flyio-deploy-integration
/flyio-deploy-integration
Plan a Fly.io rolling, canary, or blue-green release with health, capacity, storage, and rollback constraints. Use when a release needs progressive exposure. Trigger with: "canary deploy on Fly", "use Fly blue-green", "design Fly rollout".
- Author
- jeremylongshore ↗
- Repository
- tons-of-skills-marketplace ↗
- Licence
- MIT
- Last repository change
- 26.10.2026
Assessment and security
- Files in this package
- 2
- Scripts
- 0
- HTML comments
- 0
- URLs in SKILL.md
- 5
No signals detected. Repository changed on 26.10.2026, without references to retired models or APIs.
MIT, open: use and modify while retaining author attribution.
What it does and when to use it
Plan a Fly.io rolling, canary, or blue-green release with health, capacity, storage, and rollback constraints. Use when a release needs progressive exposure. Trigger with: "canary deploy on Fly", "use Fly blue-green", "design Fly rollout".
Triggers from the description
Arguments
/flyio-deploy-integration [app-release-and-strategy]
Original author description
Plan a Fly.io rolling, canary, or blue-green release with health, capacity, storage, and rollback constraints. Use when a release needs progressive exposure. Trigger with: "canary deploy on Fly", "use Fly blue-green", "design Fly rollout".
How it works
- Overview
- Prerequisites
- Instructions
- Authentication
- Tool Discipline
- Output
- Examples
- Error Handling
- Resources
SKILL.md preview
--- name: flyio-deploy-integration description: >- Plan a Fly.io rolling, canary, or blue-green release with health, capacity, storage, and rollback constraints. Use when a release needs progressive exposure. Trigger with: "canary deploy on Fly", "use Fly blue-green", "design Fly rollout". allowed-tools: Read, Grep, Write, Edit version: 2.0.0 argument-hint: '[app-release-and-strategy]' model: inherit effort: high license: MIT author: Jeremy Longshore <jeremy@intentsolutions.io> tags: - saas - flyio - progressive-delivery - canary - blue-green compatibility: 'Requires a Fly Launch app, immutable image, configured health checks, sufficient temporary capacity, and an approved deployment and rollback owner.' --- # Fly.io Progressive Deployment Design ## Overview Select a provider-supported deployment strategy based on state, volume attachment, temporary capacity, and risk. Do not implement a custom traffic switch when Fly Launch already provides rolling, canary, blue-green, and immediate strategies with defined constraints. ## Prerequisites - Immutable candidate and previous image references - Healthy baseline Machines and at least one meaningful service health check - State and volume inventory plus temporary capacity and cost approval ## Instructions ### Step 1: Classify the workload Identify stateless and stateful process groups, attached volumes, singleton regions, release commands, connection draining, and external dependencies. ### Step 2: Choose a supported strategy Use rolling for the general case. Canary creates one new Machine then rolls forward; blue-green creates replacement capacity in each region. Immediate is an emergency option with explicit downtime risk. ### Step 3: Validate strategy constraints Reject canary or blue-green for Machines with attached volumes. Ensure blue-green has health checks and enough quota and capacity; account for `max-per-region` behavior. ### Step 4: Define acceptance gates Set health, error, latency, saturation, business, and data-reconciliation thresholds with an observation window and named approver. ### Step 5: Execute one release owner Pin image and config, serialize the release, observe Machine replacement and health, and prevent unrelated scaling or secret changes during the window. ### Step 6: Promote or reverse Confirm every region and process group runs the intended image. If a gate fails, stop progression and restore the recorded prior release or configuration. ## Authentication Use a scoped deploy token whose app and expiry match the rollout. Keep observation separate with read-only access where practical. Never embed the token in `fly.toml`, image layers, release metadata, or health-check output. ## Tool Discipline Use Read and Grep to inspect application configuration, deployment evidence, provider documentation, fixtures, logs, schemas, and existing tests before proposing a change. Use Write or Edit only for an approved plan, configuration, implementation, test, or redacted receipt. Do not create, deploy, scale, restart, stop, suspend, destroy, rotate, revoke, expose, or migrate live Fly.io resources without explicit operator approval. ## Output - Strategy decision with workload and volume constraints - Capacity, health, observation, promotion, and rollback gates - Per-region release and image reconciliation receipt Return the target organization, app, environment, region set, Machine or database identifiers, source-contract fingerprint, evidence, unresolved risks, rollback state, and final decision without exposing tokens, secrets, connection strings, or customer data. ## Examples A stateless service with two Machines per region and HTTP health checks uses blue-green. The operator confirms no volumes, approves temporary doubled capacity, observes all new Machines healthy, verifies the image digest, and only then allows old Machines to be destroyed. ## Error Handling | Failure | Response | | --- | --- | | Strategy is incompatible with a volume | Switch to rolling or redesign persistence; do not force canary or blue-green. | | New capacity cannot be placed | Stop before destroying old Machines and reassess region capacity or strategy. | | Health passes but business gate fails | Treat the release as failed and reverse using the pinned previous image. | ## Resources - [First-party source notes](references/official-docs.md) - [Machines API setup](https://fly.io/docs/machines/api/working-with-machines-api/) - [Automation and tokens](https://fly.io/docs/flyctl/integrating/) - [App configuration](https://fly.io/docs/reference/configuration/) - [Deploy strategies](https://fly.io/docs/launch/deploy/) - [Health checks](https://fly.io/docs/reference/health-checks/)
Files in this package (2)
- SKILL.md 5 KB
- references/official-docs.md 2 KB
Versions
The database has no other skills named flyio-deploy-integration.
Identical content appears in 1 other GitHub folders. We show one copy with the highest score.
Database snapshot: 13.11.2026 · package version 6f04bf4a8932 (SHA-256 digest of the entire package)
Downloads in the last 30 days: 1 · ranking
Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.
Similar skills
- 100flyio-prod-checklist
Gate a Fly.io production release across ownership, configuration, identity, health, capacity, data, observability, cost, and rollback. Use when reviewing a first launch or material change. Trigger with: "review Fly production readiness", "approve Fly launch", "run Fly go-live checklist". - 100flyio-core-workflow-a
Operate a Fly.io application release from configuration review through deploy, scale, secret change, and rollback. Use when shipping or changing a Fly Launch app. Trigger with: "deploy Fly app", "scale Fly Machines", "roll back Fly release". - 100blue-green-deploy
Configure zero-downtime deployment strategies including blue-green, canary, and rolling deployments. Implement traffic shifting, health checks, and rollback procedures. Use when implementing production deployment strategies or zero-downtime releases. - 90deployment-strategies
Gets a change into production safely — blue-green, canary, rolling, feature flags, and the rollback that makes each of them safe. Use this whenever the user is planning a release, asks how to deploy without downtime, mentions canary or blue-green, is adding a feature flag, or is… - 100deploy
Post-merge deployment workflow covering feature flags, canary/blue-green rollout, smoke-test verification, and rollback triggers. Use after a PR is merged and you need to ship it safely to production. Trigger on "deploy", "roll out", "canary", "feature flag", "rollback". - 100deployment-strategies
Chooses and implements the deployment technique — blue-green, canary, rolling, or shadow — that buys the most information before you're fully committed, plus the rollback plan that makes each one safe. Use this whenever the user asks how to deploy with zero downtime, wants a…