Skip to content
Skills Library
DevOps & cloud · Planning

release-engineering

/release-engineering

Prepares and controls software releases with risk classification, CI quality gates, artifact provenance, feature flags, staged rollout, measurable promotion and rollback thresholds, post-deploy verification, and cleanup. Use for deployment pipelines, launch readiness, canaries, production rollout, release automation, or rollback planning. Not for merely merging a completed development branch or proving one local change.

Repository
godmode ↗
Licence
MIT
Last repository change
26.08.2026

Assessment and security

90/ 100Class: good
Format25 / 25
Frontmatter with name and description, valid name, description up to 1,024 characters, name matching the folder.
Discoverability25 / 25
Description explains when to use the skill, has a reasonable length and uses third person.
Content25 / 35
At least 150 words and at most 500 lines, headings, step lists, examples or code.
Hygiene15 / 15
No placeholders such as TODO, no Windows paths, with a licence.
Riskno signals detected in the scan
Files in this package
4
Scripts
0
HTML comments
0
URLs in SKILL.md
0
Deprecation

No signals detected. Repository changed on 26.08.2026, without references to retired models or APIs.

Licence

MIT, open: use and modify while retaining author attribution.

What it does and when to use it

Prepares and controls software releases with risk classification, CI quality gates, artifact provenance, feature flags, staged rollout, measurable promotion and rollback thresholds, post-deploy verification, and cleanup. Use for deployment pipelines, launch readiness, canaries, production rollout, release automation, or rollback planning. Not for merely merging a completed development branch or proving one local change.

Original author description

Prepares and controls software releases with risk classification, CI quality gates, artifact provenance, feature flags, staged rollout, measurable promotion and rollback thresholds, post-deploy verification, and cleanup. Use for deployment pipelines, launch readiness, canaries, production rollout, release automation, or rollback planning. Not for merely merging a completed development branch or proving one local change.

How it works

  1. Build the release contract
  2. Establish gates
  3. Roll out safely
  4. Close the release
  5. Completion condition
Original SKILL.md headings · 55 lines, 303 words
SKILL.md preview
---
name: release-engineering
description: >-
  Prepares and controls software releases with risk classification, CI quality
  gates, artifact provenance, feature flags, staged rollout, measurable
  promotion and rollback thresholds, post-deploy verification, and cleanup.
  Use for deployment pipelines, launch readiness, canaries, production rollout,
  release automation, or rollback planning. Not for merely merging a completed
  development branch or proving one local change.
---

# Release Engineering

Turn a release into a sequence of evidence-backed decisions rather than one
irreversible event.

## Build the release contract

Record the artifact/version, environments, owner, change scope, affected users,
data or contract changes, dependencies, risk class, maintenance window, and
success metrics. Use [release-record.md](references/release-record.md) for the
go/no-go and rollout record.

## Establish gates

Require checks proportional to risk: build and tests, contract and migration
proof, security findings, performance budgets, smoke paths, accessibility or
visual checks, artifact signing/provenance, monitoring, and a tested recovery
path. A green generic pipeline is not proof of the release's critical behavior.

## Roll out safely

1. Separate deployment from exposure with a flag or routing control when
   practical.
2. Start with internal, shadow, canary, or low-percentage traffic.
3. Compare errors, latency, saturation, business outcomes, and support signals
   against a pre-release baseline.
4. Promote only after the observation window and all gates pass.
5. Roll back or disable immediately when a predefined threshold is crossed.
6. Verify recovery, communicate status, and preserve the timeline.

For canaries and production observation windows, use
[post-deploy-verification.md](references/post-deploy-verification.md). Confirm
the deployed build marker, run critical browser journeys through
`browser-testing`, and record each promote, hold, or rollback decision against
fresh baseline evidence.

Use immutable artifacts across environments. Keep release credentials out of
logs and command lines. Require explicit authority for production mutation.

## Close the release

Verify critical paths after deployment, monitor delayed jobs and regional
effects, remove stale flags and compatibility paths on schedule, update release
notes, and create owned follow-ups for non-blocking debt. Never substitute a
successful deployment command for an observation window. Use
`incident-response` if live impact begins and `safe-migrations` for stateful
cutovers.

## Completion condition

The intended artifact reached the intended audience, promotion evidence and
remaining limits are recorded, rollback readiness was real, and temporary
release controls have owners and expiry dates.
Files in this package (4)
  • SKILL.md 3 KB
  • agents/openai.yaml 1 KB
  • references/post-deploy-verification.md 1 KB
  • references/release-record.md 1 KB

Versions

RepositoryScoreLicence
This page · thiientv/godmode90MIT
TheLobbi/claude100MIT
majiayu000/spellbook100MIT
mawero83/google-sre-skills100MIT
the-open-agent/oss-skills100Apache-2.0
magnus919/agent-skills90MIT

Database snapshot: 13.11.2026 · package version e3b12681768b (SHA-256 digest of the entire package)

Downloads in the last 30 days: 1 · ranking

Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.

Similar skills

  • 100deployment-release-engineering
    Use when designing or reviewing deployment pipelines, rollout strategies, release gates, rollback plans, migration-safe releases, and post-deploy verification for production systems. Covers build promotion, environment strategy, release evidence, and operational safety.
  • 100release-checklist
    Build a release checklist and go/no-go plan covering semantic versioning, changelog, green CI and security gates, signed artifacts, database migrations, feature flags, staged rollout and a tested rollback plan. Use when the user is preparing a release or deploy, cutting a tag,…
  • 90release-readiness
    Assess whether a build is ready to deploy or promote. Use when DevOps must verify release candidates, artifact provenance, test evidence, dependency/security gates, environment config, migration and rollback readiness, observability, and approval status before staging or production deployment.
  • 100shipping-and-launch
    Production deployment and launch management skill. Use when preparing to ship a feature to production: staged rollout planning, rollback plan design, production readiness checklists, launch go/no-go decisions, and post-launch monitoring setup. Triggers on: "deploy to…
  • 100deployment-procedures
    Safe rollout, pre-deploy checks, rollback and post-deploy verification. Use when planning a release, choosing a rollout strategy or preparing a rollback.
  • 100deployment-automation
    Plan and review release execution for web, backend, and fullstack systems: preview releases, staging-to-production promotion, rollout strategy, post-deploy verification, rollback response, and release-hardening checklists. Use when the system can already build and the main job…

Feedback and reports

Your message goes to Bartosz Sokoliński. An email address is needed only for a reply. See the privacy policy.