req-prioritize

/req-prioritize

对一个已受理的需求,对照当前在做的工作(WIP)评估成本、影响、风险,给出排期建议和理由;提出人提建议,负责人拍板。Use after req-intake, at backlog grooming or sprint planning, or when someone asks 这个需求优先级多高 / 能不能插队.

Repository
mcode-stack ↗
Licence
MIT
Last repository change
11.11.2026

Assessment and security

100/ 100Class: good
Format25 / 25
Frontmatter with name and description, valid name, description up to 1,024 characters, name matching the folder.
Discoverability25 / 25
Description explains when to use the skill, has a reasonable length and uses third person.
Content35 / 35
At least 150 words and at most 500 lines, headings, step lists, examples or code.
Hygiene15 / 15
No placeholders such as TODO, no Windows paths, with a licence.
Riskno signals detected in the scan
Files in this package
1
Scripts
0
HTML comments
0
URLs in SKILL.md
0
Deprecation

No signals detected. Repository changed on 11.11.2026, without references to retired models or APIs.

Licence

MIT, open: use and modify while retaining author attribution.

What it does and when to use it

对一个已受理的需求,对照当前在做的工作(WIP)评估成本、影响、风险,给出排期建议和理由;提出人提建议,负责人拍板。Use after req-intake, at backlog grooming or sprint planning, or when someone asks 这个需求优先级多高 / 能不能插队.

Original author description

对一个已受理的需求,对照当前在做的工作(WIP)评估成本、影响、风险,给出排期建议和理由;提出人提建议,负责人拍板。Use after req-intake, at backlog grooming or sprint planning, or when someone asks 这个需求优先级多高 / 能不能插队.

How it works

  1. 1. 拉当前 WIP
  2. 2. 三项各给一个档位和证据
  3. 3. 和 WIP 比
  4. 4. 写建议
  5. 5. 负责人决定之后
  6. 输出
  7. 用到的命令
Original SKILL.md headings · 81 lines, 248 words
SKILL.md preview
---
name: req-prioritize
description: "对一个已受理的需求,对照当前在做的工作(WIP)评估成本、影响、风险,给出排期建议和理由;提出人提建议,负责人拍板。Use after req-intake, at backlog grooming or sprint planning, or when someone asks 这个需求优先级多高 / 能不能插队."
---

# 需求排优先级(req-prioritize)

优先级不是提出人喊出来的,也不是 Agent 算出来的。我们的分工是:提出人和他的 Agent 把账算清楚、给出建议,负责人(空间里配置的 PM/Owner 角色)做决定。Agent 不改别人需求的优先级。

## 1. 拉当前 WIP

```bash
meegle workitem query --project-key <PK> \
  --mql "SELECT name, priority, status, current_status_operator FROM <类型 key> WHERE <状态不在已完成/已关闭>" \
  --format json
```

MQL 写法先读 meegle skill 的 `references/mql-basics.md` 与 `mql-operators.md`;状态条件的具体写法见 `mql-time-status.md`。单次最多 50 条,多了按 `--session-id` 翻页。

## 2. 三项各给一个档位和证据

| 维度 | 档位 | 必须附的证据 |
| --- | --- | --- |
| 影响 | 高 / 中 / 低 | 受影响人数或场景频率,来自 intake 的实证 |
| 成本 | S(≤2 人日)/ M(≤1 周)/ L(>1 周) | 粗拆的步骤,谁估的 |
| 风险 | 高 / 中 / 低 | 碰到的模块、数据、权限、对外接口 |

没证据的格子写「未知」,不要往中间档凑。

## 3. 和 WIP 比

- 这个需求要占谁的时间?那个人手上已有几项在做?
- 插进来会推迟哪一项?把被推迟项的名字写出来。
- 不插队的话最早什么时候能开始?

## 4. 写建议

```text
建议:本迭代 / 下迭代 / 进 backlog / 不做
理由:(一到三条,对应上面的证据)
代价:插进来会推迟 <工作项名>
需要负责人决定的点:...
```

把建议写进需求文档「4. 优先级评估」:

```bash
lark-cli docs +fetch --as user --doc <URL> --scope outline --detail with-ids
lark-cli docs +update --as user --doc <URL> --command block_insert_after \
  --block-id <「4. 优先级评估」标题的 block_id> --doc-format markdown --content @prio.md
```

在工作项上留评论并 @ 负责人(这是对外可见的动作,先给提出人看过再发):

```bash
meegle comment add --project-key <PK> --work-item-id <ID> --content "<建议摘要 + 文档链接>"
```

## 5. 负责人决定之后

由负责人或提出人本人改优先级字段;Agent 只在提出人明确说「按负责人的决定改」时执行:

```bash
meegle workitem update --project-key <PK> --work-item-id <ID> \
  --fields '[{"field_key":"priority","field_value":"<option_id>"}]'
```

`priority` 是 meegle skill 示例里出现过的 key;option_id 必须先用 `meegle workitem meta-fields` 查。

## 输出

建议卡片 + 负责人的决定(谁、何时、在哪说的)。没拿到决定前状态保持「待排期」。

## 用到的命令

先确认身份和空间(每个会话一次):

```bash
meegle project search --project-key "<空间名或 key>" --format json
meegle workitem meta-types --project-key <PK> --format json
lark-cli docs +fetch --as user --doc <需求文档 URL> --scope outline
```

字段 key、状态 key、transition_id 一律现查,不要凭记忆填,见 `templates/meegle-field-mapping.md`。

Versions

The database has no other skills named req-prioritize.

Database snapshot: 13.11.2026 · package version b7ff1ee44b7e (SHA-256 digest of the entire package)

Downloads in the last 30 days: 2 · ranking

Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.

Similar skills

  • 100req-board-card
    在需求看板(req-board,http://127.0.0.1:8899)上为当前或指定项目创建需求卡。当用户说「帮我建卡」「记到需求看板」「建一张 xx 项目的需求卡」「把 xx 记录为暂缓/待办需求」,或要求把本项目讨论的方案、需求、待办登记到 req-board 时使用。
  • 95req-design
    为已排期的需求做方案:列至少两个选项、写决策记录、评估波及面(blast radius)、定验收检查点,全部落进需求文档。Use when a requirement is scheduled and before implementation, or when someone asks 方案怎么定 / 这个改动会影响哪些地方.
  • 100agile-v-product-owner
    REQ-aware Product Owner for backlog and sprint management with full traceability. Use for sprint planning, backlog prioritization, or converting REQs to INVEST stories.
  • 85prioritize-features
    Prioritize a backlog of feature ideas based on impact, effort, risk, and strategic alignment with top 5 recommendations. Use when prioritizing a feature backlog, making scope decisions, or ranking product ideas.
  • 100make-req
    Decompose a task, plan, roadmap, or feature description into a structured set of requirements grouped for independent planning. Use when user says "make req", "make requirements", "decompose requirements", "extract requirements", or wants to break down a task into what needs to be true.
  • 100dx-req-dod
    Check Definition of Done and auto-fix gaps — PR, tasks, docs — then post a summary to ADO. Use for 'check DoD'. Not for fetching requirements (dx-req), child Tasks (dx-req-tasks) or pre-PR checks (dx-step-verify).

Feedback and reports

Your message goes to Bartosz Sokoliński. An email address is needed only for a reply. See the privacy policy.