fermi-estimation
/fermi-estimation
Use for Fermi estimation, or when a rough number is needed fast: "roughly how many...", "ballpark the cost", "estimate capacity or market size", "is this even feasible?". Decomposes, uses ranges and sanity-checks. Skip when exact data is available or a precise calculation is wanted.
- Author
- ysskrishna ↗
- Repository
- ai-agent-skills ↗
- Licence
- MIT
- Last repository change
- 17.10.2026
Assessment and security
- Files in this package
- 2
- Scripts
- 0
- HTML comments
- 0
- URLs in SKILL.md
- 0
No signals detected. Repository changed on 17.10.2026, without references to retired models or APIs.
MIT, open: use and modify while retaining author attribution.
What it does and when to use it
Use for Fermi estimation, or when a rough number is needed fast: "roughly how many...", "ballpark the cost", "estimate capacity or market size", "is this even feasible?". Decomposes, uses ranges and sanity-checks. Skip when exact data is available or a precise calculation is wanted.
Triggers from the description
Original author description
Use for Fermi estimation, or when a rough number is needed fast: "roughly how many...", "ballpark the cost", "estimate capacity or market size", "is this even feasible?". Decomposes, uses ranges and sanity-checks. Skip when exact data is available or a precise calculation is wanted.
How it works
- When to use
- Before you start
- Steps
- Pitfalls
- Checklist
SKILL.md preview
--- name: fermi-estimation description: > Use for Fermi estimation, or when a rough number is needed fast: "roughly how many...", "ballpark the cost", "estimate capacity or market size", "is this even feasible?". Decomposes, uses ranges and sanity-checks. Skip when exact data is available or a precise calculation is wanted. license: MIT metadata: author: ysskrishna version: "2026.10.5" --- # Fermi Estimation Get a defensible order-of-magnitude answer from factors you can reason about. The goal is the right power of ten and a clear view of what drives it, not a precise number. ## When to use - Capacity, load, storage, cost, headcount, market size or time estimates with little data. - "Roughly how many", "ballpark", "back of the envelope", "is it even feasible". - Checking whether a plan's numbers are plausible before investing in measurement. Skip: when exact data exists (query it instead), or the user needs a precise calculation. ## Before you start 1. State in one block: **Quantity** (with units and period), **Purpose** (what decision depends on it), **Needed accuracy** (a power of ten, or within a factor of 2), and **Pass** (Decompose, Estimate, Combine, Cross-check, Sensitivity). 2. **Gather first.** Look for real anchors before guessing: logs, dashboards, billing, docs, prior numbers. Replace any guess with data you can find. Ask up to 3 questions only for anchors tools cannot supply. 3. **Light path.** Small ask: 3-4 factors, one range each, a result line and one cross-check. ## Steps ### 1. Decompose Break the quantity into factors you can estimate, usually a product: population x frequency x size, or rate x time. Write the formula first. ### 2. Estimate For each factor give a **low** and **high** and a one-line basis. Mark guesses `[ESTIMATED]`; mark found data with its source. | Factor | Low | High | Basis | |--------|-----|------|-------| ### 3. Combine Multiply lows and highs for bounds. For a single central value, take the geometric midpoint (the square root of low x high), which suits ranges that span powers of ten. Report the result as a range and an order of magnitude. ### 4. Cross-check Estimate the same quantity a second way (top-down vs bottom-up, or compare to a known similar system). If the two differ by more than about 3x, find which factor is off. ### 5. Sensitivity Name the one or two factors that move the answer most, and what measurement would narrow them. ## Pitfalls - False precision: "47,312 requests per second" from guessed inputs. Round to one significant figure. - Unit mismatches (per day vs per second, bytes vs bits). Write units in every row. - Double counting a factor that appears in two inputs. - Anchoring on the first number you thought of. Estimate the low and high first, then the middle. - Skipping the cross-check, which is what separates an estimate from a guess. - Forgetting peaks: averages hide the busiest hour. State average and peak when sizing capacity. Worked example: [references/example.md](references/example.md). ## Checklist - [ ] Quantity, units, purpose and needed accuracy stated - [ ] Formula written before numbers - [ ] Each factor has low, high, basis; guesses marked `[ESTIMATED]` - [ ] Result as a range and order of magnitude - [ ] Cross-checked a second way - [ ] Dominant factor named, with the measurement that would narrow it
Files in this package (2)
- SKILL.md 3 KB
- references/example.md 2 KB
Versions
The database has no other skills named fermi-estimation.
Database snapshot: 13.11.2026 · package version ea1cc16ef465 (SHA-256 digest of the entire package)
Downloads in the last 30 days: 0 · ranking
Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.
Similar skills
- 100estimation-fermi
Produces a quick back-of-envelope (Fermi) estimate: breaks the unknown into estimable factors, states assumptions, gives bounds and cross-checks with a second path. Use when the user asks for a ballpark, rough or order-of-magnitude number, "roughly how many...", "quick estimate… - 90estimation
Bound it before you build it. Use when a decision is blocked by "we don't have data", an estimate looks suspiciously precise, someone asks "is this even feasible?", "how much capacity do we need?", "will this scale?", or a claimed number has never been cross-checked by a second method. - 90estimation-techniques
Estimate unknown quantities with Fermi decomposition, reference classes, and honest error bars. Use when you need a number for a decision and no exact figure exists. - 90estimation-sizing
Size a backlog with reference-class forecasting, probabilistic ranges, and relative estimation as ranges not commitments. Use when: estimate product backlog, reference class forecasting, probabilistic p50 p90 estimate, t-shirt sizing stories, story point estimation, run planning… - 100dimensional-analysis-estimation
Use dimensional analysis, scaling laws, order-of-magnitude and Fermi estimation to solve or sanity-check physics problems: Buckingham Pi theorem, natural units, similarity, back-of-envelope calculation. Use whenever the user wants a quick estimate or a check of units and scaling. - 100create-estimation
Create a three-point estimation when the user asks to estimate effort, scope a feature, size work, forecast timeline, or plan capacity for a project or feature