Sanity-checks an inside-view estimate (schedule, cost, adoption, revenue) against the outside view — the outcome distribution of a reference class of similar past cases (Kahneman & Tversky; Flyvbjerg's reference class forecasting) — and computes the base rate, the estimate's percentile in the class and the uplift to a P50/P80 forecast. Use when a plan, budget or timeline rests on an internal estimate: \"sanity-check the 9-month estimate against similar projects\", \"what's the base rate before trusting the internal number?\", \"apply reference class forecasting to this budget\". Not for revisi
- Author
- radarist ↗
- Repository
- structured-analytic-skills ↗
- Licence
- MIT
- Last repository change
- 18.08.2026
Assessment and security
- Files in this package
- 5
- Scripts
- 1
- HTML comments
- 0
- URLs in SKILL.md
- 7
No signals detected. Repository changed on 18.08.2026, without references to retired models or APIs.
MIT, open: use and modify while retaining author attribution.
- 1 scripts in this package. Review them before installing, as Claude may execute them.
Scripts: scripts/refclass.py
What it does and when to use it
Sanity-checks an inside-view estimate (schedule, cost, adoption, revenue) against the outside view — the outcome distribution of a reference class of similar past cases (Kahneman & Tversky; Flyvbjerg's reference class forecasting) — and computes the base rate, the estimate's percentile in the class and the uplift to a P50/P80 forecast. Use when a plan, budget or timeline rests on an internal estimate: \"sanity-check the 9-month estimate against similar projects\", \"what's the base rate before trusting the internal number?\", \"apply reference class forecasting to this budget\". Not for revisi
Triggers from the description
Original author description
Sanity-checks an inside-view estimate (schedule, cost, adoption, revenue) against the outside view — the outcome distribution of a reference class of similar past cases (Kahneman & Tversky; Flyvbjerg's reference class forecasting) — and computes the base rate, the estimate's percentile in the class and the uplift to a P50/P80 forecast. Use when a plan, budget or timeline rests on an internal estimate: \"sanity-check the 9-month estimate against similar projects\", \"what's the base rate before trusting the internal number?\", \"apply reference class forecasting to this budget\". Not for revisi
How it works
- When to invoke
- Procedure — the outside view in seven steps
- Output template
- Worked example
- Verification
- Companion tool
- Pair with adjacent skills
- Anti-patterns
- Reference
SKILL.md preview
---
name: reference-class-forecasting
description: "Sanity-checks an inside-view estimate (schedule, cost, adoption, revenue) against the outside view — the outcome distribution of a reference class of similar past cases (Kahneman & Tversky; Flyvbjerg's reference class forecasting) — and computes the base rate, the estimate's percentile in the class and the uplift to a P50/P80 forecast. Use when a plan, budget or timeline rests on an internal estimate: \"sanity-check the 9-month estimate against similar projects\", \"what's the base rate before trusting the internal number?\", \"apply reference class forecasting to this budget\". Not for revising one belief with one datum (use `bayesian-update`) or TAM/SAM/SOM sizing (use `estimate-market-size`)."
license: MIT
metadata:
category: quantitative
method: Reference Class Forecasting (outside view)
origin: Daniel Kahneman & Amos Tversky, 1979; Bent Flyvbjerg, 2006
version: "2.0.0"
---
# Reference Class Forecasting
Plans are forecast from the **inside view** — their own tasks and scenarios — which is systematically optimistic because the specifics crowd out how projects like this one usually end (Kahneman & Tversky 1979; Kahneman & Lovallo 1993). Reference class forecasting is the **outside view** made procedural: place the case in a class of similar completed cases and let the class's outcome distribution, not the plan, set the forecast. Flyvbjerg (2006) fixed the three steps — identify a reference class; establish its outcome distribution; position the case in it — that UK project appraisal adopted in 2004. It prevents the planning fallacy — a 9-month estimate no comparable project ever met.
## When to invoke
Invoke when:
- A schedule, budget, cost, adoption or revenue estimate is about to be trusted as stated: "sanity-check the 9-month estimate against similar projects", "what is the base rate for this kind of migration?".
- A business case or roadmap needs a P50/P80 forecast with stated contingency, not a bottom-up point estimate.
Do NOT invoke when:
- One belief needs revising on one new datum — use `bayesian-update`.
- The question is market size (TAM/SAM/SOM) — use `estimate-market-size`.
- Numbers only need internal consistency (CAGR, unit economics) — use `quantitative-sanity-check`.
- Forecasts already exist and need scoring — use `brier-score-calibration`.
- No comparable completed cases exist (n < 3) — say so; de-risk with `premortem-analysis` and `cheapest-experiment` rather than invent a class.
## Procedure — the outside view in seven steps
### 1 — Define the forecast quantity and unit
Write the quantity as it will be measured at the end ("delivery of Feature X, months from kickoff"). Prefer a **ratio** to the plan (actual / estimated): ratios compare across project sizes. Record the inside view as stated — 1.0 is the plan; 1.2 if 20 % contingency is already inside it.
### 2 — Choose the reference class, and say why
Propose 2–3 candidate classes and pick one, stating the trade-off — the **reference-class problem** (Hájek 2007): narrower is more similar but smaller, broader is bigger but less comparable. Flyvbjerg's rule: "broad enough to be statistically meaningful but narrow enough to be truly comparable". Judge similarity on outcome drivers, not labels. Record the rejected classes.
### 3 — Assemble the class's outcome distribution
One outcome per completed case, with source and n; mark illustrative data as such. Report percentiles — P10, P50, P80, P90 — not the mean: overrun distributions are right-skewed and the mean flatters the plan. n < 8: percentiles are indicative only; n < 3: no distribution — refuse and return to step 2. `scripts/refclass.py describe` computes them with a skew note.
### 4 — Position the inside view in the class
Locate the inside estimate as a percentile of the class (`position`): the share of cases below it and at or below it. An estimate at the 0–10 % point assumes an outcome 90 % of comparable projects failed to reach — the planning-fallacy signature; read it before adjusting.
### 5 — Compute the uplift to the target percentile
Choose the confidence the decision needs: P50 for a portfolio owner who nets overruns against underruns; P80 (20 % overrun risk, the UK Department for Transport's standard) or higher for a stand-alone project (Flyvbjerg 2006). Uplift `multiplier = Q(P_target) / inside`; forecast `= base × multiplier`. Flyvbjerg's UK rail class needed +40 % (P50) / +57 % (P80); HM Treasury's guidance tabulates generic uplifts by project type when no better class exists.
### 6 — Adjust the inside view only with specific, evidenced reasons
The outside view is the anchor; move it only for reasons that make *this* case measurably different — a documented better-than-class track record, a fixed-scope contract (Tetlock & Gardner 2015: outside view first, then inside). State the adjustment as a multiplier with its evidence; "we are different" is not evidence. An adjustment landing below the class median has erased the base rate — the tool flags it and exits 1.
### 7 — Report
Fill the output template — every field, including rejected classes and the reason for any adjustment.
## Output template
```
## Reference class forecast — {quantity, unit}
**Inside view:** {estimate} (ratio to plan {r}) — source: {who / how}
**Reference class:** {definition} — n = {n}; sources: {datasets}; rejected: {class: reason}
**Class distribution:** P10 {x} · P50 {x} · P80 {x} · P90 {x} · mean {x} ({skew note})
**Position of the inside view:** {lo}–{hi} % of the class at or below it — {interpretation}
**Uplift to P{target}:** ×{m} ({+p %}) — {base} × {m} = {forecast} {unit}; P50 forecast {x}
**Residual inside-view adjustment:** ×{k} — reason: {specific evidence} | none
**Forecast:** {final} {unit} at P{target} — class confidence: {n, comparability, data quality}
```
Every field is mandatory; without the percentile line it is an inside view with bigger contingency, not an outside view.
## Worked example
*Feature X, an internal ML feature, is planned at 9 months — what should the roadmap commit to?* The reference class is ten illustrative completed internal ML/R&D features (≥ 3 engineers, novel model component): Alder 1.0, Birch 1.1, Cedar 1.2, Dogwood 1.3, Elm 1.5, Fir 1.6, Ginkgo 1.8, Hazel 2.0, Ironwood 2.4, Juniper 3.0 (actual / planned duration; `examples/feature-x-schedule.json`). The team's one evidenced reason to adjust: its last four comparable features finished at a median ratio of 1.3. `python3 scripts/refclass.py report --demo` prints (abridged):
```
n 10 min 1.00 P10 1.09 P25 1.225 P50 1.55 P75 1.95 P80 2.08 P90 2.46 max 3.00
mean 1.69 sd 0.6315 skew g1 +0.89 - right-skewed (mean > median): summarise with percentiles, not the mean
outcomes below it: 0/10 (0 %) at or below: 1/10 (10 %) percentile rank: 0-10 % (interpolated 0.0 %)
multiplier = Q(P80) / inside = 2.08 / 1.00 = x2.08 (+108 %)
base 9.00 months -> P50 forecast 13.95 months -> P80 forecast 18.72 months
final forecast: 18.72 months x 0.9 = 16.85 months at P80
```
The roadmap commits to 17 months at P80 (14 at P50), not 9: the plan sat below every completed case and the only adjustment is the team's documented record. Asking for ×0.7 instead would land at 13.1 months, below the class median — the tool returns the adjusting-away-the-base-rate verdict (exit 1).
## Verification
Before the forecast ships:
- [ ] The quantity has a unit; the inside estimate's ratio to the plan is stated; two or more candidate classes were named, the choice justified, rejected classes listed.
- [ ] Every class outcome has a source and n is stated; n < 8 carries the small-n warning, n < 3 was refused.
- [ ] Percentiles were recomputed with `scripts/refclass.py describe` — no mean of a skewed class.
- [ ] The inside view's percentile line is present.
- [ ] Every adjustment carries specific evidence; the final forecast is not below the class-median forecast (tool exit 0, not 2).
## Companion tool
`scripts/refclass.py` computes steps 3–6 from a JSON or CSV reference class: Hyndman & Fan (1996) type-7 quantiles with skew note and small-n warning, the inside view's percentile band, the uplift with its formula, and the residual adjustment (refused without `--reason`) with the median check. Stdlib only, deterministic.
```bash
python3 scripts/refclass.py describe --file class.json # n, P10–P90, mean, sd, skew
python3 scripts/refclass.py report --file class.json --inside 1.0 --base 9 --target-percentile 80 --adjust 0.9 --reason "..."
python3 scripts/refclass.py report --demo # worked example; also position, uplift, --json, --selftest
```
Exit codes: 0 forecast rests on the class; 1 invalid input (n < 3, adjustment without reason); 2 the adjustment erased the base rate. Usable by hand: sort the class and read percentiles.
## Pair with adjacent skills
- `bayesian-update` — take the class percentile as the prior, then update on case-specific evidence.
- `estimate-market-size` — market-size questions route there.
- `quantitative-sanity-check` — check the inside estimate's arithmetic first.
- `premortem-analysis` — turn the inside/outside gap into named failure modes.
- `brier-score-calibration` — score reference-class forecasts once outcomes resolve.
- `cheapest-experiment` — when the plan is a lower bound, buy information before committing.
- Methodology counterpart: [methodologies/scientific-methods/bayesian-evidence-updating.md](https://github.com/radarist/structured-analytic-skills/blob/main/methodologies/scientific-methods/bayesian-evidence-updating.md) — the outside-view prior construction this skill operationalises.
## Anti-patterns
- Do **not** cherry-pick the class after seeing which one flatters the plan; name candidates first.
- Do **not** run a class of one ("last year's project took 8 months"); n < 3 is refused.
- Do **not** adjust away the base rate: a "correction" landing below the class median is the planning fallacy in a spreadsheet.
- Do **not** summarise a skewed overrun class by its mean; report P50/P80/P90.
- Do **not** stack an uplift on contingency already inside the estimate; state the inside ratio (1.2, not 1.0).
## Reference
- D. Kahneman and A. Tversky, "Intuitive Prediction: Biases and Corrective Procedures," *TIMS Studies in Management Science* 12:313–327, 1979. https://doi.org/10.1017/CBO9780511809477.031
- D. Kahneman and D. Lovallo, "Timid Choices and Bold Forecasts: A Cognitive Perspective on Risk Taking," *Management Science* 39(1):17–31, 1993. https://doi.org/10.1287/mnsc.39.1.17
- D. Lovallo and D. Kahneman, "Delusions of Success: How Optimism Undermines Executives' Decisions," *Harvard Business Review* 81(7):56–63, July 2003. https://hbr.org/2003/07/delusions-of-success-how-optimism-undermines-executives-decisions
- B. Flyvbjerg, "From Nobel Prize to Project Management: Getting Risks Right," *Project Management Journal* 37(3):5–15, 2006. https://doi.org/10.1177/875697280603700302
- HM Treasury, *Supplementary Green Book Guidance: Optimism Bias*, London, 2003 (GOV.UK, 2013). https://www.gov.uk/government/publications/green-book-supplementary-guidance-optimism-bias
- P. E. Tetlock and D. Gardner, *Superforecasting: The Art and Science of Prediction*, Crown, 2015, ch. 5 and Appendix commandment 3. ISBN 978-0-8041-3669-3
- A. Hájek, "The Reference Class Problem is Your Problem Too," *Synthese* 156(3):563–585, 2007. https://doi.org/10.1007/s11229-006-9138-5
Files in this package (5)
- SKILL.md 11 KB
- agents/openai.yaml 1 KB
- evals/evals.json 6 KB
- examples/feature-x-schedule.json 1 KB
- scripts/refclass.py 31 KB
Versions
| Repository | Score | Licence |
|---|---|---|
| This page · radarist/structured-analytic-skills | 100 | MIT |
| The-Utopia-Studio/skills | 100 | Apache-2.0 |
Database snapshot: 13.11.2026 · package version 00c998f7ec54 (SHA-256 digest of the entire package)
Downloads in the last 30 days: 1 · ranking
Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.
Similar skills
- 85insight-reference-class
Forecast from outcomes of comparable past cases. Use for "reference-class forecast", "outside-view estimate" or "are our estimates optimistic?" Use insight-value-of-information for the worth of research; this skill estimates outcomes, not priorities. - 90estimation-sizing
Size a backlog with reference-class forecasting, probabilistic ranges, and relative estimation as ranges not commitments. Use when: estimate product backlog, reference class forecasting, probabilistic p50 p90 estimate, t-shirt sizing stories, story point estimation, run planning…