对一个已受理的需求,对照当前在做的工作(WIP)评估成本、影响、风险,给出排期建议和理由;提出人提建议,负责人拍板。Use after req-intake, at backlog grooming or sprint planning, or when someone asks 这个需求优先级多高 / 能不能插队.
- Author
- MiniMax-AI ↗
- Repository
- mcode-stack ↗
- Licence
- MIT
- Last repository change
- 11.11.2026
Assessment and security
- Files in this package
- 1
- Scripts
- 0
- HTML comments
- 0
- URLs in SKILL.md
- 0
No signals detected. Repository changed on 11.11.2026, without references to retired models or APIs.
MIT, open: use and modify while retaining author attribution.
What it does and when to use it
对一个已受理的需求,对照当前在做的工作(WIP)评估成本、影响、风险,给出排期建议和理由;提出人提建议,负责人拍板。Use after req-intake, at backlog grooming or sprint planning, or when someone asks 这个需求优先级多高 / 能不能插队.
Original author description
对一个已受理的需求,对照当前在做的工作(WIP)评估成本、影响、风险,给出排期建议和理由;提出人提建议,负责人拍板。Use after req-intake, at backlog grooming or sprint planning, or when someone asks 这个需求优先级多高 / 能不能插队.
How it works
- 1. 拉当前 WIP
- 2. 三项各给一个档位和证据
- 3. 和 WIP 比
- 4. 写建议
- 5. 负责人决定之后
- 输出
- 用到的命令
SKILL.md preview
---
name: req-prioritize
description: "对一个已受理的需求,对照当前在做的工作(WIP)评估成本、影响、风险,给出排期建议和理由;提出人提建议,负责人拍板。Use after req-intake, at backlog grooming or sprint planning, or when someone asks 这个需求优先级多高 / 能不能插队."
---
# 需求排优先级(req-prioritize)
优先级不是提出人喊出来的,也不是 Agent 算出来的。我们的分工是:提出人和他的 Agent 把账算清楚、给出建议,负责人(空间里配置的 PM/Owner 角色)做决定。Agent 不改别人需求的优先级。
## 1. 拉当前 WIP
```bash
meegle workitem query --project-key <PK> \
--mql "SELECT name, priority, status, current_status_operator FROM <类型 key> WHERE <状态不在已完成/已关闭>" \
--format json
```
MQL 写法先读 meegle skill 的 `references/mql-basics.md` 与 `mql-operators.md`;状态条件的具体写法见 `mql-time-status.md`。单次最多 50 条,多了按 `--session-id` 翻页。
## 2. 三项各给一个档位和证据
| 维度 | 档位 | 必须附的证据 |
| --- | --- | --- |
| 影响 | 高 / 中 / 低 | 受影响人数或场景频率,来自 intake 的实证 |
| 成本 | S(≤2 人日)/ M(≤1 周)/ L(>1 周) | 粗拆的步骤,谁估的 |
| 风险 | 高 / 中 / 低 | 碰到的模块、数据、权限、对外接口 |
没证据的格子写「未知」,不要往中间档凑。
## 3. 和 WIP 比
- 这个需求要占谁的时间?那个人手上已有几项在做?
- 插进来会推迟哪一项?把被推迟项的名字写出来。
- 不插队的话最早什么时候能开始?
## 4. 写建议
```text
建议:本迭代 / 下迭代 / 进 backlog / 不做
理由:(一到三条,对应上面的证据)
代价:插进来会推迟 <工作项名>
需要负责人决定的点:...
```
把建议写进需求文档「4. 优先级评估」:
```bash
lark-cli docs +fetch --as user --doc <URL> --scope outline --detail with-ids
lark-cli docs +update --as user --doc <URL> --command block_insert_after \
--block-id <「4. 优先级评估」标题的 block_id> --doc-format markdown --content @prio.md
```
在工作项上留评论并 @ 负责人(这是对外可见的动作,先给提出人看过再发):
```bash
meegle comment add --project-key <PK> --work-item-id <ID> --content "<建议摘要 + 文档链接>"
```
## 5. 负责人决定之后
由负责人或提出人本人改优先级字段;Agent 只在提出人明确说「按负责人的决定改」时执行:
```bash
meegle workitem update --project-key <PK> --work-item-id <ID> \
--fields '[{"field_key":"priority","field_value":"<option_id>"}]'
```
`priority` 是 meegle skill 示例里出现过的 key;option_id 必须先用 `meegle workitem meta-fields` 查。
## 输出
建议卡片 + 负责人的决定(谁、何时、在哪说的)。没拿到决定前状态保持「待排期」。
## 用到的命令
先确认身份和空间(每个会话一次):
```bash
meegle project search --project-key "<空间名或 key>" --format json
meegle workitem meta-types --project-key <PK> --format json
lark-cli docs +fetch --as user --doc <需求文档 URL> --scope outline
```
字段 key、状态 key、transition_id 一律现查,不要凭记忆填,见 `templates/meegle-field-mapping.md`。
Versions
The database has no other skills named req-prioritize.
Database snapshot: 13.11.2026 · package version b7ff1ee44b7e (SHA-256 digest of the entire package)
Downloads in the last 30 days: 2 · ranking
Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.
Similar skills
- 100req-board-card
在需求看板(req-board,http://127.0.0.1:8899)上为当前或指定项目创建需求卡。当用户说「帮我建卡」「记到需求看板」「建一张 xx 项目的需求卡」「把 xx 记录为暂缓/待办需求」,或要求把本项目讨论的方案、需求、待办登记到 req-board 时使用。 - 95req-design
为已排期的需求做方案:列至少两个选项、写决策记录、评估波及面(blast radius)、定验收检查点,全部落进需求文档。Use when a requirement is scheduled and before implementation, or when someone asks 方案怎么定 / 这个改动会影响哪些地方. - 100agile-v-product-owner
REQ-aware Product Owner for backlog and sprint management with full traceability. Use for sprint planning, backlog prioritization, or converting REQs to INVEST stories. - 85prioritize-features
Prioritize a backlog of feature ideas based on impact, effort, risk, and strategic alignment with top 5 recommendations. Use when prioritizing a feature backlog, making scope decisions, or ranking product ideas. - 100make-req
Decompose a task, plan, roadmap, or feature description into a structured set of requirements grouped for independent planning. Use when user says "make req", "make requirements", "decompose requirements", "extract requirements", or wants to break down a task into what needs to be true. - 100dx-req-dod
Check Definition of Done and auto-fix gaps — PR, tasks, docs — then post a summary to ADO. Use for 'check DoD'. Not for fetching requirements (dx-req), child Tasks (dx-req-tasks) or pre-PR checks (dx-step-verify).