Skip to content
Skills Library
Management & product · Planning

founder-launch

/founder-launch

Your launch lead. Builds a dated, step-by-step launch plan: a cheap real-world test first (a waitlist, a pre-sale or a pop-up with a real price, so real buyers confirm what the simulated panel said), then the countdown to opening day with owners and deadlines, the launch-day run sheet, and the first 30 days of what to measure and what to change. Use when the user says "how do I launch", "launch plan", "when can I open", "launch checklist", "go live", or "soft open".

Licence
MIT
Last repository change
03.11.2026

Assessment and security

100/ 100Class: good
Format25 / 25
Frontmatter with name and description, valid name, description up to 1,024 characters, name matching the folder.
Discoverability25 / 25
Description explains when to use the skill, has a reasonable length and uses third person.
Content35 / 35
At least 150 words and at most 500 lines, headings, step lists, examples or code.
Hygiene15 / 15
No placeholders such as TODO, no Windows paths, with a licence.
Riskno signals detected in the scan
Files in this package
1
Scripts
0
HTML comments
0
URLs in SKILL.md
0
Deprecation

No signals detected. Repository changed on 03.11.2026, without references to retired models or APIs.

Licence

MIT, open: use and modify while retaining author attribution.

What it does and when to use it

Your launch lead. Builds a dated, step-by-step launch plan: a cheap real-world test first (a waitlist, a pre-sale or a pop-up with a real price, so real buyers confirm what the simulated panel said), then the countdown to opening day with owners and deadlines, the launch-day run sheet, and the first 30 days of what to measure and what to change. Use when the user says "how do I launch", "launch plan", "when can I open", "launch checklist", "go live", or "soft open".

Triggers from the description

how do I launchlaunch planwhen can I openlaunch checklistgo livesoft open

Arguments

/founder-launch [target launch date]
Original author description

Your launch lead. Builds a dated, step-by-step launch plan: a cheap real-world test first (a waitlist, a pre-sale or a pop-up with a real price, so real buyers confirm what the simulated panel said), then the countdown to opening day with owners and deadlines, the launch-day run sheet, and the first 30 days of what to measure and what to change. Use when the user says "how do I launch", "launch plan", "when can I open", "launch checklist", "go live", or "soft open".

How it works

  1. Step 1: test before you spend
  2. Step 2: the countdown
  3. Step 3: launch day
  4. Step 4: the first 30 days
  5. Output
Original SKILL.md headings · 70 lines, 529 words
SKILL.md preview
---
name: founder-launch
description: >-
  Your launch lead. Builds a dated, step-by-step launch plan: a cheap real-world
  test first (a waitlist, a pre-sale or a pop-up with a real price, so real buyers
  confirm what the simulated panel said), then the countdown to opening day with
  owners and deadlines, the launch-day run sheet, and the first 30 days of what to
  measure and what to change. Use when the user says "how do I launch", "launch
  plan", "when can I open", "launch checklist", "go live", or "soft open".
argument-hint: "[target launch date]"
---

# founder-launch

Launching is a project with a date. This skill turns everything else in the pack
into a dated plan, and starts with the cheapest way to find out if real people
will pay before the big money goes out.

## Step 1: test before you spend

Pick the cheapest real test that fits the business, and run it before signing the
big costs in `founder/numbers.json`:

| business | the test |
| --- | --- |
| physical shop or café | a pop-up, a market stall or a pre-order list with a price and a date |
| online product | a landing page with the price and a "pre-order" or "join the waitlist" button |
| service or agency | three paid pilot clients at the planned price |
| subscription | a founding-member offer, paid up front |

Write the success line before running it (for example: 50 pre-orders in two weeks
at 5,90 €), and compare the result with the panel's buy rate.

EU rules for the test itself:

- A waitlist or landing page collects personal data: privacy policy, Impressum,
  double opt-in for the email, and no tracking pixels before consent.
- A paid pre-sale online is a distance sale: the 14-day right of withdrawal,
  clear delivery dates, and the "zahlungspflichtig bestellen" button apply.
- A pop-up or market stall needs the city's permit for public space
  (Sondernutzungserlaubnis) or the market operator's place, a hygiene setup for
  food, and a registered trade (a short test can still need a Gewerbeanmeldung).
- Non-EU founders: make sure the residence permit allows the test before taking
  money. If real buyers fall
well short of the panel, trust the real buyers and go back to `/founder-offer` or
`/founder-pricing`.

## Step 2: the countdown

From today to launch day, with real dates (ask for the target date; default to the
earliest realistic one given lead times in `founder/ops.md`). Weekly blocks, each
task with an owner and a deadline:

- Legal and money: residence permit check, Gewerbeanmeldung, the ELSTER tax
  questionnaire, business bank account, TSE till, Berufsgenossenschaft and the
  permits from `founder/ops.md`. Lead times are real: the Steuernummer can take
  weeks, a Gaststättenerlaubnis or a Nutzungsänderung months.
- Build: fit-out or website, suppliers ordered by their lead times.
- Brand: sign, packaging, profiles from `founder/brand.md`.
- Marketing: the calendar in `founder/marketing.md` from launch minus 14 days.
- Team: hiring and training on the SOPs.
- A soft open or friends-and-family day before the public launch.

Mark the critical path: the tasks that move the launch date if they slip.

## Step 3: launch day

An hour-by-hour run sheet: who is where, what goes out on which channel, the
opening offer, what to do if something breaks (from the risk register).

## Step 4: the first 30 days

The weekly numbers to track (from the CFO: units a day against break-even; from
marketing: the channel numbers), the level that triggers a change, and a review on
days 7, 14 and 30 with the questions to answer.

## Output

`founder/launch.md` with the test, the countdown, the run sheet and the 30-day
review. Next: `/founder-plan` compiles everything into the business plan.

Versions

RepositoryScoreLicence
This page · AbdulFaiz123/founder-skill-eu100MIT
jakeschincariol/founder-skill100MIT

Database snapshot: 13.11.2026 · package version fad9ef3dcf0c (SHA-256 digest of the entire package)

Downloads in the last 30 days: 3 · ranking

Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.

Similar skills

  • 100prove-it
    Your launch lead. Builds a dated, step-by-step launch plan: a cheap real-world test first (a waitlist, a pre-sale or a pop-up with a real price, so real buyers confirm what the simulated panel said), then the countdown to opening day with owners and deadlines, the launch-day run…
  • 100launchproof-launch
    Your launch lead. Builds a dated, step-by-step launch plan: a cheap real-world test first (a waitlist, a pre-sale or a pop-up with a real price, so real buyers confirm what the simulated panel said), then the countdown to opening day with owners and deadlines, the launch-day run…
  • 100launch-plan-sequencer
    Use when planning a product launch end-to-end and you need the full dated timeline. Triggers on "plan my launch", "launch plan", "how do I sequence a launch", "pre-launch checklist", "what happens before launch day", "launch timeline", "GTM launch plan", "coordinate a launch…
  • 90launch-war-room
    Runs a 7-day launch countdown with a daily plan, owners, launch-day run sheet, metrics and a post-launch review. Use when the user is launching a product, feature or campaign soon, or says 'we launch next week'.
  • 100launch-roadmap
    Asks how many days until launch and turns the open audit findings into a day-by-day roadmap: Day 1, Day 2, and so on up to Launch Day, saying what to do each day, how long it takes and when each day is done, and shows it in the report using a fixed template. Use when the user…
  • 95memstack-marketing-launch-plan
    Use this skill when the user says 'launch plan', 'product launch', 'go-to-market', 'launch calendar', or needs a day-by-day launch timeline with pre-launch, launch week, and post-launch task checklists. Do NOT use for ongoing funnel design or ad copy alone.

Feedback and reports

Your message goes to Bartosz Sokoliński. An email address is needed only for a reply. See the privacy policy.