rpi-implement
/rpi-implement
Execute an approved plan from .rpi/plans phase by phase with TDD and per-phase verification. Use when user says 'implement the plan', 'start implementing', 'run the next phase', or just approved a plan.
Assessment and security
- Files in this package
- 1
- Scripts
- 0
- HTML comments
- 0
- URLs in SKILL.md
- 0
No signals detected. Repository changed on 19.07.2026, without references to retired models or APIs.
MIT, open: use and modify while retaining author attribution.
What it does and when to use it
Execute an approved plan from .rpi/plans phase by phase with TDD and per-phase verification. Use when user says 'implement the plan', 'start implementing', 'run the next phase', or just approved a plan.
Triggers from the description
Original author description
Execute an approved plan from .rpi/plans phase by phase with TDD and per-phase verification. Use when user says 'implement the plan', 'start implementing', 'run the next phase', or just approved a plan.
How it works
- Goal
- Invariants
- Principles
SKILL.md preview
--- name: rpi-implement description: Execute an approved plan from .rpi/plans phase by phase with TDD and per-phase verification. Use when user says 'implement the plan', 'start implementing', 'run the next phase', or just approved a plan. --- # Implement Plan ## Goal Execute an active plan from `.rpi/plans/` phase by phase. Plans come in two forms: pipeline plans (reference designs and research) or standalone plans (self-contained). After all phases are complete and verified, announce completion and update the plan status. Then suggest → `/rpi:rpi-verify <plan-path>` for an independent verification report. ## Invariants - See the project's RPI Skill Contract for `--ff` semantics; the per-phase `Under --ff, ...` modifiers below describe how this skill implements that contract - Validate the plan's status before starting — draft/active: proceed; complete: warn about duplication - Resolve the plan's artifact chain and read all upstream context (designs, research, specs) - Read all files mentioned in the plan fully — never use limit/offset - Transition the plan to active status when starting - Check current progress (completed vs remaining items) — resume from first unchecked item - **Pre-review**: before writing code for a phase, present all intended changes for approval — flag any deviations from plan. Under `--ff`, skip the preview and write the changes directly. - **Red/green TDD**: for new code, write tests first (confirm they fail), then implement until they pass - Run success criteria checks after each phase — fix issues before proceeding - Update checkboxes in the plan file as items complete - **Before committing**: scan staged files for sensitive content — warn and exclude if flagged - **Before committing**: scan staged files against `.gitignore` rules — warn and silently drop any matches from the stage list (commonly: plan, design, research, diagnosis, or review artifacts under the default tracked-specs policy) - **Auto-commit**: after each phase passes its checks, commit automatically without manual confirmation — use descriptive messages matching repo style - **After hook failure**: read error, fix the issue, re-stage, create a new commit (never amend) - If a phase's success criteria are fully covered by automated checks (tests, linting, etc.), run them and proceed automatically when they pass — only pause for manual verification when the plan includes manual verification items not covered by automated tests. Under `--ff`, skip manual verification pauses too — mark unverified items as `[unverified — --ff]` in the plan checkbox text. - **On mismatch**: stop, present what the plan says vs what you found, ask how to proceed - **Context recovery**: if context seems lost or you're unsure which phase you're on, call the context essentials tool to restore your implementation context - **On completion**: verify spec conformance for all linked specs — extract scenarios using the verify spec tool, then check each scenario against actual code and tests; plan → complete - Under `--ff`, after the plan transitions to complete, invoke `/rpi:rpi-verify <plan-path>` via the Skill tool as the chain's terminal step. ## Principles - Follow the plan's intent while adapting to what you find — your judgment matters - Implement each phase fully before moving to the next - Trust completed checkmarks when resuming — verify only if something seems off **Recommended model:** premium tier, medium effort — executing a fixed plan; correctness matters, the search space is bounded. Advisory; see `docs/model-routing.md`.
Versions
| Repository | Score | Licence |
|---|---|---|
| This page · a-ngj/rpi | 90 | MIT |
| microsoft/hve-core | 90 | MIT |
| a-ngj/rpi | 90 | MIT |
Database snapshot: 13.11.2026 · package version 9465e6f9c16c (SHA-256 digest of the entire package)
Downloads in the last 30 days: 1 · ranking
Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.
Similar skills
- 100implement-plan
Execute an approved implementation plan from the configured plans directory. Use when the user wants to implement a plan phase by phase with verification. - 100research-plan-implement
Three-phase RPI workflow (Research, Plan, Implement). Use for non-trivial code changes. - 100rpi
Coordinate a resumable RPI session through Research, Plan, Implement, Review, and Follow-up with durable session state and RPI Workflow canvas integration. Use when a task needs multi-phase RPI lifecycle coordination. - 100implement-plan
Use when the user wants to execute an approved implementation plan and says any of "do it" (with a plan in scope), "lets do it" / "let's do it", "confirmed" (as approval to proceed on a plan), "implement the plan", "implement this", "execute the plan", "start implementing",… - 95Implementation
Execute implementation tasks from task documents following TDD workflow, phase-by-phase execution, and real-time progress tracking. USE WHEN implement, execute tasks, run tasks, start implementation, build feature, execute implementation, code the feature. - 100rpi-plan
Create or resume an evidence-based RPI implementation plan with an optional independent critique. Use when a task needs an implementation plan or an existing plan needs revision.