stakeholder buy-in required.** A strategy nobody read is paperwork; circulate, present, get sign-off. ## References - [istqb-strategy][istqb-strategy] - ISTQB glossary: test strategy. - [istqb-rbt][istqb-rbt] - ISTQB glossary: risk-based testing. - [istqb-exit][istqb-exit] - ISTQB glossary: exit criteria. - [pyramid][pyramid] - Martin Fowler site, "The Practical Test Pyramid": test granularity, fewer high-level tests. - [owasp-top10][owasp-top10] - OWASP Top 10 (2025 edition). - [wcag22][wcag22] - WCAG 2.2, W3C Recommendation, conformance levels. - `risk-matrix` - feeds Section 2. - `test-pyramid-balancer` - feeds Section 3. - `definition-of-done` - feeds Section 7.
Wersje
| Repozytorium | Wynik | Licencja |
|---|---|---|
| Ta strona · testland/qa-skills | 100 | MIT |
| testland/qa | 100 | MIT |
Migawka bazy z 13.11.2026 · wersja paczki 88ad7604fbdf (skrót SHA-256 całej paczki)
Pobrania w ostatnich 30 dniach: 1 · ranking
Zgłoś problem z tym skillem: szkodliwa treść, błędny opis albo prośba autora o usunięcie.
Podobne skille
- 10001-test-strategy
Tworzy lub aktualizuje strategię testów projektu: poziomy i typy testów oparte na ryzyku, środowiska, narzędzia oraz kryteria wejścia i wyjścia. - 90risk-based-test-plan
Układa lekki plan testów opartych na ryzyku dla funkcji lub wydania: macierz ryzyka, podejście, dane i kryteria wejścia i wyjścia. - 100test-strategy
Tworzy wielokwartalny dokument strategii QA: zakres, priorytety według ryzyka, poziomy testów, analiza piramidy, kryteria wejścia i wyjścia, KPI jakości, dobór narzędzi i harmonogram. - 100qa-strategy
Tworzy strategię testów, macierz pokrycia i plan priorytetyzacji opartej na ryzyku, wskazując zakres i głębokość testów. - 100test-planning
Buduje plan testów dla pojedynczego sprintu lub wydania: rozbicie funkcji na scenariusze, mapowanie wymagań na testy, szacowanie nakładu, macierze priorytetów i harmonogram z buforami. - 90test-strategy
Prawdopodobnie prowadzi etap strategii testów w procesie pipeline, gdy stan to test-strategy.