release-planning
/release-planning
Use when preparing a release or hotfix, changing deployment scope, defining release gates, or recording production authorization and chat-approved exceptions.
- Author
- arozumenko ↗
- Repository
- sdlc-skills ↗
- Licence
- MIT
- Last repository change
- 13.11.2026
Assessment and security
- Files in this package
- 3
- Scripts
- 0
- HTML comments
- 0
- URLs in SKILL.md
- 0
No signals detected. Repository changed on 13.11.2026, without references to retired models or APIs.
MIT, open: use and modify while retaining author attribution.
What it does and when to use it
Use when preparing a release or hotfix, changing deployment scope, defining release gates, or recording production authorization and chat-approved exceptions.
Original author description
Use when preparing a release or hotfix, changing deployment scope, defining release gates, or recording production authorization and chat-approved exceptions.
How it works
- Plan
- Authorization and chat overrides
- Record checkpoints
- Completion
SKILL.md preview
--- name: release-planning description: Use when preparing a release or hotfix, changing deployment scope, defining release gates, or recording production authorization and chat-approved exceptions. --- # Release planning Produce an executable plan and durable record for the actual artifact and target. This skill owns the shared release authority and evidence contract used by pre-production-checks, progressive-delivery, release-recovery and infrastructure-monitoring. ## Plan 1. Read existing release policy, workflow, deployment configuration and open incidents. Identify service, source commit, immutable artifact digest/version, configuration revision and exact target account, region, cluster/namespace or non-Kubernetes equivalent. Inspect installed tool versions. Load [platform guidance](references/platforms.md) only for the detected stack. 2. Use the project's release-record location or `docs/releases/<release-id>/`. Start from [the record template](templates/release-record.md). Reference restricted logs securely; keep secrets and production personal data out of Git. 3. Map dependency order, migration compatibility, capacity and blast radius with developers and Tech Lead. Select rolling, canary, blue/green or another existing strategy. State why it fits the workload, traffic and available routing. 4. Define stages, observation windows, minimum sample counts, fresh metric queries, thresholds, abort conditions, smoke tests and ongoing monitoring owner. Low traffic needs an explicit alternative, not invented statistical confidence. 5. Specify the known-good artifact, recovery mechanism, compatibility evidence, expected recovery time, data-loss implications and authorization. Coordinate application, configuration, infrastructure and data changes; a container rollback does not reverse a migration. Route unresolved architecture to Tech Lead. 6. Record environment execution authority, pipeline concurrency mechanism, and continuation owner. Hand the plan to pre-production-checks. Planning does not deploy; emergency changes retain explicit checks or recorded exceptions. ## Authorization and chat overrides Use existing policy and prior session approvals. Where authority is absent, finish preparation and ask for the specific production action. Read-only investigation and reversible local preparation need no extra release approval. A missing, stale, failed or inconclusive required gate holds promotion by default. Explain the concrete risk and options. **Explicit written human approval in chat can waive that gate**; no separate approval system or repeated confirmation is required. “Yes” accepts a clearly scoped exception just presented. A generic “ship it” without a disclosed gap is not automatically an informed waiver. Record the named approving human (never invent identity). If the host cannot supply identity, ask for the approver's name in chat and record it as self-declared. Record timestamp/message reference, exact approval, release/artifact/configuration/target, waived gates, disclosed risks, allowed actions and any time/stage limits. Carry this record across skills and resumed sessions. Proceed without asking again while approval covers the action; re-open only for materially different risks or changed scope. Keep gate status **waived**, never passed. A destructive action always needs a specific human confirmation for the current situation, even when a runbook preauthorizes it. Distinguish gate waiver from deployment/remediation authority; the same chat message can grant both. Approval cannot bypass credentials, enforced access controls or technical impossibility. When the record cannot be written to the repo, carry it in chat marked "persistence pending", keep it visibly unfinished, and write it to the repo at the first opportunity. A release cannot be closed while the record is still pending persistence. Do not erase approval or require the human to repeat it solely because the record store is unavailable. ## Record checkpoints Create append-only checkpoints on a dedicated release-record branch, committed and pushed, recording approvals, run/lock state and the next observation owner. Handoffs cite the branch and exact commit so a resumed session can continue before merge. Tech Lead reviews and PM merges through the normal gate. An unmerged checkpoint never counts as completion. ## Completion Return record path, artifact/target, strategy, gate and recovery readiness, authority/exception references, unresolved decisions and next owner. Keep merged, deployed, verified healthy and closed with accepted risk distinct. Closed with accepted risk requires a named human's explicit waiver of the remaining observation. Never report it as verified healthy. The record must list the evidence gaps and the follow-up owner.
Files in this package (3)
- SKILL.md 5 KB
- references/platforms.md 4 KB
- templates/release-record.md 4 KB
Versions
| Repository | Score | Licence |
|---|---|---|
| This page · arozumenko/sdlc-skills | 90 | MIT |
| qa-aman/claude-skills | 100 | MIT |
Database snapshot: 13.11.2026 · package version 48410901a2c5 (SHA-256 digest of the entire package)
Downloads in the last 30 days: 2 · ranking
Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.
Similar skills
- 100hotfix-release
Create a hotfix release branch, cherry-pick commits, bump the version, and open a draft PR. Use when: hotfix, patch release, cherry-pick to release, hotfix nuget, hotfix npm, release branch fix, backport fix. - 90release-checklist
Prepares a routine release after launch: scope from done stories, CI and test status, migration safety, feature flags, changelog, release notes, deploy and rollback steps, and a go/no-go. Use for every production release after the first launch. - 100qa-release
Manage QA release gates - go/no-go decisions, release sign-off reports, defect triage, and release readiness communication. Use this skill whenever a QA lead or manager needs to formally assess whether a build is ready to ship. Trigger on phrases like "release sign-off", "go or… - 100emergency-hotfix-deployment-procedure
Defines the out-of-cadence process for shipping a production hotfix outside the normal release train — which checks are genuinely safe to bypass versus never, the minimum required verification before an emergency deploy, required sign-off, and the rollback plan that must exist… - 90deciding-release-scope
Use when deciding release scope is required during planning work, especially when the result must be traceable, independently reviewable, and safe to hand to another agent. - 90release
Use to prepare or publish a versioned release: scope, artifacts, compatibility, release notes and readiness. Use Deploy to roll an artifact out to an environment.