impact-quantification
/impact-quantification
Estimate and communicate business impact of insights. Use when sizing opportunities discovered in analysis, calculating ROI of recommended actions, or prioritizing initiatives by potential impact.
- Author
- nimrodfisher ↗
- Repository
- data-analytics-skills ↗
- Licence
- MIT
- Last repository change
- 25.09.2026
Assessment and security
- Files in this package
- 8
- Scripts
- 3
- HTML comments
- 0
- URLs in SKILL.md
- 0
No signals detected. Repository changed on 25.09.2026, without references to retired models or APIs.
MIT, open: use and modify while retaining author attribution.
- 3 scripts in this package. Review them before installing, as Claude may execute them.
Scripts: scripts/confidence_interval.py, scripts/cost_savings.py, scripts/revenue_impact.py
What it does and when to use it
Estimate and communicate business impact of insights. Use when sizing opportunities discovered in analysis, calculating ROI of recommended actions, or prioritizing initiatives by potential impact.
Original author description
Estimate and communicate business impact of insights. Use when sizing opportunities discovered in analysis, calculating ROI of recommended actions, or prioritizing initiatives by potential impact.
How it works
SKILL.md has no level-two headings · 28 lines, 232 words
SKILL.md preview
--- name: impact-quantification description: Estimate and communicate business impact of insights. Use when sizing opportunities discovered in analysis, calculating ROI of recommended actions, or prioritizing initiatives by potential impact. --- # When to use After an analytical finding surfaces a potential action, change, or opportunity. Use to produce a defensible numeric estimate that stakeholders can act on. Also use when prioritizing a backlog of initiatives — quantified impact is the primary ranking signal. # Process 1. **Classify the impact type** — revenue growth, cost reduction, risk reduction, or efficiency gain. Each type has a different formula family (see `references/impact_quantification_framework.md`). 2. **Gather inputs** — collect baseline metrics, affected population size, expected lift/reduction, time horizon, and confidence level. 3. **Build the point estimate** — use `scripts/revenue_impact.py` for revenue/growth scenarios or `scripts/cost_savings.py` for cost/efficiency scenarios. 4. **Add uncertainty bounds** — use `scripts/confidence_interval.py` to produce low/base/high estimates. Never deliver a single number without a range. 5. **Document assumptions** — fill in `references/assumption_documentation.md` for every input that is estimated rather than directly measured; note the sensitivity of the output to each. 6. **Package the estimate** — complete `assets/impact_estimate_template.md` with the range, assumptions, confidence, and recommended action; optionally build the full `assets/business_case_template.md` for larger decisions. # Inputs the skill needs - Baseline metric value (current state) - Affected population or volume - Expected change (lift %, absolute, or rate change) - Time horizon (monthly / annual) - Confidence level in inputs (high / medium / low) # Output - Impact estimate with low/base/high range - Assumption log (source and sensitivity for each input) - Completed `impact_estimate_template.md` or `business_case_template.md`
Files in this package (8)
- SKILL.md 2 KB
- assets/business_case_template.md 2 KB
- assets/impact_estimate_template.md 1 KB
- references/assumption_documentation.md 3 KB
- references/impact_quantification_framework.md 3 KB
- scripts/confidence_interval.py 3 KB
- scripts/cost_savings.py 4 KB
- scripts/revenue_impact.py 4 KB
Versions
The database has no other skills named impact-quantification.
Identical content appears in 1 other GitHub folders. We show one copy with the highest score.
Database snapshot: 13.11.2026 · package version 58118c61baf1 (SHA-256 digest of the entire package)
Downloads in the last 30 days: 0 · ranking
Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.
Similar skills
- 90insight-synthesis
Transform data findings into compelling insights. Use when converting analysis results into actionable insights, connecting findings to business impact, or preparing insights for stakeholder communication. - 90business-case
Generate comprehensive business cases, ROI analysis, and strategic justification for new initiatives. Use when: business case, ROI, cost-benefit, justify project, strategic value, investment memo, pitch.