Use when constructing the finance-side forecast — top-down vs bottom-up shape, confidence bands, retro-loop. Triggers on 'build the forecast model', 'reconcile top-down with bottom-up'.

Licence
MIT
Last repository change
26.10.2026

Assessment and security

100/ 100Class: good
Format25 / 25
Frontmatter with name and description, valid name, description up to 1,024 characters, name matching the folder.
Discoverability25 / 25
Description explains when to use the skill, has a reasonable length and uses third person.
Content35 / 35
At least 150 words and at most 500 lines, headings, step lists, examples or code.
Hygiene15 / 15
No placeholders such as TODO, no Windows paths, with a licence.
Riskno signals detected in the scan
Files in this package
3
Scripts
0
HTML comments
0
URLs in SKILL.md
0
Deprecation

No signals detected. Repository changed on 26.10.2026, without references to retired models or APIs.

Licence

MIT, open: use and modify while retaining author attribution.

What it does and when to use it

Use when constructing the finance-side forecast — top-down vs bottom-up shape, confidence bands, retro-loop. Triggers on 'build the forecast model', 'reconcile top-down with bottom-up'.

Triggers from the description

build the forecast modelreconcile top-down with bottom-up
Original author description

Use when constructing the finance-side forecast — top-down vs bottom-up shape, confidence bands, retro-loop. Triggers on 'build the forecast model', 'reconcile top-down with bottom-up'.

How it works

  1. When to use
  2. Cognition cluster
  3. Procedure
  4. Related Skills
  5. When the agent should load this
  6. Output
  7. Gotcha
  8. Do NOT
  9. Runnable example
Original SKILL.md headings · 156 lines, 1,104 words
SKILL.md preview
---
model_tier: high
name: forecasting
description: "Use when constructing the finance-side forecast — top-down vs bottom-up shape, confidence bands, retro-loop. Triggers on 'build the forecast model', 'reconcile top-down with bottom-up'."
status: active
tier: senior
domain: process
context_spine: [product, fiscal-period, customer-segment]
recommended_for_user_types: [finance, founder]
workspaces:
  - finance
packs:
  - finance-basic
trust:
  level: professional
install:
  removable: true
---

# forecasting

## When to use

- The annual plan or quarterly board pack needs a forecast model that survives a retro — not last quarter's number with a multiplier.
- Top-down (TAM × penetration × motion) and bottom-up (deal-level) calls have diverged and the reconciliation hasn't been written.
- A new finance-partner inherits a forecast and needs to rebuild the construction shape without inheriting the prior regime's optimism.

Do NOT use to qualify a single deal (route to `deal-qualification-meddic`), construct the RevOps commit list (route to `forecast-accuracy` (H10) — finance owns the shape, RevOps owns the call), or run capital-runway scenarios (route to `runway-cognition` (O3)).

## Cognition cluster

- **Mental model 9 — Hypothesis-driven thinking.** Each forecast is
  a falsifiable claim about a window. If the call cannot be falsified
  inside the window, the call is a narrative, not a forecast. See
  [`mental-models.md`](../../../docs/contracts/mental-models.md) § 9.
- **Mental model 29 — Premortem.** Before locking the call, write the
  post-window retro as if commit missed by 20 %. The premortem
  surfaces which construction inputs were riding on weak evidence;
  demote those before the call locks. See `mental-models.md` § 29.
- **Mental model 16 — Leading vs lagging.** Closed-won is lagging;
  pipeline coverage, segment conversion, and slot-completeness are
  leading. A forecast built only on lagging signals can confirm but
  not steer. See `mental-models.md` § 16.
- **Context-spine — product + fiscal-period + customer-segment.**
  Read the **product** slot for what is GA-shippable in the window;
  the **fiscal-period** slot for the cadence the model must
  reconcile against (monthly close vs quarterly board pack vs annual
  plan vs multi-year plan); the **customer-segment** slot for
  segment-historical close rates. See
  [`context-spine`](../../../docs/contracts/context-spine.md).

## Procedure

### Step 0: Inspect the construction shape

Read the fiscal-period slot. Decide between three shapes:

1. **Top-down** — anchor against TAM × penetration band × motion
   band. Healthy for annual plans and multi-year plans where
   bottom-up evidence is thin past one window.
2. **Bottom-up** — sum deal-level conviction (composes H10
   `forecast-accuracy` via the `forecast-construction-shape` ADR).
   Healthy for quarterly windows where deal evidence is fresh.
3. **Hybrid** — both, with an explicit reconciliation. Healthy when
   top-down and bottom-up diverge by more than the historical
   confidence band.

State the choice. A forecast without a stated shape inherits the
prior regime's shape silently.

### Step 1: Construct the call against the shape

For top-down: write `{tam, penetration_band, motion_band}` — every
input cites its source. Penetration bands are evidence ranges, not
single points; motion bands reflect channel mix.

For bottom-up: consume H10's commit-list against the
`forecast-construction-shape` interface. Sum commit-tagged ×
in-window close-rate per segment.

For hybrid: do both, then write the reconciliation. If top-down ≠
bottom-up by more than the confidence band, the divergence is the
forecast — not either number.

### Step 2: Calibrate the confidence band

Compute historical deviation from the last 4–8 windows of the same
fiscal-period cadence. Attach as `{plus_pct, minus_pct}`. A band
asymmetric on the downside is honest about prior misses; symmetric
bands silently pretend prior accuracy.

### Step 3: Premortem the construction

Write *"if the forecast misses by 20 %, the reason is ___."* For
top-down: which penetration / motion input was the load-bearing
assumption? For bottom-up: which anchor deals carry > 10 % of
commit? Demote inputs that the premortem can name as single-point
risks.

### Step 4: Emit the typed interface

Produce `forecast-band.json` per the `forecast-construction-shape`
ADR. H10 consumes the artifact for the commit-call. The fields:
`construction_shape`, `commit_value`, `best_case_value`,
`pipeline_value`, `confidence_band`, `retro_signature`,
`segment_scope`, `fiscal_period`, `construction_inputs`. Drop the
artifact in the location H10's `## Output` references.

### Step 5: Run the accuracy retro-loop

At window-end, compare predicted commit / best-case to actual
closed-won. Compute per-segment and per-construction-input miss
rate. Patterns that repeat for two windows become shape changes in
Step 0 (e.g. switching from bottom-up to hybrid because deal
evidence stopped predicting); one-off misses become input upgrades
in Step 1.

## Related Skills

**WHEN to use this**

- Constructing the finance-side forecast (annual plan, board pack, multi-year plan).
- Running the construction-shape retro and feeding it back into Step 0.

**WHEN NOT to use this**

- Single-deal qualification — route to [`deal-qualification-meddic`](../deal-qualification-meddic/SKILL.md).
- Commit / best-case / pipeline categorisation of deals — route to [`forecast-accuracy`](../forecast-accuracy/SKILL.md) (H10); H10 consumes against this skill's `forecast-band.json` interface.
- Cash-runway shape and fundraise-trigger heuristics — route to [`runway-cognition`](../runway-cognition/SKILL.md) (O3).
- Multi-statement scenario construction over base / upside / downside — route to [`scenario-modeling`](../scenario-modeling/SKILL.md) (O4).

Wing-4 handoff: this skill emits the `forecast-band.json` artifact
that `forecast-accuracy` (H10, Wing-3) reads. Per
`docs/contracts/adr-forecast-construction-shape.md`,
`docs/guidelines/wing4-handoff.md` § Chain 4.

## When the agent should load this

- "Build the annual forecast model."
- "Top-down and bottom-up disagree — reconcile them."
- "Why was last quarter's forecast off?"
- "Was machen wir bei der Forecast-Konstruktion anders?"

## Output

1. **`forecast-band.json`** *(Wing-3 / Wing-4 typed interface)* — `construction_shape`, `commit_value`, `best_case_value`, `pipeline_value`, `confidence_band`, `retro_signature`, `segment_scope`, `fiscal_period`, `construction_inputs`. Per `adr-forecast-construction-shape.md`.
2. **`construction-notes.md`** — shape chosen + why; per-input evidence; reconciliation note (hybrid only).
3. **`premortem.md`** — "if we miss by 20 %, the reason is ___"; tagged demotions from Step 3.
4. **`retro-deltas.md`** *(at window-end)* — predicted vs actual per construction input; shape-change recommendation if the pattern repeats.

## Gotcha

- A forecast without a stated `construction_shape` inherits last regime's shape silently. Always emit the field.
- Symmetric confidence bands lie about prior misses. If the last two windows missed on the downside, the band is asymmetric.
- Top-down models with single-point penetration assumptions are scenarios in disguise. Use bands.
- Hybrid models that don't write the reconciliation are top-down models with bottom-up garnish.

## Do NOT

- Do NOT collapse hybrid forecasts into a single number without keeping the divergence visible.
- Do NOT skip Step 4 — the typed interface is what makes H10 reproducible.
- Do NOT change the construction shape on a single-window miss; shape changes require a two-window pattern.

## Runnable example

End of FY: annual plan + Q1 commit both due.

- Step 0 — fiscal-period slot says `annual` + `quarterly`. Annual is top-down; Q1 is bottom-up.
- Step 1 — top-down: TAM $4.2B, penetration band 0.6–0.9 %, motion band SaaS-mid; expected $25–38M ARR. Bottom-up: H10 commit-list sums to $8.1M in Q1, segment close rate 78 %.
- Step 2 — last 4 quarters deviation: +6 % / –14 %. Confidence band attached.
- Step 3 — premortem: top-down anchored on penetration upper bound; demoted to 0.6–0.75 %. Bottom-up: two anchor deals tagged single-risk procurement; demoted.
- Step 4 — emit `forecast-band.json`: `construction_shape=hybrid`, commit $6.3M, best-case $8.1M, band +6/–14 %, retro_signature `quarterly | [+6, –14]`, segment_scope mid-market, fiscal_period `quarterly`.
- Retro — at quarter-end, actual $6.1M; band held. Annual top-down revisit in two quarters.
Files in this package (3)
  • SKILL.md 8 KB
  • evals/domain-truth.json 2 KB
  • evals/evals.json 1 KB

Versions

RepositoryScoreLicence
This page · event4u-app/agent-config100MIT
ericrisco/rsc-harness100MIT

Database snapshot: 13.11.2026 · package version ec5292930257 (SHA-256 digest of the entire package)

Downloads in the last 30 days: 0 · ranking

Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.

Similar skills

  • 100forecast-accuracy
    Use when constructing the forecast call — commit / best-case / pipeline categorisation, deal-level evidence test, accuracy retro-loop. Triggers on 'build the forecast', 'why does our commit miss'.
  • 90revenue-forecasting
    Revenue forecasting pipeline - bottoms-up pipeline forecast, tops-down model, ensemble blending, scenario analysis, and forecast calibration loop. Use when: revenue forecast, sales forecast, pipeline forecast, bookings forecast, NRR forecast, ARR forecast, forecast calibration,…
  • 100gtm-forecasting
    When the user wants a revenue forecast built from recorded pipeline — coverage, commit cases and stage probabilities. Use for 'build a forecast', 'forecast from pipeline', 'commit and best case', 'will we hit number', 'forecast model'. Stage probabilities are the user's assumptions.
  • 90budgeting-and-forecasting
    Runs the planning cycle — annual budget, rolling forecast, consolidation of business unit inputs, and the variance analysis that explains actuals against plan. Use this to build or challenge a budget, run a forecast cycle, consolidate departmental submissions, explain why…
  • 100multi-horizon-forecasting-architecture
    Use when models forecast the same instrument over several forward horizons at once and their outputs must become one tradeable alpha; rescales each forecast onto a common horizon before weighting them.
  • 90budget-forecast
    When the user wants to create a budget, forecast future performance, or perform variance analysis. Also use when the user mentions "financial projections," "2025 planning," "burn rate forecast," "revenue modeling," "budget vs actual," "planning for next year," or "financial…

Feedback and reports

Your message goes to Bartosz Sokoliński. An email address is needed only for a reply. See the privacy policy.