Turn a fuzzy cross-team mandate into a chartered program — a measurable outcome, a named sponsor, explicit in/out-of-scope boundaries, the teams on the hook, and the starting RAID. Use at the very start, before any planning, whenever a multi-team effort lacks a clear outcome or owner.
- Author
- mcorbett51090 ↗
- Repository
- ravenclaude ↗
- Licence
- MIT
- Last repository change
- 27.10.2026
Assessment and security
- Files in this package
- 1
- Scripts
- 0
- HTML comments
- 0
- URLs in SKILL.md
- 0
No signals detected. Repository changed on 27.10.2026, without references to retired models or APIs.
MIT, open: use and modify while retaining author attribution.
What it does and when to use it
Turn a fuzzy cross-team mandate into a chartered program — a measurable outcome, a named sponsor, explicit in/out-of-scope boundaries, the teams on the hook, and the starting RAID. Use at the very start, before any planning, whenever a multi-team effort lacks a clear outcome or owner.
Original author description
Turn a fuzzy cross-team mandate into a chartered program — a measurable outcome, a named sponsor, explicit in/out-of-scope boundaries, the teams on the hook, and the starting RAID. Use at the very start, before any planning, whenever a multi-team effort lacks a clear outcome or owner.
How it works
- When to use
- Procedure
- Output
- Anti-patterns (the hook flags these in artifacts)
SKILL.md preview
---
name: program-charter
description: "Turn a fuzzy cross-team mandate into a chartered program — a measurable outcome, a named sponsor, explicit in/out-of-scope boundaries, the teams on the hook, and the starting RAID. Use at the very start, before any planning, whenever a multi-team effort lacks a clear outcome or owner."
---
# Skill: Program charter
Charter a program before planning it. A program without a measurable outcome and a
named sponsor is a request, not a program — and it cannot be declared done.
## When to use
- A multi-team effort has been handed down but the outcome is fuzzy.
- Several teams share a deadline but no one owns the joint result.
- A program is in flight but nobody can state, in one sentence, what "done" means.
First confirm this is actually a program (tree 1 in
[`../../knowledge/tpm-engagement-decision-trees.md`](../../knowledge/tpm-engagement-decision-trees.md)).
If the hard part isn't cross-team seams, route to `project-management`.
## Procedure
1. **Write the outcome as one measurable sentence.** Metric + target + date. If you
can't measure it, you can't close it. Push back on "improve X" until it's
"move metric M from A to B by date D."
2. **Name the single sponsor.** One accountable executive who funds tradeoffs and
breaks ties. Two sponsors is zero sponsors.
3. **Draw the scope boundary — out-of-scope first.** The out list is what protects
the date; make it explicit and get the sponsor to agree it.
4. **List the teams and each team's one deliverable** into the program.
5. **Seed the RAID** with the known risks, assumptions, issues, and the obvious
cross-team dependencies.
6. **Fill the [`program-charter`](../../templates/program-charter.md) template** and
get the sponsor's explicit sign-off before any planning starts.
## Output
A completed charter. The outcome sentence is the contract; everything downstream
(plan, RAID, status, go/no-go) is judged against it.
## Anti-patterns (the hook flags these in artifacts)
- A charter with no measurable outcome ("improve billing").
- A charter with no named sponsor, or two co-sponsors.
- A scope section with an in-list but no out-list.
Versions
The database has no other skills named program-charter.
Database snapshot: 13.11.2026 · package version bfb0f3d690a2 (SHA-256 digest of the entire package)
Downloads in the last 30 days: 0 · ranking
Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.
Similar skills
- 100programme-charter
Charters an AI adoption, delivery or transformation programme - mandate, the outcomes it serves, scope and exclusions, workstreams, governance and decision rights, tolerances, funding envelope, roles and closure criteria - so the sponsor signs one agreed basis for running it.… - 85project-charter
Turns a project brief, intake summary, or rough idea into a complete, sponsor-ready project charter. Use whenever someone says "write the charter", "start a new project", "formalise this project", "we need a charter", "draft the project document", or pastes a brief and needs it… - 90technical-program-management
Manage technical programs made of multiple related projects, products, teams, or vendors: establish the program mandate and benefits, align component work, manage cross-project dependencies and shared capacity, govern risks and decisions, coordinate transformation and adoption,… - 90technical-program-manager
Guides technical program management—multi-team initiatives with dependencies, milestones, RAID tracking, launch readiness, stakeholder status, and cross-functional coordination across engineering, product, and infrastructure (not application code or BRDs). Use when running a… - 100risk-management
Identifies, assesses, and tracks program risks with mitigation plans. Use when starting risk assessment or updating RAID logs. - 90program-management
Plans and drives cross-functional programs to delivery — scope, sequencing, dependencies, status, risk, and the escalations that keep work moving. Use this to run a multi-team initiative, recover a program that is slipping, build a delivery plan with dependencies, structure…