Skip to content
Skills Library
Programming · Automation

nw-execute

/nw-execute

Use when a DELIVER roadmap already exists and you need to dispatch exactly one identified step through its TDD cycle. Use nw-roadmap to create the plan, nw-deliver for the whole wave, and nw-continue to resume at the next inferred step.

Repository
nWave ↗
Licence
MIT
Last repository change
16.09.2026

Assessment and security

100/ 100Class: good
Format25 / 25
Frontmatter with name and description, valid name, description up to 1,024 characters, name matching the folder.
Discoverability25 / 25
Description explains when to use the skill, has a reasonable length and uses third person.
Content35 / 35
At least 150 words and at most 500 lines, headings, step lists, examples or code.
Hygiene15 / 15
No placeholders such as TODO, no Windows paths, with a licence.
Riskno signals detected in the scan
Files in this package
1
Scripts
0
HTML comments
5
URLs in SKILL.md
0
Deprecation

No signals detected. Repository changed on 16.09.2026, without references to retired models or APIs.

Licence

MIT, open: use and modify while retaining author attribution.

What to check before installing
  • SKILL.md zawiera komentarze HTML (5). Nie widać ich w podglądzie Markdown, a model je czyta.

What it does and when to use it

Use when a DELIVER roadmap already exists and you need to dispatch exactly one identified step through its TDD cycle. Use nw-roadmap to create the plan, nw-deliver for the whole wave, and nw-continue to resume at the next inferred step.

Arguments

/nw-execute [agent] [feature-id] [step-id] - Example: @nw-software-crafter "auth-upgrade" "01-01
Original author description

Use when a DELIVER roadmap already exists and you need to dispatch exactly one identified step through its TDD cycle. Use nw-roadmap to create the plan, nw-deliver for the whole wave, and nw-continue to resume at the next inferred step.

How it works

  1. Overview
  2. Syntax
  3. Context Files Required
  4. Rigor Profile Integration
  5. Dispatcher Workflow
  6. Agent Invocation
  7. Error Handling
  8. Resume vs Restart
  9. Examples
  10. TDDPHASES
Original SKILL.md headings · 225 lines, 1,603 words
SKILL.md preview
---
name: nw-execute
description: "Use when a DELIVER roadmap already exists and you need to dispatch exactly one identified step through its TDD cycle. Use nw-roadmap to create the plan, nw-deliver for the whole wave, and nw-continue to resume at the next inferred step."
user-invocable: true
argument-hint: '[agent] [feature-id] [step-id] - Example: @nw-software-crafter "auth-upgrade" "01-01"'
---

# NW-EXECUTE: Atomic Task Execution

**Wave**: EXECUTION_WAVE | **Agent**: Dispatched agent (specified by caller)

## Overview

Dispatch one unit of DELIVER work to an agent: a single roadmap step. `/nw-execute` extracts the step from `roadmap.json` and dispatches it for the 3-phase TDD canon; the agent appends phase events to `execution-log.json`.

## Syntax

```
/nw-execute @{agent} "{feature-id}" "{step-id}"
```

## Context Files Required

- `docs/feature/{feature-id}/deliver/roadmap.json` — Orchestrator reads once, extracts step context
- `docs/feature/{feature-id}/deliver/execution-log.json` — Agent appends only (never reads)

## Rigor Profile Integration

Before dispatching the agent, read rigor config from `.nwave/des-config.json` (key: `rigor`). If absent, use standard defaults.

- **`agent_model`**: Pass as `model` parameter to Agent tool. If `"inherit"`, omit `model` (inherits from session).
- **`tdd_phases`**: Modify the TDD_PHASES section in the DES template to match the configured phases. The 3-phase canon (ADR-025) is `[RED, GREEN, COMMIT]`; the lean variant is `[RED, GREEN]`. Legacy 5-phase contract (`[PREPARE, RED_ACCEPTANCE, RED_UNIT, GREEN, COMMIT]`) and its lean variant (`[RED_UNIT, GREEN]`) remain supported for audit-log replay of pre-2026-05-07 commits. Remove omitted phases' instructions from the template.
- **`refactor_pass`**: If `false`, skip COMMIT phase refactoring instructions.

## Dispatcher Workflow

1. **Parse Parameters** — Extract agent name, feature ID, and step ID from invocation. Gate: all three parameters present and non-empty.
2. **Load Rigor Profile** — Read `.nwave/des-config.json` key `rigor` (default: standard if absent). Gate: config loaded or default applied.
3. **Validate Context Files** — Confirm `roadmap.json` and `execution-log.json` exist under `docs/feature/{feature-id}/deliver/`. Gate: both files present; report path-not-found if missing.
4. **Extract Step Context** — Grep roadmap for `step_id: "{step-id}"` with ~50 lines context. Gate: step found; report available step IDs if missing.
5. **Invoke Agent** — Call Agent tool with DES template below, applying rigor model and phases from step 2. Gate: Agent tool called, not executed inline.

## Agent Invocation

@{agent}

Use this DES template verbatim. Fill `{placeholders}` from roadmap. Without DES markers, hooks cannot validate.

```
<!-- DES-VALIDATION : required -->
<!-- DES-PROJECT-ID : {feature-id} -->
<!-- DES-STEP-ID : {step-id} -->

# DES_METADATA
Step: {step-id}
Feature: {feature-id}
Command: /nw-execute

# AGENT_IDENTITY
Agent: {agent-name}

# SKILL_LOADING
Before starting TDD phases, read your skill files for methodology guidance.
Skills path: ~/.claude/skills/nw-{skill-name}/SKILL.md
Always load before RED: tdd-methodology.md, quality-framework.md (3-phase canon, ADR-025) — legacy 5-phase logs reference loading at PREPARE.
Load on-demand per phase as specified in your Skill Loading Strategy table.

# TASK_CONTEXT
{step context from roadmap - name|criteria|test_file|scenario_name|implementation_notes|deps|files_to_modify (per nWave/templates/roadmap-schema.json)}

# DESIGN_CONTEXT
{Summary of architectural decisions relevant to this step, extracted by the orchestrator from docs/product/architecture/brief.md and wave-decisions.md. Include: component structure, dependency boundaries, technology choices, and any design constraints that affect implementation. If no design artifacts exist, write "No design artifacts available — use project conventions."}

# TDD_PHASES
3-phase canon (ADR-025, 2026-05-07). Execute in order:

1. RED - Activate the pre-authored acceptance test (PRIMARY TBU DEFENSE); write PBT unit tests ONLY if the AT cannot reach GREEN without them.
   AT activation: If TASK_CONTEXT includes test_file, locate it and remove the @skip/@ignore/@pending/xit/.skip/[Ignore] marker from the target scenario (the AT scaffold was authored by DISTILL — DELIVER does NOT re-author ATs). Run it — must fail for business logic reason (not import/syntax error). Fail-for-right-reason gate: collected ≥ 1, failures ≥ 1, no collection errors, semantic AssertionError / expected-exception-not-thrown.
   PORT-TO-PORT PRINCIPLE: The acceptance test exercises the scenario through
   the driving port (application service, orchestrator, CLI handler, API controller),
   not a decomposed helper or internal class. A correctly-written port-to-port test
   makes TBU structurally impossible — if a new function were missing or unwired,
   THIS test stays RED. That is the entire point: GREEN is unreachable without wiring.
   Litmus test: "If I delete the call-site that wires the new code, does this test fail?"
   If no → the test is at the wrong level. Stop and flag to orchestrator (DISTILL re-author needed).
   Conditional unit-test authoring: write PBT unit tests (or integration tests for adapter/infrastructure code — adapters use real infrastructure, never mocked unit tests) ONLY when the AT requires them to reach GREEN. If the AT can pass via direct minimal implementation, skip unit-test authoring inside RED.

2. GREEN - Minimal code to pass AT + any unit tests authored in RED.
   After GREEN: run FULL test suite. If all pass, proceed to COMMIT immediately.
   Smell test: if any new function is only called from test code, your acceptance
   test is at the wrong abstraction level — stop and flag.
   Never move to new task or stop without committing green code.

3. COMMIT - Commit this step's owned files via `des-commit` (parallel-safe).
   Use `des-commit` instead of raw `git add` / `git commit`. It holds an
   exclusive lock and commits ONLY the paths you pass, so a parallel agent's
   staged work is never swept into your commit (issue #51 / ADR-027). Pass
   EVERY file you created or modified for this step (production + tests) as
   `--owned-paths`; anything omitted is not committed.
   ```
   des-commit \
     --owned-paths <all files this step created/modified> \
     --step-id {step-id} \
     --task-id {project_id} \
     --message "feat(feature-id): implement feature X"
   ```
   Pass the bare `project_id` value (for example `44`, not `#44` and not the
   step id). The `Step-Id: {step-id}` and `Task-Id: {project_id}` trailers
   required for DES verification are appended automatically in one git trailer
   block. Resulting commit for project 44:
   ```
   feat(feature-id): implement feature X

   Step-Id: 02-01
   Task-Id: 44
   ```

LEGACY 5-PHASE CONTRACT (ADR-024 era, pre-2026-05-07): PREPARE → RED_ACCEPTANCE → RED_UNIT → GREEN → COMMIT. Preserved for audit-log replay only — new work uses the 3-phase canon above. Audit-log entries referencing RED_ACCEPTANCE/RED_UNIT/PREPARE represent merged sub-steps now folded into RED.

# QUALITY_GATES
- All tests pass before COMMIT
- No skipped phases without blocked_by reason
- Coverage maintained or improved

# OUTCOME_RECORDING
Immediately after ACTUALLY EXECUTING each phase — and BEFORE any
permission-gated or interruption-prone command (e.g. `nix-build`, a network
fetch, a long verification run) — record it via the DES CLI. Do NOT batch
`des-log-phase` calls to end-of-run: a permission prompt or STOP between phases
drops the un-written entries, leaving an incomplete trace (e.g. 3/5) that fails
`des-verify-integrity` at finalize and forces a resume to re-log work already
done.

    des-log-phase \
      --project-dir docs/feature/{feature-id}/deliver \
      --step-id {step-id} \
      --phase {PHASE_NAME} \
      --status EXECUTED \
      --data PASS

For `--status EXECUTED`, `--data` MUST be exactly `PASS` or `FAIL` — no prose,
no prefix. The stop-hook StepCompletionValidator compares the value against
`{PASS, FAIL}` exactly; anything else (e.g. `--data "PASS: unit layer folded
into shape suite"`) is rejected as an INCOMPLETE_PHASE and the phase must be
re-logged. Put any explanation in your report to the orchestrator, not in
`--data`. Only `--status SKIPPED` may carry text — and only as a valid prefix
(see below).

For SKIPPED phases (genuinely not applicable):

    des-log-phase \
      --project-dir docs/feature/{feature-id}/deliver \
      --step-id {step-id} \
      --phase {PHASE_NAME} \
      --status SKIPPED \
      --data "NOT_APPLICABLE: reason"

CLI enforces real UTC timestamps and validates phase names.
Do NOT manually edit execution-log.json.
Use the DES CLI to record phase outcomes and create log files.
Python resolution: `$(command -v python3 || command -v python)` — works on macOS (python3 only), Linux, and Windows.

CRITICAL: Only the executing agent calls the CLI.
Orchestrator MUST NEVER write phase entries — only the agent that performed the work. A log entry without actual execution is a **violation that DES detects and that will cause integrity verification to fail**, blocking finalize.

# RECORDING_INTEGRITY
Valid Skip Prefixes: NOT_APPLICABLE, BLOCKED_BY_DEPENDENCY, APPROVED_SKIP, CHECKPOINT_PENDING
Anti-Fraud Rules:
- NEVER write EXECUTED for phases you did not actually perform
- NEVER invent timestamps — DES CLI generates real UTC timestamps
- DES audits all entries; integrity violations block finalize

# BOUNDARY_RULES
- Only modify files listed in step's files_to_modify
- Do not load roadmap.json
- Do not modify execution-log.json structure (append only)
- NEVER write execution-log entries for phases you did not execute

# TIMEOUT_INSTRUCTION
Target: 30 turns max. If approaching limit, COMMIT current progress.
If GREEN complete (all tests pass), MUST commit before returning — even at turn limit.
```

**Configuration:**
- subagent_type: extracted agent name
- Turn limits are defined in each agent's `maxTurns` frontmatter field (not as a tool parameter)

## Error Handling

1. **Invalid Agent** — Report available agents from the agent registry. Gate: error message returned, no invocation attempted.
2. **Missing Context Files** — Report exact path not found for roadmap or execution-log. Gate: clear path reported.
3. **Step Not in Roadmap** — Report available step IDs from roadmap. Gate: list of valid IDs returned.
4. **Dependency Failure** — Explain which blocking tasks are incomplete. Gate: blocking step IDs named explicitly.

## Resume vs Restart

When subagent times out:

| Last Completed Phase (3-phase canon) | Legacy phase (5-phase) | Action | Rationale |
|--------------------------------------|------------------------|--------|-----------|
| GREEN (or later) | GREEN | Resume | Only COMMIT remains (~5 turns) |
| RED with partial GREEN | RED_UNIT with partial GREEN | Resume | Preserves implementation progress |
| RED only (pre-GREEN) | PREPARE or RED_ACCEPTANCE | Restart | Little context worth replaying |

Resume costs ~50% more tokens/call due to context replay (measured: 3.7K vs 2.5K tokens/call). For <5 remaining turns, resume is efficient. For 15+ turns, restart is cheaper.

## Examples

```bash
/nw-execute @nw-software-crafter "des-us007-boundary-rules" "02-01"
/nw-execute @nw-researcher "auth-upgrade" "01-01"
/nw-execute @nw-software-crafter "des-us007" "03-01"  # retry after failure
```

## TDD_PHASES
<!-- Schema v4.0 — canonical source: TDDPhaseValidator.MANDATORY_PHASES -->
<!-- Build system injects mandatory phases from step-tdd-cycle-schema.json -->
{{MANDATORY_PHASES}}

## Success Criteria

- [ ] Agent invoked via Agent tool (dispatcher does not execute the work)
- [ ] Step context extracted from roadmap and passed in prompt
- [ ] Agent appended phase events to execution-log.json
- [ ] Agent did not load roadmap.json

## Next Wave

**Handoff To**: /nw-review for post-execution review
**Deliverables**: Updated execution-log.json, implementation artifacts, and git commits

Versions

The database has no other skills named nw-execute.

Database snapshot: 13.11.2026 · package version 1977c14d0af8 (SHA-256 digest of the entire package)

Downloads in the last 30 days: 0 · ranking

Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.

Similar skills

  • 96tdd-workflows-tdd-cycle
    Use when working with tdd workflows tdd cycle
  • 92plan-execute
    Execute the user's plan that has been iteratively refined, step by step, with resume on failure. Use when the user runs /plan-execute or asks to execute an existing plan.
  • 100tdd-workflows
    Use when working with tdd workflows tdd cycle (Alias for tdd-workflows-tdd-cycle)
  • 100tdd-workflows
    Use when working with tdd workflows tdd cycle (Alias for tdd-workflows-tdd-cycle)
  • 100implementation-planning
    Break down specifications into executable implementation plans with TDD integration. Use when asked to "create plan", "break down tasks", "implementation roadmap", "規劃實作", "拆解任務", "執行計畫", or need step-by-step implementation guidance with test strategies and impact analysis. Use…
  • 100spec-driven-implementation
    Execute spec-driven implementation — auto-detects Quick (plan.md) or Full (tasks.md) mode and runs step-by-step with verification. Use when implementing a planned feature or running TDD tasks.

Feedback and reports