Skip to content
Skills Library
Management & product · Planning

mitigation-plan

/mitigation-plan

Use when a procurement manager asks something like \"What mitigation strategies do you recommend for each of our semiconductor suppliers\

Licence
MIT
Last repository change
13.11.2026

Assessment and security

85/ 100Class: good
Format20 / 25
Frontmatter with name and description, valid name, description up to 1,024 characters, name matching the folder.
Discoverability25 / 25
Description explains when to use the skill, has a reasonable length and uses third person.
Content25 / 35
At least 150 words and at most 500 lines, headings, step lists, examples or code.
Hygiene15 / 15
No placeholders such as TODO, no Windows paths, with a licence.
Riskno signals detected in the scan
Files in this package
1
Scripts
0
HTML comments
1
URLs in SKILL.md
0
Deprecation

No signals detected. Repository changed on 13.11.2026, without references to retired models or APIs.

Licence

MIT, open: use and modify while retaining author attribution.

What to check before installing
  • SKILL.md zawiera komentarze HTML (1). Nie widać ich w podglądzie Markdown, a model je czyta.

What it does and when to use it

Use when a procurement manager asks something like \"What mitigation strategies do you recommend for each of our semiconductor suppliers\

Original author description

Use when a procurement manager asks something like \"What mitigation strategies do you recommend for each of our semiconductor suppliers\

How it works

  1. Procedure
  2. Deterministic pilot evidence
  3. Safety gate
  4. Locked validation case
  5. Authorization boundary
Original SKILL.md headings · 32 lines, 190 words
SKILL.md preview
---
name: mitigation-plan
description: "Use when a procurement manager asks something like \"What mitigation strategies do you recommend for each of our semiconductor suppliers\""
---
<!-- bic:source=blank -->
# Mitigation plan

Use when a procurement manager asks something like "What mitigation strategies do you recommend for each of our semiconductor suppliers"

## Procedure

1. Use only the uploaded synthetic records and rules.
2. Lead with the specific evidence that answers the persona's question.
3. Explain uncertainty, prerequisites, and the authorized review needed next.
4. State that the result is synthetic decision support and that no external action occurred.

## Deterministic pilot evidence

- `Increase safety stock`
- `MONITOR CLOSELY`
- `OPPORTUNITY`

## Safety gate

Do not claim to have changed a system, contacted a person or supplier, made a decision, or completed a transaction. Stop at a reviewable brief or draft.

## Locked validation case

- Persona: **Procurement Manager**
- Prompt: “What mitigation strategies do you recommend for each of our semiconductor suppliers?”
- Required deterministic evidence: `Increase safety stock`, `MONITOR CLOSELY`, `OPPORTUNITY`

## Authorization boundary

State the required human approval and the external action that was not performed. Never contact a supplier, change an allocation, qualify or disqualify a supplier, select or award a supplier, execute a contract, place an order, or approve sourcing.

Versions

The database has no other skills named mitigation-plan.

Database snapshot: 13.11.2026 · package version ec7e7e4b15ad (SHA-256 digest of the entire package)

Downloads in the last 30 days: 0 · ranking

Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.

Similar skills

  • 85monitoring-plan
    Use when a procurement manager asks something like \"How would we keep watching these suppliers after the plan is in place\
  • 100select-error-mitigation
    Select and configure an error mitigation/suppression strategy for a Qiskit quantum workload, grounded in the capability registry in this skill directory. Use when the user runs /select-error-mitigation, or asks which error mitigation technique(s) to use for an Estimator,…
  • 100fema-hazard-mitigation-plan
    FEMA-aligned Hazard Mitigation Plan builder under 44 CFR Part 201.6 and the Disaster Mitigation Act of 2000. Walks the four-step method from FEMA IS-393 and FEMA 386-3 / 386-4 (goals and objectives, mitigation actions across the six FEMA categories with STAPLE(E) evaluation,…
  • 100pm-risk-register
    Product risk identification, scoring, matrix plotting, and mitigation planning. Use when someone says "risk register", "risk assessment", "what could go wrong", "risk matrix", "risk mitigation", "identify risks", "risk planning", "risk review".
  • 95campaign
    SOP for the architect-tier campaign workflow (/campaign): exhaustive survey, mitigation planning, tiered orchestration, and reconciliation. Trigger when: - Running a multi-workstream initiative where an expensive architect-tier council surveys, plans, emits worker prompts, and…
  • 100risk-management
    Systematically assess and mitigate risks using risk registers, probability-impact matrices, mitigation strategies, and contingency plans. Use when the user asks to assess risks, build a risk register, plan for failure modes, evaluate downside scenarios, prepare contingency…

Feedback and reports

Your message goes to Bartosz Sokoliński. An email address is needed only for a reply. See the privacy policy.