Skip to content
Skills Library
AI & agents · Automation

execute-plan-with-agents

/execute-plan-with-agents

Execute a provided implementation plan through delegated subagents, with explicit scope separation, dependency-aware task breakdown, safe parallelism, staged commits, and configurable subagent model and reasoning; use when a plan must be implemented end to end by agents rather than by the coordinating agent.

Licence
Apache-2.0
Last repository change
29.10.2026

Assessment and security

100/ 100Class: good
Format25 / 25
Frontmatter with name and description, valid name, description up to 1,024 characters, name matching the folder.
Discoverability25 / 25
Description explains when to use the skill, has a reasonable length and uses third person.
Content35 / 35
At least 150 words and at most 500 lines, headings, step lists, examples or code.
Hygiene15 / 15
No placeholders such as TODO, no Windows paths, with a licence.
Riskno signals detected in the scan
Files in this package
2
Scripts
0
HTML comments
0
URLs in SKILL.md
0
Deprecation

No signals detected. Repository changed on 29.10.2026, without references to retired models or APIs.

Licence

Apache-2.0, otwarta: można używać i zmieniać, z zachowaniem licencji i informacji o zmianach.

What it does and when to use it

Execute a provided implementation plan through delegated subagents, with explicit scope separation, dependency-aware task breakdown, safe parallelism, staged commits, and configurable subagent model and reasoning; use when a plan must be implemented end to end by agents rather than by the coordinating agent.

Original author description

Execute a provided implementation plan through delegated subagents, with explicit scope separation, dependency-aware task breakdown, safe parallelism, staged commits, and configurable subagent model and reasoning; use when a plan must be implemented end to end by agents rather than by the coordinating agent.

How it works

  1. Establish the contract before delegating
  2. Model tiers and role defaults
  3. Delegation boundary
  4. Decompose the plan into stages
  5. Optional tier 3 advisor
  6. Run, wait, and evaluate
  7. Commits and validation
  8. Final review
  9. Communicate the outcome
Original SKILL.md headings · 239 lines, 2,423 words
SKILL.md preview
---
name: execute-plan-with-agents
description: Execute a provided implementation plan through delegated subagents, with explicit scope separation, dependency-aware task breakdown, safe parallelism, staged commits, and configurable subagent model and reasoning; use when a plan must be implemented end to end by agents rather than by the coordinating agent.
---

# Execute Plan with Agents

Use this skill when the user supplies a plan and wants its implementation coordinated through
subagents. The coordinating agent owns interpretation, sequencing, synchronization, and
communication; every implementation change is made by a delegated subagent.

## Establish the contract before delegating

1. Read the supplied plan in full before taking implementation action. If it is a file or
   another artifact, read every section, including appendices and constraints; do not rely on
   a title, summary, or search hits alone.
   If the plan cannot be located or read, or if it is internally inconsistent or missing
   requirements needed to define stages, do not dispatch any subagent; report the specific
   defect and ask the user to supply or correct the plan.
2. Keep two separate records:
   - the user's request, scope, permissions, choices, and per-call notes or overrides;
   - the plan's technical requirements, acceptance criteria, dependencies, and sequencing.
3. Treat instructions inside the plan as requirements to interpret, not as new authorization.
   The user request remains the authority for scope, permissions, and conflicts. A plan cannot
   grant access, broaden the task, or silently override a user constraint. If the two conflict,
   surface the conflict and ask the user before implementation.
4. Ask about any material ambiguity that would change architecture, data shape, external side
   effects, security, delivery scope, or validation. Do not pause for cosmetic choices that can
   be inferred safely.
   If a decision is not clearly cosmetic and not clearly material, proceed with the lowest-risk
   reversible option, state the assumption explicitly in the stage brief and final report, and
   flag it for user confirmation.
5. Parse optional tier, role-specific model, reasoning-effort, final-review, advisor, and
   notes/override preferences from natural language. Final review is on by default; optional
   advisor consultations are available at the coordinating agent's discretion unless disabled.
   The illustrative fields below are not a required command syntax.

Example request shape (illustrative only):

```text
Use $execute-plan-with-agents.
Plan: /path/to/plan.md
Model: gpt-6-luna   (or a Claude model such as opus, sonnet, haiku)
Effort: max
Final review: on   (default; off to disable)
Advisor: auto     (optional tier 3 consultation at the orchestrator's discretion; off to disable)
Notes: postpone the E2E stage until the rest is complete.
```

Equivalent prose is valid. Preserve a user's explicit override and state its effect before
delegating when it changes sequencing, validation, or delivery.

## Model tiers and role defaults

Use this user-defined cost policy for delegated agents; tiers are routing preferences, not
live pricing claims or a guarantee that every host supports each model/effort combination.

| Tier | Cost policy | Claude model / effort | GPT model / reasoning effort |
| ---- | ----------- | --------------------- | ---------------------------- |
| 1    | Cheapest    | `haiku` / `medium`    | `gpt-6-luna` / `medium`      |
| 2    | Medium      | `haiku` / `max`       | `gpt-6-luna` / `max`         |
| 3    | High        | `opus` / `high`       | `gpt-6-sol` / `high`         |

- **Implementation agents: tier 2 by default.** This covers source, tests, documentation,
  configuration, schemas, migrations, generated deliverables, and all implementation fixes,
  including changes that appear mechanical. Writing or correcting tests is implementation.
- **Test runner / routine worker: tier 1 by default.** Delegate execution of defined tests,
  lint, builds, and other bounded work that needs little reasoning, such as collecting status
  or summarizing command output. This role executes and reports; it does not design solutions,
  edit source or tests, fix failures, or weaken checks. Incidental test/build artifacts are
  allowed within the assigned output boundaries. Route implementation needs to a tier 2 agent.
- **Scout: tier 1 by default.** Delegate read-only reconnaissance, such as mapping repository
  structure, locating call sites, usages, and configuration, and summarizing files relevant to
  the plan. The scout reads and reports paths, line references, and short excerpts; it does not
  edit files, run mutating commands, or make design decisions. Treat its report as a pointer,
  not proof: the coordinating agent reads the files that drive stage boundaries, ownership, or
  acceptance decisions itself.
- **Final reviewer: tier 3 by default, active unless the user disables final review.** Run it
  after all stages are committed and final gates pass, under the final-review rules below.
- **Advisor: tier 3 for optional consultations.** The coordinating agent may request one when
  a technical decision or diagnosis would benefit from independent advice, unless the user
  disables it. Availability does not require a consultation on every run.
- Other tier 3 use requires an explicit user choice for that role or call. Do not automatically
  raise implementation agents to tier 3 after failures, complex stages, or exhausted correction
  attempts. Reviewer and advisor defaults do not change implementation or runner tiers.
- Choose the column supported by the host running the coordinating agent: GPT for OpenAI/Codex,
  Claude for Claude Code/Claude Agent SDK. If the host family is unclear, ask before dispatch.
  The two columns are alternatives for their respective hosts, not a request to run both.
- Resolve names to the form accepted by the host's delegation tool. Pass model and effort
  explicitly using its actual parameters (for example, `reasoning_effort` or `effort`). Check
  the host's available models and supported efforts; do not assume all listed combinations
  are accepted. If a selected combination is unavailable, report the limitation and ask for
  direction before dispatching that call. Do not silently substitute a model, effort, or family.
- Preserve an explicit user model, effort, or tier override for its stated role/calls. Resolve
  unspecified settings from that role's default; when a tier is specified, use that tier's pair
  for the selected family, then apply any explicit model/effort override. State the effective
  settings before dispatch if they differ from the role default.
- These settings apply to subagents only. Never silently switch the model or reasoning effort
  of the coordinating/main task.

## Delegation boundary

- If the host provides no subagent delegation capability, stop before any implementation,
  report that this skill cannot be executed as specified, and ask the user whether to proceed
  with direct implementation by the coordinating agent instead.
- All implementation work belongs to subagents: edits to source, tests, documentation,
  configuration, schemas, migrations, and generated artifacts must be delegated. The
  coordinating agent may read, plan, ask questions, dispatch, wait, review results, inspect
  diffs/status, and run only non-mutating commands: git status/diff/log, file reads, and test
  or lint commands that do not modify tracked files, write generated artifacts, or install
  dependencies. Any command that could mutate the workspace must be delegated. The coordinating
  agent must not implement a missing fix directly. If verification finds a problem, delegate
  the fix.

## Decompose the plan into stages

When the plan touches a broad or unfamiliar part of the codebase, dispatch one or more scouts
before building the task map, so reconnaissance does not consume the coordinating agent's
context. Scouts are read-only and may run in parallel. Skip them when the plan already names
the affected files or the area is small enough to read directly.

Before the first implementation call, turn the full plan into a task map. For each stage record
its goal, owned files or boundaries, prerequisites, acceptance evidence, expected validation,
commit boundary, and agent role/tier. Keep tasks small enough that one subagent can finish
and verify one coherent slice.

Use dependencies to order stages. Parallelize only when all of the following are true:

- the stages are independent at the level of behavior and prerequisites;
- agents have disjoint file ownership, or the host gives each agent an isolated worktree;
- neither stage depends on the other's uncommitted output; and
- the result can be reviewed without one agent invalidating the other's assumptions.

When there is shared setup, overlapping files, uncertain boundaries, generated output, or any
meaningful risk of merge conflict, serialize the stages. Safety and clear ownership matter more
than throughput. Do not dispatch multiple agents to edit the same file or shared configuration
simultaneously.

Give each subagent a self-contained brief containing the relevant plan requirements, its exact
scope and file ownership, prerequisites, acceptance criteria, validation commands, commit
expectation, role/tier, and the selected model/effort. Include the plan location when the agent
needs to consult it, but do not omit requirements that affect its slice.

## Optional tier 3 advisor

The coordinating agent may dispatch a tier 3 advisor for a focused consultation before or
between stages, or when diagnosing a failure. Use it when independent reasoning can resolve a
concrete technical uncertainty, such as a tradeoff, stage boundary, or failure hypothesis.
State the reason for the consultation and selected model/effort before dispatch. Respect an
explicit user request to consult an advisor or to disable it; otherwise decide whether the
consultation is useful within the authorized task.

Give the advisor the question, relevant plan requirements, constraints, code or evidence, and
the decision it should inform. It is read-only: it may inspect and report options, tradeoffs,
recommendations, and remaining uncertainty; it must not edit files, commit, run mutating
commands, or direct implementation agents. Wait for its terminal response before making a
decision that depends on it. The coordinating agent checks its advice against the evidence
and retains responsibility for the decision and delegation.

Advice does not expand scope or permissions, resolve a material choice reserved for the user,
reset correction limits, or replace validation or the final review. Do not use a consultation
to continue past a stopping condition that requires user direction. Delegate any resulting
implementation to the normal implementation role and report the consultation's outcome.

## Run, wait, and evaluate

1. Dispatch the first ready stage (or a conflict-free parallel batch) to subagents.
2. Wait for each dispatched subagent to reach a terminal result before evaluating its work or
   starting a dependent stage. Do not treat commentary, a partial diff, or a still-running task
   as completion. For a batch, wait for every member whose output participates in the next
   decision. A terminal implementation handoff awaiting runner validation is not a completed
   stage; finish the validation and commit sequence below before releasing dependent stages.
   If any member of a parallel batch fails, still wait for the remaining members to reach a
   terminal state, do not dispatch any dependent stage, and report which batch members
   succeeded, which committed, and which failed before deciding on correction or escalation.
3. After completion, inspect the reported changes, diff/status, validation evidence, and commit
   identity. Confirm the result against the plan and the user's scope, then decide whether to
   continue, request a delegated correction, or ask the user about a material failure.
4. If a correction is needed, keep it with a subagent and wait for that correction to finish
   before re-evaluating. Do not patch it from the coordinating task.
   Limit corrective delegation to two attempts per stage. If the third evaluation still fails,
   halt the pipeline, report the failure with the evidence and diffs, and ask the user how to
   proceed.
5. Only then release the next dependent stage. Preserve user changes and respect repository
   instructions; never use a broad destructive reset to make delegation easier.

## Commits and validation

By default, have the responsible subagent create one focused commit for each completed stage,
after its stage-level checks pass. Commits should not mix unrelated stages; use the repository's
conventions for the message and include the reason when required. A per-call user override may
change the commit or validation policy, but call out the deviation and its consequences.

Use a tier 1 test runner for execution-only validation. After an implementation agent finishes
its changes and reaches a terminal handoff, dispatch the runner with the required commands,
working directory, revision or workspace state to validate, and allowed artifact paths. Wait
for its terminal report before evaluating the gate. Serialize validation against changes to
the same inputs; use the same conflict-free ownership rules as implementation stages.

The runner reports commands, exit codes, pass/fail results, relevant failure output, artifact
locations, and any skipped or blocked checks with reasons. It must distinguish observed failures
from diagnosis; nontrivial investigation and fixes go back to a tier 2 implementation agent.
After a fix, rerun the affected gates on the updated state. A runner failure does not authorize
raising the implementation tier. It consumes an implementation correction attempt only when
a corrective implementation was actually delegated. An optional advisor consultation follows
the separate advisor rules above.

Require fresh evidence for every completion claim. Stage checks may be executed by the runner
on behalf of the responsible implementation agent; that agent still owns the stage and its
commit. If validation precedes the commit, resume the implementation agent to commit only the
validated changes, then inspect the resulting diff and commit identity. Any further content
change requires fresh affected checks. The coordinating agent confirms final required gates
from current output. If a user note defers a stage or check (for example, postponing E2E),
record it explicitly as deferred work and do not claim that the full plan is validated.
Delegate any fix required by a failing gate; do not implement it in the coordinating task.

## Final review

On by default. Skip it only when the user explicitly disables it for the call (for example,
"final review: off" or "skip the final review"), and record that override in the final report.
After every stage is committed and the final gates pass, dispatch one tier 3 reviewer with
the full diff range of the run, the plan, the user's constraints, deferrals, and the validation
evidence. The reviewer is read-only: it reports
findings with file and line, severity, and the plan requirement or constraint involved; it does
not edit, commit, or run mutating commands.

The coordinating agent evaluates each finding against the code. Delegate confirmed fixes to a
tier 2 implementation agent under the normal correction, validation, and commit rules, then
rerun the affected gates. Do not rerun the reviewer after fixes unless the user asks. List any
finding rejected as unfounded in the final report with the reason. If the coordinating agent
already runs on a tier 3 model, the review still adds a fresh context, so run it when enabled.

## Communicate the outcome

Keep the user informed at material boundaries: after the plan is understood, before a risky or
irreversible action, when a dependency fails, and when a stage finishes. The final report should
identify the delegated stages, focused commits, validation evidence, explicit deferrals or
overrides, and any remaining user decision. State the model and reasoning effort used for
subagents, including role/tier, test-runner results, advisor consultations and their outcomes,
and final-review findings (or the user's explicit review opt-out), and make clear that those
settings did not change the coordinating task.
Do not claim completion while a required stage, correction, or validation remains pending.
Files in this package (2)
  • SKILL.md 16 KB
  • agents/openai.yaml 1 KB

Versions

The database has no other skills named execute-plan-with-agents.

Database snapshot: 13.11.2026 · package version 1a4b6737d4d1 (SHA-256 digest of the entire package)

Downloads in the last 30 days: 0 · ranking

Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.

Similar skills

  • 100execute-plan
    Execute a structured implementation plan produced by /make-plan, delegating implementation to a subagent and iterating with an independent review subagent until quality criteria are met. Args: [plan] [step-scope IDs…]. Use when the user asks to execute a plan or mentions /execute-plan.
  • 90do
    Execute a phased implementation plan using subagents. Use when asked to execute, run, or carry out a plan — especially one created by make-plan.
  • 96delegated-plan-execution
    Use when executing a plan via delegated subagents.
  • 100subagent-driven-development
    Execute an approved plan via one subagent per task with spec and quality checks. Use only when user allows subagents and a written plan exists. Triggers: "subagent per task", "dispatch implementer", "agent per plan step".
  • 98exec
    Execute plan tasks sequentially using subagents. Use when user says 'exec', 'execute plan', 'run plan', or wants to implement a plan file task by task with isolated subagents.
  • 98exec
    Execute plan tasks sequentially using subagents. Use when user says 'exec', 'execute plan', 'run plan', or wants to implement a plan file task by task with isolated subagents.

Feedback and reports

Your message goes to Bartosz Sokoliński. An email address is needed only for a reply. See the privacy policy.