project-closure

/project-closure

End a project deliberately, with handover, documentation, and a decision about what happens to what was built. Use when a project reaches its goal or is being stopped.

Repository
AI-SKILLS ↗
Licence
MIT
Last repository change
05.09.2026

Assessment and security

90/ 100Class: good
Format25 / 25
Frontmatter with name and description, valid name, description up to 1,024 characters, name matching the folder.
Discoverability25 / 25
Description explains when to use the skill, has a reasonable length and uses third person.
Content25 / 35
At least 150 words and at most 500 lines, headings, step lists, examples or code.
Hygiene15 / 15
No placeholders such as TODO, no Windows paths, with a licence.
Riskno signals detected in the scan
Files in this package
1
Scripts
0
HTML comments
0
URLs in SKILL.md
0
Deprecation

No signals detected. Repository changed on 05.09.2026, without references to retired models or APIs.

Licence

MIT, open: use and modify while retaining author attribution.

What it does and when to use it

End a project deliberately, with handover, documentation, and a decision about what happens to what was built. Use when a project reaches its goal or is being stopped.

Original author description

End a project deliberately, with handover, documentation, and a decision about what happens to what was built. Use when a project reaches its goal or is being stopped.

How it works

  1. Method
  2. Boundaries
Original SKILL.md headings · 37 lines, 226 words
SKILL.md preview
---
name: project-closure
description: End a project deliberately, with handover, documentation, and a decision about what happens to what was built. Use when a project reaches its goal or is being stopped.
---

# Project closure

Projects often stop rather than close: the team disperses, ownership is
unclear, and the thing built becomes an orphan that surprises somebody
during an incident months later.

## Method

1. **Confirm the outcome against the original goal.** What was achieved
   compared to what was scoped, honestly, including what was dropped
   (see project-scoping).
2. **Assign ongoing ownership explicitly.** Who maintains, supports, and
   is paged for what was built, because unowned systems are the most
   expensive legacy a project leaves.
3. **Hand over the knowledge, not just the code.** Runbooks, known
   issues, and the decisions behind the design (see runbook-writing).
4. **Close or transfer the open work.** Remaining items are either
   transferred with an owner or closed with a reason, never left in a
   dormant board.
5. **Release the resources deliberately.** Environments, licences, and
   access no longer needed, since these accumulate cost silently (see
   agent-vendor-operations).
6. **Run the retrospective before people disperse.** Memory and
   availability both decay immediately after closure (see
   project-retrospective).
7. **Communicate closure to stakeholders.** People with an interest need
   to know it ended and what the outcome was.

## Boundaries

Closure ends the project, not the system, which continues to need
support and eventually retirement (see feature-sunsetting). Cancelled
projects need closure too, and skipping it because the outcome was
disappointing leaves the worst mess. Handover requires a receiving owner
who has agreed.

Versions

The database has no other skills named project-closure.

Database snapshot: 13.11.2026 · package version 4172c2ee91bf (SHA-256 digest of the entire package)

Downloads in the last 30 days: 0 · ranking

Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.

Similar skills

  • 90plan
    Turn what you want to build into a project goal issue through conversation. Use when starting a project or changing its goal.
  • 85project-closeout
    Close or transition a consulting engagement through acceptance, handover, knowledge transfer, benefits ownership, financial reconciliation, and lessons learned. Use for successful completion, early termination, suspension, or transition to business-as-usual.
  • 90decision-closure
    决策闭包方法论:面对"没做过的复杂任务",在执行前重建任务的决策闭包(必须被做出的全部决策),用决策覆盖表暴露"被意外决定/无人决定"的决策类,把延期机制(闭包债逐次碰撞偿还)换成纸面成本。当出现:复杂任务反复返工/重复延期、同一交付物验收多次不过、用户反复纠偏、"看起来有设计但仍然混乱"、需要复盘"为什么一直失败"、或要给反思/复盘本身立验收标准(回溯测试)——时使用本 skill。配套 workflow:closure-retro.star(三路闭包源重建覆盖表+盲集回溯验证)。⚠️ 活文档:每次覆盖表被新失败证伪,把漏掉的决策类追加进 §6。
  • 100create-goal
    Create a Mission, Project, or Goal (Mission → Project → Goal → Task hierarchy) in EvoNexus. Guides the user through picking a mission, choosing or creating a project, defining a measurable goal with metric_type and target_value. Writes to the SQLite goals tables via POST…
  • 100advance
    Moves an existing project to its next step or phase (discovery, definition, plan, build, delivery, closure). Use when the user approves something, answers questions or says "let's continue", "let's move on", "approved".
  • 90handover-method