[Project Management] Use when a workflow step or the user asks for planned-work prioritization using RICE, MoSCoW or Value-Effort ranking.
- Author
- duc01226 ↗
- Repository
- EasyPlatform ↗
- Licence
- MIT
- Last repository change
- 20.10.2026
Assessment and security
- Files in this package
- 1
- Scripts
- 0
- HTML comments
- 4
- URLs in SKILL.md
- 0
No signals detected. Repository changed on 20.10.2026, without references to retired models or APIs.
MIT, open: use and modify while retaining author attribution.
- SKILL.md zawiera komentarze HTML (4). Nie widać ich w podglądzie Markdown, a model je czyta.
What it does and when to use it
[Project Management] Use when a workflow step or the user asks for planned-work prioritization using RICE, MoSCoW or Value-Effort ranking.
Original author description
[Project Management] Use when a workflow step or the user asks for planned-work prioritization using RICE, MoSCoW or Value-Effort ranking.
How it works
- Quick Summary
- Contents
- When to Use
- When NOT to Use
- Phase 0: Detect & Prepare
- Workflow
- Output Format
- Examples
- Optional Escalation: /llm-council on Ties
- Related Skills
SKILL.md preview
---
name: prioritize
version: 2.0.0
description: '[Project Management] Use when a workflow step or the user asks for planned-work prioritization using RICE, MoSCoW or Value-Effort ranking.'
---
<!-- PROMPT-ENHANCE:STEP-TASK-ANCHOR:START -->
> **[BLOCKING]** Execute skill steps in declared order. NEVER skip, reorder, or merge steps without explicit user approval. Inside a workflow run, `/start-workflow` → Workflow-step mode bounds this rule.
> **[BLOCKING]** Before each step or sub-skill call, update todo tracking: set `in_progress` when step starts, set `completed` when step ends.
> **[BLOCKING]** Every completed/skipped step MUST include brief evidence or explicit skip reason.
> **[BLOCKING]** If Task tools are unavailable, create and maintain an equivalent step-by-step plan tracker with the same status transitions.
<!-- PROMPT-ENHANCE:STEP-TASK-ANCHOR:END -->
## Quick Summary
**Goal:** Produce a defensible ranked ordering of 3+ planned work items using RICE, MoSCoW, or Value-Effort frameworks so the team works highest-value items first — every rank backed by a score and tech-agnostic rationale (value/effort/risk/impact).
**Summary:**
- **1. Track + detect/collect** — track each declared step (`in_progress` → `completed` + evidence); identify file/inline input and require ≥3 items; fewer → direct discussion, NEVER force a framework.
- **2. Select + score** — honor a specified framework; otherwise RICE for quantitative data, MoSCoW for stakeholder alignment, Value-Effort 2x2 for a quick call; default RICE when unsure; apply exact criteria, formula, and scales.
- **3. Rank + report** — rank by framework; emit a prioritized table with scores, tech-agnostic value/effort/risk/business-impact rationale, and Do-first/Plan-next/Defer recommendations.
- **4. Propagate + tie gate** — when task files exist, record the integer `priority` (1–999, lower first) + `priority_label` on EACH task, through `/task-track` when the task is tracked; near-tie/disagreement → `ask user question tool` for `/llm-council` vs accept, otherwise end without prompting.
**Workflow:**
1. **Collect Items** — read files or parse inline list; require ≥3 items
2. **Select Framework** — use RICE for quantitative data, MoSCoW for stakeholder alignment, or Value-Effort for a quick decision
3. **Score Each Item** — apply exact framework criteria and calculate scores
4. **Rank & Report** — emit prioritized table, rationale, and recommendations
5. **Propagate Priority** — if task files exist, MANDATORY record integer `priority` + `priority_label` on EACH task (tracked task: `priority` through `/task-track`)
6. **Tie Gate** — near-tie → `ask user question tool` (`/llm-council` vs accept); otherwise end without prompting
**Key Rules:**
- Require ≥3 items; fewer → discuss directly, NEVER force a framework.
- Honor a user-specified framework; otherwise default to RICE when unsure and ask when ambiguous.
> **AI-SDD Artifact Contract** — M1–M7 are blocking: M1/M2 keep rationale tech-agnostic and source identifiers in evidence carriers; M3 uses logical IDs with abstract anchors; M4–M5 require unambiguous, rebuildable behavior; M6 makes review violations explicit; M7 requires demoable business outcomes.
> MUST ATTENTION READ `.claude/skills/shared/sdd-artifact-contract.md` for full mandate and carrier rules.
- **Tech-agnostic rationale (M1):** justify every ranking by value, effort, risk, and business impact — NOT implementation technology. Rationale prose stays tech-agnostic per `spec-principles.md` §3 in the reference-docs root (default `docs/project-reference`; a `docsRoots.projectReference.path` entry in `docs/project-config.json` overrides the path): no framework/product/language/design-pattern names; effort may cite effort points and relative complexity, never a named stack.
- **Task propagation:** when task files exist, record the rank as integer `priority` (1–999, lower comes first) and the label as `priority_label` on EACH task; this is mandatory, not optional.
- **Work record owner:** `priority` is a tracker-owned field ([Records another skill authors](../task-track/references/integration-guide.md#records-another-skill-authors)). On a task with a `tracking` block, set it through `/task-track --mode=maintain` (`update` with `priority`) and edit only `priority_label` in the file; on an untracked task, write both keys directly. Ranking never changes `status`, readiness or assignee.
Apply critical/sequential thinking; every claim needs traced proof and confidence >80% to act.
## Contents
- [Quick Summary](#quick-summary)
- [Planned Work Prioritization](#planned-work-prioritization)
- [When to Use](#when-to-use)
- [When NOT to Use](#when-not-to-use)
- [Phase 0: Detect & Prepare](#phase-0-detect--prepare)
- [Workflow](#workflow)
- [Output Format](#output-format)
- [Examples](#examples)
- [Optional Escalation: /llm-council on Ties](#optional-escalation-llm-council-on-ties)
- [Related Skills](#related-skills)
- [Prompt-Enhance Closing Anchors](#prompt-enhance-closing-anchors)
- [Closing Reminders](#closing-reminders)
# Planned Work Prioritization
Use a data-driven framework → ranked list with scores + rationale.
## When to Use
- Delivery planning needs ordered planned work (≥3 items)
- Stakeholder priority ranking needs justification
- Feature roadmap needs objective ordering
- Competing features or initiatives need comparison
## When NOT to Use
- Fewer than 3 items → discuss directly
- Creating tasks or stories → use `work-item --mode=refine` or `work-item --mode=story`
- Full product strategy → use `initiative` then `work-item --mode=refine`
## Phase 0: Detect & Prepare
- Input: ≥3 planned work items (tasks, features, user stories), from `tasks/` under the team-artifacts root (default `team-artifacts`; a `docsRoots.teamArtifacts.path` entry in `docs/project-config.json` overrides the path), a user path, or inline descriptions.
- Record any specified framework and available quantitative, stakeholder-alignment, or quick-decision signal.
- Fewer than 3 items → ask for more or discuss directly; NEVER force a framework.
## Workflow
1. **Collect items**
- If a file path is provided, read items from files.
- If an inline list is provided, parse items from the user message.
- If fewer than 3 items, ask for more or suggest direct discussion.
2. **Select framework** using decision tree:
```
IF quantitative data available (reach, metrics) -> RICE
IF stakeholder alignment needed (must/should/could) -> MoSCoW
IF quick decision needed (2 axes only) -> Value-Effort 2x2
IF user specifies framework -> use that framework
IF unsure -> ask user, default RICE
```
3. **Score each item** using selected framework:
**RICE:**
```
Score = (Reach x Impact x Confidence) / Effort
Reach: Users affected per quarter (number)
Impact: 0.25 (minimal) | 0.5 (low) | 1 (medium) | 2 (high) | 3 (massive)
Confidence: 0.5 (low) | 0.8 (medium) | 1.0 (high)
Effort: Effort points (1, 2, 3, 5, 8, 13, 21)
```
**MoSCoW:**
```
Must Have: Critical for release, non-negotiable
Should Have: Important but not vital, workarounds exist
Could Have: Desirable, include if capacity allows
Won't Have: Out of scope for this cycle
```
**Value-Effort 2x2:**
```
High Value + Low Effort = Quick Wins (do first)
High Value + High Effort = Strategic (plan carefully)
Low Value + Low Effort = Fill-ins (if time permits)
Low Value + High Effort = Time Sinks (avoid)
```
4. **Rank items** by score (descending for RICE, category for MoSCoW, quadrant for V-E)
5. **Output** prioritized list with scores and rationale
6. **IF task files exist** -> **MANDATORY priority propagation**: record the resulting priority on EACH task — the rank as integer `priority` (1-999, lower comes first) and the label as `priority_label` (e.g. Must Have / Should Have / Could Have / Won't Have, or the framework's category). An untracked task takes both keys directly in its frontmatter; a task with a `tracking` block takes `priority` through `/task-track --mode=maintain` and only `priority_label` by file edit. When an existing task holds a label in `priority` and a number in `rank`, move the label to `priority_label` and the number to `priority`, and remove `rank`. Never leave this optional when task files exist: a task without its priority is incomplete, and downstream consumers (`work-item --mode=mockup` header badge, `feature-presentation` Scope & planned work slide) read priority FROM the task frontmatter. Update every ranked task, not just the standalone planned-work file.
## Output Format
```markdown
## Prioritized Planned Work
**Framework:** [RICE | MoSCoW | Value-Effort]
**Date:** [YYMMDD]
**Items scored:** [count]
### Rankings
| Rank | Item | Score | Rationale |
| ---- | --------- | ----- | --------------------------------------------------- |
| 1 | Feature A | 45.0 | High reach (5000), high impact (3), high confidence |
| 2 | Feature B | 12.0 | Medium reach (2000), medium impact, low effort |
| 3 | Feature C | 2.5 | Low reach, minimal impact, high effort |
### Recommendations
- **Do first:** [top items]
- **Plan next:** [medium items]
- **Defer:** [low items with reasoning]
```
## Examples
### Example 1: RICE scoring of 5 features
**Input:** "Prioritize: SSO login, dark mode, export to PDF, email notifications, bulk import"
**Output:**
| Rank | Feature | Reach | Impact | Conf | Effort | RICE |
| ---- | ------------------- | ----- | ------ | ---- | ------ | ---- |
| 1 | Email notifications | 5000 | 2 | 0.8 | 1 | 8000 |
| 2 | SSO login | 2000 | 3 | 0.8 | 3 | 1600 |
| 3 | Bulk import | 500 | 2 | 1.0 | 1 | 1000 |
| 4 | Export to PDF | 1000 | 1 | 0.8 | 2 | 400 |
| 5 | Dark mode | 3000 | 0.5 | 0.5 | 2 | 375 |
### Example 2: MoSCoW categorization
**Input:** "Categorize for Q1 release: payment gateway, admin dashboard redesign, API rate limiting, user avatars, audit logs"
**Output:**
- **Must Have:** Payment gateway (revenue-critical), API rate limiting (security)
- **Should Have:** Audit logs (compliance, workaround exists with manual exports)
- **Could Have:** Admin dashboard redesign (improves efficiency but current works)
- **Won't Have:** User avatars (nice-to-have, defer to Q2)
## Optional Escalation: /llm-council on Ties
**Gate evaluation:** After producing prioritized planned work (per `## Workflow` step output), inspect ranking output:
- Top-2 RICE scores within 15% of each other → gate fires
- Explicit MoSCoW tie (≥2 items in same Must/Should/Could band with material scope overlap) → gate fires
- Multi-stakeholder disagreement flagged in input → gate fires
- None of the above → gate does NOT fire; skill ends without prompting
**MANDATORY ATTENTION** — when the gate fires, you MUST use `ask user question tool` to present these options (identical preamble pattern to `architecture --mode=design`'s `## Next Steps` MANDATORY ATTENTION block):
- **"Escalate to /llm-council (Recommended)"** — Tie/disagreement detected. Run 11 sub-agent council (5 advisors + 5 reviewers + chairman). Council's Contrarian + Outsider lenses are well-suited to multi-task ranking ties. Cheaper alternatives: `/why-review`, `/plan --mode=validate` (use these instead if the tie is narrow but stakes are routine).
- **"Skip — accept current ranking"** — Acknowledge the tie; proceed with current ranking.
If gate does NOT fire, the prioritization decision stands; do NOT prompt.
## Related Skills
| Skill | When to use instead |
| ----------------- | ---------------------------------- |
| `initiative` | Capturing product intent upfront |
| `work-item --mode=story` | Breaking tasks into user stories |
| `work-item --mode=refine` | Refining initiatives into tasks |
---
<!-- PROMPT-ENHANCE:STEP-TASK-CLOSING:START -->
## Prompt-Enhance Closing Anchors
- **IMPORTANT MUST ATTENTION** follow declared step order for this skill; NEVER skip, reorder, or merge steps without explicit user approval; inside a workflow run, `/start-workflow` → Workflow-step mode bounds this
- **IMPORTANT MUST ATTENTION** for every step/sub-skill call: set `in_progress` before execution, set `completed` after execution
- **IMPORTANT MUST ATTENTION** every skipped step MUST include explicit reason; every completed step MUST include concise evidence
- **IMPORTANT MUST ATTENTION** if Task tools unavailable, maintain an equivalent step-by-step plan tracker with synchronized statuses
<!-- PROMPT-ENHANCE:STEP-TASK-CLOSING:END -->
## Closing Reminders
**IMPORTANT MUST ATTENTION Goal:** Produce a defensible ranked ordering of 3+ planned work items using RICE, MoSCoW, or Value-Effort frameworks so the team works highest-value items first — every rank backed by a score and tech-agnostic rationale (value/effort/risk/impact).
**Protocols in force (concise digest of the SYNC/shared blocks this skill carries):**
- **IMPORTANT MUST ATTENTION** require 3+ items BEFORE ranking; fewer than 3 → discuss directly, NEVER force a framework — why: ranking 1-2 items adds ceremony without signal
- **IMPORTANT MUST ATTENTION** select the framework by the decision tree — RICE for quantitative data, MoSCoW for stakeholder must/should/could alignment, Value-Effort 2x2 for a quick call; default RICE when unsure, ask the user when ambiguous — why: matching framework to the decision type is what makes the ranking defensible
- **IMPORTANT MUST ATTENTION** emit the prioritized table (scores + rationale) AND Do-first/Plan-next/Defer recommendations — NEVER stop at raw scores — why: the consumable output is the ranked table plus an action call, not a number column
- **IMPORTANT MUST ATTENTION** keep every rationale tech-agnostic per M1 — justify by value/effort/risk/business impact, NEVER by named stack/framework/product/language/design-pattern; effort may cite effort points + relative complexity only — why: spec-principles §3 BLOCKING, a tech-named rationale leaks implementation into a priority call
- **IMPORTANT MUST ATTENTION** score with the EXACT framework formula (RICE = Reach×Impact×Confidence ÷ Effort, fixed Impact/Confidence scales, Effort in effort points), then rank descending (RICE) / by band (MoSCoW) / by quadrant (V-E) — NEVER invent ad-hoc scores — why: a defensible rank needs a reproducible number
- **IMPORTANT MUST ATTENTION** on a near-tie (top-2 RICE within 15%, same-band MoSCoW overlap, flagged stakeholder disagreement) the gate FIRES — use `ask user question tool` to offer `/llm-council` escalation vs. accepting the ranking; if the gate does NOT fire, end WITHOUT prompting — why: tie-breaking is a judgment call the user owns, but a clear winner needs no interruption
- **IMPORTANT MUST ATTENTION** break work into small todo tasks using `TaskCreate` BEFORE starting; mark one `in_progress`, `completed` immediately after evidence
- **IMPORTANT MUST ATTENTION** search codebase/artifacts for 3+ similar patterns before creating new structure; evaluate pattern FIT (same constraints/scope) before copying a nearby example — why: closest example ≠ matching preconditions
- **IMPORTANT MUST ATTENTION** cite `file:line` evidence for every claim (confidence >80% to act, <60% DO NOT recommend); NEVER present a guess as fact
- **IMPORTANT MUST ATTENTION** when task files exist, propagating the ranking onto EACH task (integer `priority` 1-999 + `priority_label`; on a tracked task `priority` goes through `/task-track`) is MANDATORY, not optional — do it after ranking; grep downstream consumers before changing any priority field — why: downstream consumers (`work-item --mode=mockup` header, `feature-presentation` Scope & planned work slide) read priority from task frontmatter, and stale/absent priority refs cascade silently
- **IMPORTANT MUST ATTENTION** add a final review todo task to verify work quality
**Anti-Rationalization:**
| Evasion | Rebuttal |
| ------------------------------------ | ----------------------------------------------------------------------------- |
| "Only 2 items, just rank them" | Below the 3-item floor → discuss directly; a framework adds ceremony, not signal |
| "I'll cite the framework in the rationale" | Tech-agnostic per M1 — justify by value/effort/risk only, never by named stack |
| "Scores are close enough, I'll pick" | Near-tie fires the gate → `ask user question tool` for `/llm-council`, never silently break |
| "RICE feels right, skip the formula" | Apply the EXACT formula with fixed scales — a defensible rank needs a number |
| "The planned-work file has the ranking, tasks don't need it" | When task files exist, priority write-back to each task frontmatter is MANDATORY — mockup + presentation read priority from the task, not the planned work |
| "Already know the patterns" | Show `file:line` evidence — no proof = no search |
**[TASK-PLANNING]** Before acting, analyze task scope and systematically break it into small todo tasks and sub-tasks using TaskCreate.
> **[IMPORTANT]** Analyze how big the task is and break it into many small todo tasks systematically before starting — this is very important.
> **[IMPORTANT]** Use `TaskCreate` to break ALL work into small tasks BEFORE starting. This prevents context loss from long files. Keep task depth proportional to the work.
Versions
| Repository | Score | Licence |
|---|---|---|
| This page · duc01226/EasyPlatform | 100 | MIT |
| duc01226/EasyPlatform | 100 | MIT |
| menkesu/awesome-pm-skills | 100 | MIT |
| mshadmanrahman/pm-pilot | 100 | MIT |
| Sidsaladi9/persona-os | 100 | MIT |
| danielmiessler/LifeOS | 95 | MIT |
| suboss87/FDEOps | 90 | MIT |
Database snapshot: 13.11.2026 · package version b0abe4663384 (SHA-256 digest of the entire package)
Downloads in the last 30 days: 0 · ranking
Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.
Similar skills
- 100prioritization
Prioritize a feature backlog or list of ideas. Use when the user says "help me prioritize", "prioritize this backlog", "RICE score these", "MoSCoW", "opportunity solution tree", "what should we build first", "rank these features", or has a list of items and needs to decide order… - 100prioritization
Apply RICE, MoSCoW, ICE, and effort-impact frameworks to rank options and decide what to work on next. Use when the user asks to prioritize a backlog, rank features, decide what to build first, apply RICE or MoSCoW scoring, cut scope, or compare items by effort vs impact. NOT… - 100feature-prioritization
RICE, MoSCoW, Kano, and value-effort prioritization frameworks with scoring methodologies and decision documentation. Use when prioritizing features, evaluating competing initiatives, creating roadmaps, or making build vs defer decisions. - 100product-management
Product management expertise for product strategy, roadmap planning, feature prioritization (RICE, ICE, MoSCoW), customer research, A/B testing, product analytics, and product-market fit. Use when building product roadmaps, prioritizing features, or defining product strategy. - 100prioritization
Use for prioritization, or when there are more tasks than capacity: "what should we do first?", "rank this backlog", "cut scope for the MVP", "RICE score these". Picks a method (RICE, ICE, MoSCoW, impact-effort), scores items and sets a cut line. Skip for choosing between two designs. - 100prioritization-frameworks
Pick a prioritization method and rank a backlog: RICE, ICE, opportunity, MoSCoW and weighted scoring, plus four reference-only methods. Use when ranking features, problems or initiatives against each other.