rip
/rip
Review a technical implementation plan for business-value alignment and scope fit. Use when asked to 'review my plan', 'walk through implementation', 'check plan against PRD', 'review technical decomposition', or 'is my plan aligned with requirements'. NOT for code review (use /sr), NOT for creating tasks (use /ct), NOT for static code analysis (use /code-analysis).
- Author
- alexandrbasis ↗
- Repository
- claudops ↗
- Licence
- MIT
- Last repository change
- 08.09.2026
Assessment and security
- Files in this package
- 1
- Scripts
- 0
- HTML comments
- 1
- URLs in SKILL.md
- 0
No signals detected. Repository changed on 08.09.2026, without references to retired models or APIs.
MIT, open: use and modify while retaining author attribution.
- SKILL.md zawiera komentarze HTML (1). Nie widać ich w podglądzie Markdown, a model je czyta.
What it does and when to use it
Review a technical implementation plan for business-value alignment and scope fit. Use when asked to 'review my plan', 'walk through implementation', 'check plan against PRD', 'review technical decomposition', or 'is my plan aligned with requirements'. NOT for code review (use /sr), NOT for creating tasks (use /ct), NOT for static code analysis (use /code-analysis).
Triggers from the description
Original author description
Review a technical implementation plan for business-value alignment and scope fit. Use when asked to 'review my plan', 'walk through implementation', 'check plan against PRD', 'review technical decomposition', or 'is my plan aligned with requirements'. NOT for code review (use /sr), NOT for creating tasks (use /ct), NOT for static code analysis (use /code-analysis).
How it works
- Protocol
- Rules
- Example
- Related Skills
- Completion
SKILL.md preview
--- name: rip description: Review a technical implementation plan for business-value alignment and scope fit. Use when asked to 'review my plan', 'walk through implementation', 'check plan against PRD', 'review technical decomposition', or 'is my plan aligned with requirements'. NOT for code review (use /sr), NOT for creating tasks (use /ct), NOT for static code analysis (use /code-analysis). allowed-tools: Read Grep Glob AskUserQuestion metadata: claude_argument_hint: '["plan-file-path"]' compatibility: Portable clients may not enforce Claude Code invocation guards or project setup behavior. --- <!-- claudops-build: project-config-pointer --> > If `.claude/skills/rip/SKILL.md.disabled` exists, stop before reading a fallback. > **Project configuration:** If the current project contains `.claude/skills/rip/SKILL.md`, read and apply it instead of this bundled default. The project copy is the capability source of truth. > **Repository context:** Read `../setup/references/task-context.md` when resolving a task, project commands, named agent roles, or legacy `.claude/` resource paths. Use repository evidence and applicable project instructions; a missing local workflow copy does not require setup. Resolve bundled resources from the installed skill, never from the target cwd. # Review Implementation Plan (RIP) Step-by-step review of implementation plan. Focus: **business value** through technical understanding. Resolve the plan and related inputs with [`../setup/references/task-context.md`](../setup/references/task-context.md). This is an optional read-only walkthrough after planning; it does not create a second plan or task. ## Protocol ### Phase 1: Analysis Before responding: 1. Read the resolved active plan completely. If the argument is a directory or ambiguous path, use the task resolver and Glob for plan-shaped files (`tech-decomposition-*.md`, `*implementation-plan*.md`) before asking the user to choose. 2. Study related code (Grep, Read) — verify, don't assume. Never comment on a file you have not opened; if the plan names a file, read it before evaluating the step that touches it. 3. Compare with PRD/business requirements — run alignment checklist: - Measurable outcomes/KPIs defined? - Scope matches PRD (no creep, no gaps)? - Risks or dependencies identified? - Each step ties to a user-facing outcome? 4. Determine business value of each step 5. If an ambiguity or missing context would change the review, use AskUserQuestion to clarify; otherwise state the review assumption and continue. Record mismatches (extra features, missed requirements, logic conflicts) for discussion. Frame each as **facts + question** rather than a verdict — the plan author knows the product context you don't, and a question invites a fix instead of a defense. **Review format:** ``` ## Overview **Business goal:** [what problem it solves] **Scope:** [components] | [files] | [complexity] **Plan:** [N steps with names] **Warnings (include uncertain ones with confidence tag):** - [Problem] — contradicts [source] Begin the walkthrough after the overview unless a material ambiguity needs user input. ``` ### Phase 2: Walkthrough Default to a continuous walkthrough in one response (all steps, back-to-back) — 4.7 calibrates length well and one message is cheaper than N turns. Pause only when (a) the user asks you to pause, (b) you need to resolve a PRD mismatch before the next step makes sense, or (c) the plan has more than ~6 steps and a mid-review check-in improves comprehension. **Step format:** ``` ### Step [N]: [Name] **Why:** [business reason] **What:** [technical essence] **Concepts:** [term]: [analogy] **Impact:** [code] → [user-facing change] **Code:** [if relevant] **Warnings (include uncertain ones with confidence tag):** - [PRD issue] - **Question:** [clarification] --- ``` ### Phase 3: Summary ``` ## Summary **Covered:** [recap] **Value:** [why it matters to user] **Concepts:** [list] **Self-check:** 1. [Business question] 2. [Technical question] ``` ## Rules | Principle | Action | |-----------|--------| | Business-first | Start with "why for the user" | | Simplicity | Term = analogy | | Specificity | Real files/endpoints | | Progress | Every 3-4 steps: "X of N" | | Criticality | Surface every potential PRD mismatch, including uncertain ones; mark each with confidence (high/medium/low). Present them all in the Warning block — let the user decide what is in scope. | | Constructiveness | Facts + question, no dismissiveness | ## Example **Input:** Progress tracking plan **Overview:** > **Business goal:** Users see progress → motivation > **Scope:** backend + DB | `src/modules/progress/` | medium > **Plan:** 4 steps (model, API, logic, integration) > > **Warning:** > - Plan doesn't mention visualization — PRD requires charts. Out of scope? > - PRD: PDF export — not in plan. Include? **Step 1:** > **Why:** Store word learning history > **What:** `WordProgress` table links user+word, stores metrics > **Concepts:** Database schema = DB blueprint as code > **Impact:** "Progress" screen → word-level stats > > **Warning:** > - PRD: track repetition intervals (spaced repetition). Schema: only `lastSeen`, no history. > - **Question:** Plan — current state only or full history? ## Related Skills | Need | Use | |------|-----| | Review code before merge | `/sr` | | Create implementation plan | `/ct` | | Analyze code architecture | `/code-analysis` | | Create/update PRD or JTBD | `/product` | ## Completion The review is complete when every plan step has been walked through, each material mismatch or uncertainty is recorded with a confidence tag and a question, and the summary self-check is present. This is a read-only review; a warning or a user checkpoint does not authorize plan or code edits.
Versions
| Repository | Score | Licence |
|---|---|---|
| This page · alexandrbasis/claudops | 100 | MIT |
| alexandrbasis/claudops | 100 | MIT |
Identical content appears in 1 other GitHub folders. We show one copy with the highest score.
Database snapshot: 13.11.2026 · package version 8b049c06a544 (SHA-256 digest of the entire package)
Downloads in the last 30 days: 2 · ranking
Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.
Similar skills
- 100validate-plan
This skill should be used when the user asks to 'validate a plan', 'check plan against spec', or 'verify plan alignment'. Validates a project plan against its parent spec for alignment, missing requirements, and consistency. - 100workflow-prd-to-plan
Transforms a PRD into a detailed implementation plan broken into user stories with per-layer tasks, acceptance criteria, and user validation steps. Use when the user wants to plan the implementation of a feature, break down a PRD into tasks, or mentions "implementation plan". - 90plan-new
Drafts implementation plan from ready PRD and research artifacts. Use when PRD and research gates pass and plan stage should start. Do not use when the request is feature kickoff in `idea-new` or readiness approval in `review-spec`. - 100nixtla-prd-to-code
Transform PRD documents into actionable implementation tasks with TodoWrite integration. Use when planning development work, converting requirements to tasks, or creating implementation roadmaps. Trigger with 'PRD to tasks', 'plan implementation from PRD', or 'create task list'. - 100review-prd
Review an existing PRD for completeness, quality, and anti-patterns when the user asks to review, critique, or check a PRD - 90plan-review
Use when reviewing an implementation plan before coding or launching workers to check approach, scope, and repo-convention fit.