milestone-closing

/milestone-closing

Close out a completed milestone by documenting results, noting discrepancies, adding manual testing/demo steps, and preparing PLAN.md for the next cycle. Trigger whenever the user says "close milestone", "milestone done", "wrap up", "close it out", "phase 4", "finish the milestone", "we're done", or when all tasks in PLAN.md are marked complete and the user wants to finalize. Also trigger when the user asks to document what was built, write demo steps, or prepare for the next planning cycle.

Repository
skills ↗
Licence
MIT
Last repository change
22.09.2026

Assessment and security

100/ 100Class: good
Format25 / 25
Frontmatter with name and description, valid name, description up to 1,024 characters, name matching the folder.
Discoverability25 / 25
Description explains when to use the skill, has a reasonable length and uses third person.
Content35 / 35
At least 150 words and at most 500 lines, headings, step lists, examples or code.
Hygiene15 / 15
No placeholders such as TODO, no Windows paths, with a licence.
Riskno signals detected in the scan
Files in this package
1
Scripts
0
HTML comments
0
URLs in SKILL.md
0
Deprecation

No signals detected. Repository changed on 22.09.2026, without references to retired models or APIs.

Licence

MIT, open: use and modify while retaining author attribution.

What it does and when to use it

Close out a completed milestone by documenting results, noting discrepancies, adding manual testing/demo steps, and preparing PLAN.md for the next cycle. Trigger whenever the user says "close milestone", "milestone done", "wrap up", "close it out", "phase 4", "finish the milestone", "we're done", or when all tasks in PLAN.md are marked complete and the user wants to finalize. Also trigger when the user asks to document what was built, write demo steps, or prepare for the next planning cycle.

Triggers from the description

close milestonemilestone donewrap upclose it outphase 4finish the milestonere done
Original author description

Close out a completed milestone by documenting results, noting discrepancies, adding manual testing/demo steps, and preparing PLAN.md for the next cycle. Trigger whenever the user says "close milestone", "milestone done", "wrap up", "close it out", "phase 4", "finish the milestone", "we're done", or when all tasks in PLAN.md are marked complete and the user wants to finalize. Also trigger when the user asks to document what was built, write demo steps, or prepare for the next planning cycle.

How it works

  1. Prerequisites
  2. Phase Workflow
  3. Handling Common Situations
  4. Important Principles
Original SKILL.md headings · 205 lines, 1,473 words
SKILL.md preview
---
name: milestone-closing
description: >
  Close out a completed milestone by documenting results, noting discrepancies, adding
  manual testing/demo steps, and preparing PLAN.md for the next cycle. Trigger whenever
  the user says "close milestone", "milestone done", "wrap up", "close it out", "phase 4",
  "finish the milestone", "we're done", or when all tasks in PLAN.md are marked complete
  and the user wants to finalize. Also trigger when the user asks to document what was
  built, write demo steps, or prepare for the next planning cycle.
model: opus
allowed-tools: Read, Write, Glob, Grep, Edit, Bash(grep *), Bash(git log:*), Bash(head:*), Bash(cargo build:*), Bash(cargo test:*), Bash(cargo clippy:*), Bash(pnpm install:*), Bash(pnpm run:*), Bash(cat .workflow-overrides/*)
---

# Milestone Closing — Documentation, Verification, and Reset

> For the full workflow this skill belongs to, see [workflow-overview.md](../_shared/workflow-overview.md).

You are guiding the human through the **Milestone Closing** phase of an AI-native
milestone-driven workflow. Your job is to verify completeness, document the outcome, record
anything noteworthy, and reset `PLAN.md` for the next cycle.

## Prerequisites

- `PLAN.md` exists with tasks — ideally all marked `[x]` (done) or `[~]` (postponed).
- The `ROADMAP.md` index lists the relevant milestone as `[in progress]`, and its full
  content lives in `roadmap/NNNN-slug.md`. `PLAN.md`'s `> Milestone:` line names that file.

## Phase Workflow

### Step 1: Completeness Check

Read `PLAN.md` and the milestone file `roadmap/NNNN-slug.md` it references (find the path
on `PLAN.md`'s `> Milestone:` line, or the `[in progress]` entry in the `ROADMAP.md`
index). Verify:

1. **All tasks resolved.** Every task should be `[x]` or `[~]`. If any are still `[ ]`,
   ask the human: "Task N is still open — should we implement it, postpone it, or drop
   it before closing?"

2. **Success criteria met.** Read the milestone's success criteria from
   `roadmap/NNNN-slug.md` (formatted as `- [ ]` checkboxes by `strategic-planning`). For
   each criterion, assess whether the implemented tasks collectively satisfy it, then
   **edit the milestone file to tick the box** (`- [ ]` → `- [x]`) for every met criterion.
   Leave unmet criteria as `- [ ]` and either flag them for discussion or annotate them
   inline (e.g., `- [ ] <criterion> — descoped, see closing notes`). Do not skip this
   edit: an unticked criterion in a "completed" milestone is a documentation bug.

3. **Postponed tasks.** For each `[~]` task, confirm the postponement reason is documented
   and ask whether it should become part of a future milestone.

If any tasks are unresolved or criteria are not fully met, discuss with the human before
proceeding.

### Step 2: Write Closing Notes to the Milestone File

Once all tasks are resolved, write the closing content **directly to the milestone file
`roadmap/NNNN-slug.md`**. Do not compose it in chat first — the file is the artifact.

Update the milestone's status from `in progress` to `completed` in **both** the milestone
file's `**Status:**` field and the `ROADMAP.md` index line's `[in progress]` → `[completed]`
marker, then append to the milestone file:

```markdown
**Completed:** <date>

**Closing Notes:**
- <Scope changes: tasks that grew, shrunk, split, or were added mid-milestone>
- <Architectural surprises: tech debt, unexpected coupling, performance issues>
- <Decision changes: original decisions revised during implementation, and why>
- <Postponed items summary: what was deferred and why>

### Manual Testing & Demo

**Prerequisites:**
- <Environment setup, seed data, config needed>

**Verification Steps:**
1. <Step to verify criterion 1>
   - Expected: <what should happen>
2. <Step to verify criterion 2>
   - Expected: <what should happen>
...

**Demo Script** (for stakeholder presentation):
1. <Start state>
2. <Action to show the new capability>
3. <Point out what changed / what's new>
```

**Reconcile the decision log.** The decision log lives in the architecture home
(`<architecture-home>/`), resolved at invocation — the captured stdout below is the
directory name, `architecture` by default when the project has no override file:

!`cat .workflow-overrides/architecture-path 2>/dev/null || echo architecture`

If `<architecture-home>/decisions/` exists, read
`<architecture-home>/decisions.md` (one cheap file — no subagent needed here) and
cross-check it against what actually shipped:

- **New decisions:** if this milestone made an architectural decision that isn't yet in
  the log, name it in the *Decision changes* closing note and point the human at recording
  it (a decision surfaced during planning belongs in `<architecture-home>/decisions/` via
  the recording convention).
- **Revised decisions:** if implementation contradicted an `Accepted` record, that record
  is now stale. Flag it explicitly in the *Decision changes* note — the correct fix is a
  new ADR that supersedes the old one (and marks the old one `Superseded by NNNN`), not
  silent drift. Do not quietly rewrite the old record's decision; surface the conflict so
  the human decides.

The point is that a reader of the milestone file and the decision log should never find
them telling different stories about the same choice.

### Step 3: Review on File

After writing to `roadmap/NNNN-slug.md`, tell the human the closing notes are ready for
review and point them to the file. Apply any requested changes directly to the milestone
file — keep the feedback loop on the file, not in chat.

Ask the human to walk through the verification steps and confirm everything works.

### Step 4: Re-iterate on Deviations

If verification surfaces **deviations from the success criteria** or **missing pieces /
errors that block shippable user value**, do not proceed to reset. Instead, add one or
more tasks to `PLAN.md` so the human can re-iterate via `task-implementation`:

- Phrase each task in the same format as `milestone-breakdown` produces (`- [ ] <task>`
  with a brief description, file hints if known, and acceptance criteria).
- Group them under a heading like `## Re-iteration: <milestone title>` so they're
  distinguishable from the original breakdown.
- After tasks are added, hand back to the human: they run `task-implementation` until
  all new tasks are `[x]`, then re-invoke `milestone-closing`, which restarts at Step 1.

**If in doubt, ask the human** before adding tasks — small polish issues may be better
folded into a patch commit, while genuine scope gaps belong in PLAN.md. Borderline cases
(e.g., "is this a bug or a future enhancement?") should be surfaced explicitly rather
than silently turned into tasks or silently ignored.

Only proceed to Step 5 once verification passes cleanly with no blocking deviations.
Steps 5 and 6 must not run while deviation tasks are open — they only execute on a
clean pass through Step 4.

### Step 5: Update README.md

With the milestone verified and closed, bring `README.md` up to date so it reflects the
project's current state. This is the **holistic narrative** pass — overview, feature
list, positioning, quickstart. Per-task reference docs and examples were already kept in
sync incrementally during `/implementation-cycle` by the `doc-updater` worker, so focus
here on the README's framing and on anything that worker conservatively skipped; don't
re-litigate every flag and endpoint it already documented.

Read the existing `README.md` and reconcile it against what was actually shipped in this
milestone:

- Update feature lists, capability descriptions, or status claims that are now stale.
- Add documentation for newly shipped capabilities (commands, flags, configuration,
  endpoints, etc.) where the README is the right home for them.
- Remove or rewrite sections describing behavior that was changed or replaced.
- Refresh examples, screenshots references, or quickstart steps if they no longer
  match reality.

Keep edits scoped to what changed in this milestone — do not rewrite unrelated parts of
the README. If the milestone produced no user-visible or developer-visible changes that
warrant a README update, note that explicitly to the human and skip the edit.

### Step 6: Reset PLAN.md

Truncate `PLAN.md` to prepare for the next cycle. Replace its contents with:

```markdown
# Plan

> Ready for next milestone breakdown.
> Last completed: <milestone title> (<date>)
```

This keeps a breadcrumb of what came before while making the file clean for the next
breakdown phase.

### Step 7: Hand Off

Briefly note what was delivered and suggest the user commit using `/commit`, then:
- Move to **Strategic Planning** if there's no next open milestone, or
- Move to **Break-Down** if there is one ready.

## Handling Common Situations

**Not all criteria met but human wants to close:**
This is fine — real projects have pragmatic scope cuts. Document what was descoped and
why. Suggest creating a follow-up milestone for the remaining criteria if they're still
important.

**Human discovers a bug during manual testing:**
Use Step 4's re-iteration path: add a task (or a small cluster of tasks) to `PLAN.md`
describing the bug and its acceptance criteria, then let `task-implementation` handle it
under TDD. For trivial polish (typos, copy tweaks), a direct patch is fine — but
anything that touches behavior covered by success criteria should go through a task so
it gets test coverage. If unsure whether something is a "bug now" vs. "future
enhancement", ask the human before deciding.

**Postponed tasks need a home:**
For each postponed task, help the human decide: does it belong in a future milestone?
Should it be tracked as tech debt? Or is it no longer relevant? Add appropriate notes
to the milestone file `roadmap/NNNN-slug.md`.

## Important Principles

- **Honesty over polish.** The closing notes should be candid about what went well and
  what didn't. This history is valuable for future planning.
- **Verification is not optional.** The human must actually run through the testing steps.
  Automated tests passing is necessary but not sufficient — manual verification catches
  integration and UX issues that unit tests miss.
- **Clean break.** After closing, `PLAN.md` should be empty and ready. No leftover state
  bleeding into the next cycle.
- **Celebrate progress.** Closing a milestone is an achievement. Acknowledge what was
  built before moving on.

Versions

The database has no other skills named milestone-closing.

Database snapshot: 13.11.2026 · package version a56b95b82915 (SHA-256 digest of the entire package)

Downloads in the last 30 days: 4 · ranking

Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.

Similar skills

  • 100ijfw-complete-milestone
    Use when a milestone is shipping and you need to archive its artifacts, generate a summary, and seed the next milestone. Trigger: 'milestone complete', 'ship milestone', 'wrap milestone', 'complete milestone <id>', /ijfw-complete-milestone.
  • 90kata-complete-milestone
    Use when the user wants to finish, close, ship, archive, or mark the active Kata milestone complete.
  • 86milestone
    Closes a milestone with a full re-verification. Checks every planned step, deferred item and request, reviews the whole milestone, compares with the best comparable products, records measured baselines and writes a hand-off so the next milestone starts in a fresh conversation.…
  • 92gsd-complete-milestone
    Use when every phase in a milestone is complete and the user wants to archive it, tag the release, and start the next version. Archives roadmap and requirements to .planning/milestones/, updates PROJECT.md, then tags the version.
  • 100milestone-breakdown
    Break down the next open milestone from ROADMAP.md into small, actionable, independently testable tasks in PLAN.md. Trigger whenever the user says "break down", "plan tasks", "create tasks", "task breakdown", "decompose milestone", "phase 2", "let's break this down", references…
  • 90land
    Land a trajectory milestone: take the next milestone whose tasks are all done (or the one given), check the outcome against the milestone's original goal, persist deviations and oddities in the milestone file, describe how the result can be tested and demoed, update…

Feedback and reports

Your message goes to Bartosz Sokoliński. An email address is needed only for a reply. See the privacy policy.