work-breakdown

/work-breakdown

Splits a spec into an ordered list of tasks, each with a single verifiable outcome, an assigned tier, and a delegation brief. Use when a spec exists but there is no plan, when work must be divided across agents or people, or when a task is too large to verify in one step. Produces a plan file, not code.

Licence
MIT
Last repository change
26.09.2026

Assessment and security

100/ 100Class: good
Format25 / 25
Frontmatter with name and description, valid name, description up to 1,024 characters, name matching the folder.
Discoverability25 / 25
Description explains when to use the skill, has a reasonable length and uses third person.
Content35 / 35
At least 150 words and at most 500 lines, headings, step lists, examples or code.
Hygiene15 / 15
No placeholders such as TODO, no Windows paths, with a licence.
Riskno signals detected in the scan
Files in this package
1
Scripts
0
HTML comments
0
URLs in SKILL.md
0
Deprecation

No signals detected. Repository changed on 26.09.2026, without references to retired models or APIs.

Licence

MIT, open: use and modify while retaining author attribution.

What it does and when to use it

Splits a spec into an ordered list of tasks, each with a single verifiable outcome, an assigned tier, and a delegation brief. Use when a spec exists but there is no plan, when work must be divided across agents or people, or when a task is too large to verify in one step. Produces a plan file, not code.

Original author description

Splits a spec into an ordered list of tasks, each with a single verifiable outcome, an assigned tier, and a delegation brief. Use when a spec exists but there is no plan, when work must be divided across agents or people, or when a task is too large to verify in one step. Produces a plan file, not code.

How it works

  1. Process
  2. Task format
  3. Sizing heuristics
  4. Ordering
  5. Output
  6. Verification
  7. Red flags
Original SKILL.md headings · 102 lines, 711 words
SKILL.md preview
---
name: work-breakdown
description: Splits a spec into an ordered list of tasks, each with a single verifiable outcome, an assigned tier, and a delegation brief. Use when a spec exists but there is no plan, when work must be divided across agents or people, or when a task is too large to verify in one step. Produces a plan file, not code.
license: MIT
metadata:
  phase: plan
  owners: [tech-lead]
  version: "0.1.0"
---

# Work Breakdown

A plan is right when each task has one outcome you can check with one command, and the
order puts the riskiest thing first.

If there is no spec, use `spec-writing` first. Planning against unwritten requirements
produces a plan that changes every day.

## Process

1. **Read the repository before planning.** Existing patterns constrain the plan more than
   preferences do. Note the conventions you found, with paths, and plan inside them or
   state the deliberate deviation.

2. **Cut along seams that already exist.** A task spanning three modules is either three
   tasks or one badly-drawn boundary. Prefer boundaries the code already has.

3. **Order by risk, not by ease.** The task that could invalidate the rest of the plan goes
   first. If an unknown could do that, task one is a spike whose output is an answer, not
   code you keep.

4. **Size to one verifiable outcome.** A task is right-sized when its definition of done is
   a single command whose output you can read. Three commands means three tasks.

5. **Assign the lowest tier that clears the ceiling** (`references/escalation-ladder.md`).
   Over-assignment hides a vague brief.

6. **Write a brief per task.** A task without one comes back wrong, and that is the
   planner's defect.

7. **State dependencies explicitly.** Tasks with no dependency between them can run in
   parallel, but two tasks that edit the same file are one task.

## Task format

```markdown
- [ ] **<id> · <title>** — `<agent>`
  - Goal: <one sentence in observable behavior>
  - Files in scope: <explicit paths>
  - Pattern to follow: <path:line>
  - Definition of done: `<the single command that must pass>`
  - Out of scope: <what to leave alone>
  - Stop condition: <what triggers an escalation>
  - Depends on: <ids, or none>
```

## Sizing heuristics

| Symptom | Fix |
|---------|-----|
| The definition of done needs three commands | Split into three tasks |
| The task title contains "and" | Split at the "and" |
| You cannot name the files in scope | You do not understand it yet. Investigate first, as its own task. |
| The task touches more than one module | Either split, or the boundary is wrong |
| Estimating it feels impossible | It contains an unknown. Make removing that unknown task one. |

## Ordering

- Riskiest first. The purpose of order is to find out early that the plan is wrong.
- A task that unblocks several others outranks a task that unblocks none.
- Group tasks that touch the same file so they do not run in parallel.
- Prefer an order where each step leaves the system working. A plan with a broken middle
  cannot be paused, and plans always get paused.

## Output

```markdown
## Plan: <feature>

### Sequence rationale
<which task removes the most risk, and why this order>

### Parallelisable
<which ids can run at once, and which must not share files>

### Tasks
<the task list>

### Not in this plan
<what was deliberately left out>
```

## Verification

- Every task has a definition of done that is a runnable command.
- Every task is assigned a tier, and the assignment clears that tier's ceiling.
- The dependency graph has no cycle.
- The first task is the riskiest, or the rationale says why not.
- No two parallel tasks edit the same file.

## Red flags

| Thought | Reality |
|---------|---------|
| "I'll do the easy tasks first for momentum" | You will discover the plan is wrong at the end instead of the start. |
| "This task is obvious, no brief needed" | Obvious to you. The brief is for whoever picks it up. |
| "I'll assign it senior to be safe" | Over-assignment is a symptom of a vague brief, not caution. |
| "The order does not matter much" | Order is the plan. If it did not matter you would not need one. |
| "I'll write this task myself, it is small" | Then it is a T0 task with a brief. Your output is the plan. |
| "We can plan the rest as we go" | Plan to the next verifiable milestone at least. Beyond that, say so explicitly. |

Versions

RepositoryScoreLicence
This page · khuynh22/agent-dev-team100MIT
dnlrsls/gentle-stack95MIT

Database snapshot: 13.11.2026 · package version b64e5df23b12 (SHA-256 digest of the entire package)

Downloads in the last 30 days: 3 · ranking

Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.

Similar skills

  • 100breakdown
    Use when a feature with a spec and a plan needs its ordered task list: \"break this into tasks\", \"make the task list\", \"what are the steps to build this?\", \"generate tasks.md\", a feature folder with plan.md and no tasks.md, or a task list made stale by a spec or plan…
  • 100planning-and-task-breakdown
    Breaks work into ordered tasks. Use when you have a spec or clear requirements and need to break work into implementable tasks. Use when a task feels too large to start, when you need to estimate scope, or when parallel work is possible.
  • 100planning-and-task-breakdown
    Breaks work into ordered tasks. Use when you have a spec and need implementable tasks, when a task feels too large to start, when you need to estimate scope, or when parallel work is possible.
  • 100planning-and-task-breakdown
    Decompose specs into small, ordered tasks with acceptance criteria and verification steps. Use when you have requirements and need an implementable plan or task list. Triggers: "break down tasks", "implementation plan", "task breakdown", "plan mode".
  • 100brief-to-tasks
    Break a design brief into an ordered checklist of independently buildable tasks using vertical slices. Saves as a markdown checklist. Use when user wants to break down work, create tasks from a brief, plan implementation order, or mentions "tasks" or "breakdown".
  • 90planning
    Breaks a feature into ordered, verifiable tasks in a plan file and assigns a model per task. Use when the user asks for a plan, a task breakdown, or which model fits a plan task, or a change spans several files. Not for small edits or reviews.

Feedback and reports

Your message goes to Bartosz Sokoliński. An email address is needed only for a reply. See the privacy policy.