work-order-draft
/work-order-draft
Use when a maintenance planner asks to prepare a preventive work order for an asset, with its history, materials, long-lead parts, crew or outage; returns a draft that is never raised.
- Author
- microsoft ↗
- Repository
- aibast-agents-library ↗
- Licence
- MIT
- Last repository change
- 13.11.2026
Assessment and security
- Files in this package
- 1
- Scripts
- 0
- HTML comments
- 0
- URLs in SKILL.md
- 0
No signals detected. Repository changed on 13.11.2026, without references to retired models or APIs.
MIT, open: use and modify while retaining author attribution.
What it does and when to use it
Use when a maintenance planner asks to prepare a preventive work order for an asset, with its history, materials, long-lead parts, crew or outage; returns a draft that is never raised.
Original author description
Use when a maintenance planner asks to prepare a preventive work order for an asset, with its history, materials, long-lead parts, crew or outage; returns a draft that is never raised.
How it works
- Procedure
- Deterministic pilot evidence
- Safety gate
SKILL.md preview
--- name: work-order-draft description: "Use when a maintenance planner asks to prepare a preventive work order for an asset, with its history, materials, long-lead parts, crew or outage; returns a draft that is never raised." --- # Work order draft Use when a maintenance planner asks to prepare a preventive work order for an asset, with its history, materials, long-lead parts, crew or outage; returns a draft that is never raised. ## Procedure 1. Use only the uploaded synthetic records and rules. 2. Lead with the specific evidence that answers the persona's question. 3. Keep the figures, identifiers, and tables exactly as recorded for case `GAM-02`. 4. Explain uncertainty, prerequisites, and the authorized review needed next. 5. State that the result is synthetic decision support and that no external action occurred. ## Deterministic pilot evidence - `Preventive Work Order Draft` - `Tap changer contact kit` - `Substation Crew B` ## Safety gate Do not claim to have raised, approved, or scheduled a work order, ordered or reserved a part, assigned a crew, planned switching, changed the asset register or fixed asset register, or committed capital. Stop at a reviewable draft for the authorized engineer to approve.
Versions
The database has no other skills named work-order-draft.
Database snapshot: 13.11.2026 · package version 85435e0eae59 (SHA-256 digest of the entire package)
Downloads in the last 30 days: 0 · ranking
Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.
Similar skills
- 100industrial-maintenance-planner
Maintenance Planning Analyst: Check asset identifiers and reconcile work orders with actual maintenance history. Use when the user asks for maintenance planning analyst work, or mentions industrial, maintenance, planner.