plan-deep-dive
/plan-deep-dive
Phase-by-phase deep inspection of any multi-phase plan — stop at each phase and assess completeness, quality, and future-readiness before advancing. Trigger when the user runs /deep-dive or asks to "do a deep dive", "inspect each phase", "look at this more carefully", or "check if we're missing anything" on an existing plan. Use plan-create to create a new plan, plan-execute to run an approved plan, and plan-phases to add gates to a plan.
- Author
- allemaar ↗
- Repository
- open-skills ↗
- Licence
- Apache-2.0
- Last repository change
- 05.10.2026
Assessment and security
- Files in this package
- 2
- Scripts
- 0
- HTML comments
- 0
- URLs in SKILL.md
- 0
No signals detected. Repository changed on 05.10.2026, without references to retired models or APIs.
Apache-2.0, otwarta: można używać i zmieniać, z zachowaniem licencji i informacji o zmianach.
What it does and when to use it
Phase-by-phase deep inspection of any multi-phase plan — stop at each phase and assess completeness, quality, and future-readiness before advancing. Trigger when the user runs /deep-dive or asks to "do a deep dive", "inspect each phase", "look at this more carefully", or "check if we're missing anything" on an existing plan. Use plan-create to create a new plan, plan-execute to run an approved plan, and plan-phases to add gates to a plan.
Triggers from the description
Original author description
Phase-by-phase deep inspection of any multi-phase plan — stop at each phase and assess completeness, quality, and future-readiness before advancing. Trigger when the user runs /deep-dive or asks to "do a deep dive", "inspect each phase", "look at this more carefully", or "check if we're missing anything" on an existing plan. Use plan-create to create a new plan, plan-execute to run an approved plan, and plan-phases to add gates to a plan.
How it works
- When to escalate to plan-create
- Phase 1 — Load & Enumerate
- Phase 2 — Iterative Phase Drill-Down
- Phase 3 — Synthesis
- Rules
- Downstream
SKILL.md preview
---
name: plan-deep-dive
description: >
Phase-by-phase deep inspection of any multi-phase plan — stop at each phase and assess completeness, quality, and future-readiness before advancing. Trigger when the user runs /deep-dive or asks to "do a deep dive", "inspect each phase", "look at this more carefully", or "check if we're missing anything" on an existing plan. Use plan-create to create a new plan, plan-execute to run an approved plan, and plan-phases to add gates to a plan.
visibility: public
self-improvable: true
caller-options:
venue: [inline, delegated]
default-policy: ask
next-skills:
- skill: plan-execute
phrase: "/plan-execute"
why: "Proceed to execution if all phases pass"
- skill: plan-create
phrase: "/plan-create"
why: "Redesign if any phase verdict is RETHINK"
- skill: prime-sweep
phrase: "/prime-sweep"
why: "When a phase under deep-dive touches a large unread source surface — prime via delegation before inspecting"
triggers:
- "/deep-dive"
- "do a deep dive"
- "inspect each phase"
- "look at this more carefully"
- "check if we're missing anything"
---
# /deep-dive
Phase-by-phase deep inspection of any multi-phase plan. Stop at each phase, assess completeness, quality, and future-readiness before moving on.
> **Structured execution spec:** [`protocol.yon`](protocol.yon). Read it for the canonical rules and step sequence; this file is explanation. The two must stay in sync — if you edit one, update the other and refresh the `@STAMP` date.
> **Caller Options.** Before executing, run the Caller Options protocol (`caller-options/SKILL.md`): triage this invocation for material optionality across the venues declared in front-matter; if one path clearly dominates, proceed silently; otherwise surface the options. For very long plans, `delegated` keeps the main context clean while a sub-agent walks the phases and returns the verdict log.
> **Iterative Depth Protocol.** `/plan-create` produces the plan. `/plan-deep-dive` pressure-tests it phase by phase. Never batch or skip phases — the value is in the forced stops.
## When to escalate to plan-create
If phase-by-phase inspection surfaces gaps that would require redesigning the plan rather than tweaking it (missing phase, wrong sequencing, fundamental approach issue), stop the deep-dive and recommend `/plan-create` to redesign.
## Phase 1 — Load & Enumerate
Identify the active plan. Load `implementation_plan.md`, `PLAN.md`, or the current multi-phase artifact (e.g. a multi-phase plan presented inline in the conversation, or a plan document at any path the user has referenced). Extract the ordered list of phases.
**Verification step:** before entering Phase 2, present the loaded artifact's title and first substantive line to the user and ask: "Is this the correct and current plan?" Do not proceed until confirmed.
**Gate:** no phases found → cannot proceed.
## Phase 2 — Iterative Phase Drill-Down
For **each phase**, execute the full drill-down loop below. **Do NOT advance until the current phase passes all checks.**
**Running verdict log:** maintain a verdict table updated after each Step 5. This log is cited verbatim in Phase 3 — do not reconstruct from memory.
```
| Phase | Verdict | Key Findings | Amendments Applied |
|-------|---------|-------------|-------------------|
```
### Step 1 — Read the Phase
Read the current phase in full. Summarize scope, deliverables, and dependencies.
### Step 2 — Gap Assessment: Are we MISSING anything?
Check for: omitted edge cases, unstated assumptions, undeclared dependencies, missing error handling, missing validation, incomplete coverage.
**Minimum bar:** at least one named gap, or explicitly state "No gaps found — [reason]." A blank or "looks good" is not acceptable.
### Step 3 — Quality Assessment: Can we do it BETTER?
Check for: simpler approaches, performance gains, better abstractions, reduced scope creep, alignment with existing patterns and skills, DRY violations, naming drift.
**Minimum bar:** at least one named quality issue, or explicitly state "No quality issues found — [reason]."
### Step 4 — Future Assessment: Is this FUTURE-READY?
Check for: extensibility, breaking change risk, forward compatibility, scalability bottlenecks, tech debt introduced, migration paths needed later.
Consider **3-month** and **6-month** horizons explicitly. Example prompts: "What breaks if this phase's output format changes in 3 months?" / "What would need to be re-done if the team doubles in 6 months?"
**Minimum bar:** at least one named future risk, or explicitly state "No future risks found — [reason]."
### Step 5 — Phase Verdict — Present
Synthesize findings into a verdict. **Present the verdict and all findings to the user. Do not apply amendments yet.**
- **PASS** — no significant gaps, quality issues, or future risks found
- **AMEND** — gaps or improvements found; plan can proceed after targeted fixes
- **RETHINK** — stop and redesign before proceeding. Triggered when **any** of:
- The phase's primary deliverable is undefined or cannot be stated concretely
- The phase has an undeclared dependency on work not yet planned or completed
- The phase's approach directly contradicts a constraint or goal stated in the plan
Update the running verdict log with this phase's result.
### Step 6 — User Gate + Apply Amendments
Present the phase verdict and findings summary. The user must **acknowledge at least one specific finding by name** before the gate passes — a blanket "yes" or "proceed" is not sufficient. If the verdict is PASS with no findings, the user must confirm "no findings noted."
After user approval: apply any amendments to the plan artifact. Then loop back to Phase 2, Step 1 for the next phase.
## Phase 3 — Synthesis
After all phases pass, produce a consolidated deep-dive report. Cite per-phase verdicts directly from the running verdict log — do not reconstruct from memory.
- **Per-phase verdicts** — copied from the running verdict log
- **Total amendments made** — count and list
- **Residual risks** — findings not resolved by amendments
- **Future considerations** — 3-month/6-month items surfaced during Step 4 passes
- **Overall confidence score** — 1–10, where 10 = all phases PASS with zero findings, 1 = multiple RETHINK with unresolved issues. State the score and the primary reason it is not higher.
**Verdict examples:**
- *AMEND example:* "Phase 3 AMEND — missing rollback step identified; added explicit rollback instruction to the phase before advancing."
- *RETHINK example:* "Phase 2 RETHINK — primary deliverable (the API schema) was undefined; could not assess completeness. Returned to `/plan-create` to define it before re-running."
## Rules
- MUST stop at each phase — never batch or skip
- MUST propose concrete fixes when finding gaps — not vague observations
- MUST consider 3-month and 6-month horizons when assessing future
- MUST apply amendments to the plan artifact only after user approval in Step 6 — never before
- MUST NOT output "LGTM" without substantive analysis
- SHOULD check sibling skills for established patterns when referencing existing work
## Downstream
Suggest the natural next command — these mirror the `next-skills:` front-matter:
- `/plan-execute` — if all phases PASS
- `/plan-create` — if RETHINK on any phase
> **Human output.** This skill's handler-facing output obeys the human-output
> contract (`human-output/SKILL.md`).
> **Next skills.** On completion, run the Next Skills protocol (`next-skills/SKILL.md`): surface the `next-skills` recommendations from front-matter for the caller to pick. Offer only — never auto-invoke.
> **Self-improvement.** On completion, run the Self-Improvement Protocol (`self-improve/SKILL.md`): if this run surfaced a concrete, blocking-or-recurring weakness in this skill, propose a specific fix for the handler to approve. Conservative — silent otherwise. Never auto-apply.
Files in this package (2)
- SKILL.md 8 KB
- protocol.yon 9 KB
Versions
The database has no other skills named plan-deep-dive.
Database snapshot: 13.11.2026 · package version bff7d2820a6f (SHA-256 digest of the entire package)
Downloads in the last 30 days: 1 · ranking
Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.
Similar skills
- 100plan-phases
Restructure an existing plan into phases with /verify gates after each phase and critical outcomes, plus blocking pre-action gates for safety prerequisites. Trigger when the user runs /phase-plan or asks to "add phases to this plan", "gate this plan", "restructure the plan", or… - 100phase-review
Review implementation plans from the .tasks/ directory for flaws before committing — either a single phase (phase mode) or across all phases of a task for consistency (cross-phase analyze mode). Triggers on: 'use phase mode', 'review phase', 'review the plan', 'check phase',… - 100gate-check
Validates a software product, service, or feature against readiness gates before advancing to the next delivery phase. Use when planning a phase transition or when the user mentions gate check, phase review, or readiness validation. - 90deep-dive
2-stage pipeline: trace (causal investigation) then deep-interview (requirements). Activate when user says: deep dive, deep-dive, investigate deeply, trace and interview. - 100verify-phase
Check a build-plan phase against its scope and definition of done, run the relevant checks, and report what is done, missing or unverifiable. Use when the user asks whether a phase is finished, what is left in a phase, or wants to close a phase. - 100plan-intake
Turn any report (repo-deep-dive output, audit, skill-review, QA findings, design audit) into approved entries in a project's living-plan ledger. Use when the user says "intake this report", "add findings to the plan", "turn this audit into work items", "update the ledger from…