estimation-stinger

/estimation-stinger

Forecast software delivery or an AI-assisted solo build at N hours daily. Use for sizing, NoEstimates, cycle-time data, or time/cash scenarios. Read README.md for the guide map.

Licence
AGPL-3.0
Last repository change
14.10.2026

Assessment and security

100/ 100Class: good
Format25 / 25
Frontmatter with name and description, valid name, description up to 1,024 characters, name matching the folder.
Discoverability25 / 25
Description explains when to use the skill, has a reasonable length and uses third person.
Content35 / 35
At least 150 words and at most 500 lines, headings, step lists, examples or code.
Hygiene15 / 15
No placeholders such as TODO, no Windows paths, with a licence.
Riskno signals detected in the scan
Files in this package
22
Scripts
2
HTML comments
0
URLs in SKILL.md
1
Deprecation

No signals detected. Repository changed on 14.10.2026, without references to retired models or APIs.

Licence

AGPL-3.0, copyleft: przeróbki udostępniane innym muszą mieć tę samą licencję.

What to check before installing
  • 2 scripts in this package. Review them before installing, as Claude may execute them.

Scripts: scripts/forecast-ai-assisted.py, scripts/test_forecast_ai_assisted.py

What it does and when to use it

Forecast software delivery or an AI-assisted solo build at N hours daily. Use for sizing, NoEstimates, cycle-time data, or time/cash scenarios. Read README.md for the guide map.

Original author description

Forecast software delivery or an AI-assisted solo build at N hours daily. Use for sizing, NoEstimates, cycle-time data, or time/cash scenarios. Read README.md for the guide map.

How it works

  1. When this stinger applies
  2. First action when this stinger is loaded
  3. Folder layout
  4. Critical directives (from Command Brief)
  5. The evidence that matters (from research)
  6. Total build budget including AI tools
  7. Critical Directive
Original SKILL.md headings · 115 lines, 1,023 words
SKILL.md preview
---
name: "estimation-stinger"
license: AGPL-3.0-or-later
description: "Forecast software delivery or an AI-assisted solo build at N hours daily. Use for sizing, NoEstimates, cycle-time data, or time/cash scenarios. Read README.md for the guide map."
---

# Estimation Stinger

Procedural arsenal for `estimation-wasp-drone`, the Wasp Nest's authority on software estimation and probabilistic delivery forecasting.

This stinger encodes:

- The canonical relative-sizing frameworks: Fibonacci story points, T-shirt sizing, Planning Poker, and when each applies.
- The NoEstimates movement: Vasco Duarte's throughput-as-forecast argument, prerequisites, and the honest evidence gap (no controlled RCTs).
- The planning-fallacy literature: why expert estimators are systematically wrong, the inside-view / outside-view distinction, and Kahneman/Tversky/Flyvbjerg's recommended remedy (reference class forecasting).
- Monte Carlo simulation: how it works, what data it needs, the 2026 free tooling landscape, and practical setup for teams with cycle-time history.
- The five-category dysfunction diagnosis that tells you WHICH technique to recommend before you recommend anything.

It does NOT encode sprint planning ritual design, Jira/Linear configuration, team capacity planning formulas, or vendor procurement.

## When this stinger applies

Load when `estimation-wasp-drone` is invoked. Typical user phrases:

- "Our velocity is meaningless / our story points drift every sprint"
- "Should we adopt NoEstimates?"
- "How do we T-shirt size our roadmap?"
- "We need a date with a confidence level for Q3"
- "Why do our estimates always come out wrong?"
- "Monte Carlo for delivery forecasting: explain it to my PM"
- "Our team says 2 weeks, it always takes 6"
- "How long and how much if I build with AI for N hours each day?"

For the individual-project trigger, read [guides/06-ai-assisted-forecast.md](guides/06-ai-assisted-forecast.md) after the required principles and diagnosis. Use the [worksheet](references/ai-assisted-forecast/worksheet.md), [worked example](examples/ai-assisted-forecast.md), and optional [Decimal calculator](scripts/forecast-ai-assisted.py). Fresh official-source evidence lives in [the cited distillation](references/ai-assisted-forecast/research/distillation.md). Without calibrated history, return conditional ranges and a calibration checkpoint; omit confidence percentages and universal AI speed factors. Individual-project scenarios do not extend this pair into team headcount planning.

Do NOT load for:

- Sprint ceremony design (retrospectives, planning, refinement): agile coaching domain
- Jira/Linear/Azure DevOps configuration: tooling domain
- Velocity tracking or charting: project management tooling domain

## First action when this stinger is loaded

Read these three files before doing anything:

1. **`guides/00-principles.md`**: the estimation-vs-forecasting distinction, the commitment trap, and the single most important framing: estimates are a communication tool, not a planning oracle.
2. **`guides/01-diagnosis.md`**: the five dysfunction categories. Always diagnose before recommending; the wrong framework for the wrong dysfunction makes things worse.
3. **`research/research-summary.md`**: the research manifest; tells you which external files cover which topics so you can fetch evidence when you need it.

Then read the specific guide for the technique the team needs.

## Folder layout

```text
estimation-stinger/
+- SKILL.md                     (this file  -  master index)
+- README.md                    (one-page human overview)
+- guides/
|  +- 00-principles.md          (estimation vs. forecasting; the commitment trap; scope and handoffs)
|  +- 01-diagnosis.md           (five dysfunction categories; decision tree for technique selection)
|  +- 02-relative-sizing.md     (Fibonacci story points, T-shirt sizing, Planning Poker)
|  +- 03-noestimates.md         (NoEstimates movement; prerequisites; throughput substitution; evidence base)
|  +- 04-monte-carlo.md         (Monte Carlo simulation; inputs; confidence percentiles; 2026 tooling)
|  +- 05-planning-fallacy.md    (planning fallacy; optimism bias; inside vs. outside view; remedies)
+- examples/
|  +- fibonacci-estimation-session.md  (worked estimation session from backlog → sized stories)
|  +- monte-carlo-forecast.md          (worked 40-item backlog forecast with P50/P85/P95 output)
+- templates/
|  +- estimation-advisory.md    (the output shape: diagnosis + recommendation + implementation steps)
+- reports/
|  +- README.md                 (advisory reports accumulate here over time)
+- research/                    (owned by scripture-historian  -  do NOT modify)
   +- research-plan.md
   +- research-summary.md
   +- index.md
   +- external/
      +- 01-noestimates.md
      +- 02-story-points-fibonacci.md
      +- 03-monte-carlo-forecasting.md
      +- 04-planning-fallacy.md
      +- 05-t-shirt-sizing.md
      +- 06-ai-estimation-and-tooling.md
```

## Critical directives (from Command Brief)

- **Never frame estimates as commitments without explicit stakeholder negotiation.** Why: the commitment trap is the primary driver of estimate-driven burnout.
- **Always distinguish relative sizing from probabilistic forecasting.** Why: story points answer "how big is this relative to that?"; they are not date predictors.
- **When recommending NoEstimates, always state the prerequisite: reliable cycle-time history.** Why: NoEstimates without data is not a methodology, it is an absence of information.
- **Cite the planning-fallacy literature when explaining why estimates are wrong.** Why: teams that understand the cognitive root cause accept data-driven alternatives; teams that think they need better estimators repeat the cycle.
- **Escalate velocity-configuration and sprint-ceremony questions.** Why: Jira/Linear setup and sprint ritual design are outside this Drone's domain.

## The evidence that matters (from research)

Key data points for advisory conversations (source-repository research, not shipped with the plugin):

- Replacing all story point values with "1" changes the forecast by only 8% (Maria Chec, 2025 Vasco Duarte interview). See `research/external/01-noestimates.md` (source-repository research, not shipped with the plugin).
- Only ~30% of software projects complete on time and on budget (Standish CHAOS). See `research/external/04-planning-fallacy.md` (source-repository research, not shipped with the plugin).
- IT projects average 27% cost overrun; 1 in 6 exceed 200% overrun (Flyvbjerg). See `research/external/04-planning-fallacy.md` (source-repository research, not shipped with the plugin).
- Initial software estimates are typically off by 2x-4x (McConnell). See `research/external/04-planning-fallacy.md` (source-repository research, not shipped with the plugin).
- Monte Carlo accuracy is 85-95% when based on quality historical data (montecarloestimation.com). See `research/external/03-monte-carlo-forecasting.md` (source-repository research, not shipped with the plugin).

---

*Procedure: [skill procedure](SKILL.md)*
*Part of The Wasp Nest, curated by [Mario Aldayuz a.k.a @thenotoriousllama](https://github.com/thenotoriousllama).*

## Total build budget including AI tools

For O037, read [guide 07](guides/07-total-build-budget.md), the [cash/time/credit worksheet](references/build-budget/worksheet.md), [fictional examples](references/build-budget/fictional-examples.md) and [fresh source digest](references/build-budget/research/distillation.md). Reuse the current forecast helper and resolve Operating Cost for applicable monthly mechanics. Actual invoice periods, subscription quotas, API token/tool meters, contractors/assets and the first operating period are reconciled once. Unknowns remain gaps; owner-time valuation stays separate; no vendor-rate or AI-productivity default is supplied.

## Critical Directive

- You must read all files and context contained within your skill.
- In the event your core knowledge does not provide sufficient guidance you must make every attempt to search the internet, related knowledge base documentation files, and other available resources to supplement your knowledge prior to proceeding with your task.
- Additional related skills can be found here:
  - [agile-scrum-stinger](../agile-scrum-stinger/SKILL.md) - Working methods and sprint ceremonies, outside this pair's forecast remit.

Research-only runtime: produces advisories and worksheets. The optional calculator is supplied-input arithmetic, not application implementation. Repository changes to this component still require the parent Security then Quality and repository-health gates before any authorized commit or push.
Files in this package (22)
  • README.md 2 KB
  • SKILL.md 9 KB
  • examples/ai-assisted-forecast.md 2 KB
  • examples/fibonacci-estimation-session.md 4 KB
  • examples/monte-carlo-forecast.md 4 KB
  • guides/00-principles.md 4 KB
  • guides/01-diagnosis.md 6 KB
  • guides/02-relative-sizing.md 6 KB
  • guides/03-noestimates.md 6 KB
  • guides/04-monte-carlo.md 6 KB
  • guides/05-planning-fallacy.md 6 KB
  • guides/06-ai-assisted-forecast.md 6 KB
  • guides/07-total-build-budget.md 4 KB
  • references/ai-assisted-forecast/example-input.json 1 KB
  • references/ai-assisted-forecast/worksheet.md 2 KB
  • references/ai-assisted-forecast/research/distillation.md 2 KB
  • references/build-budget/fictional-examples.md 3 KB
  • references/build-budget/worksheet.md 3 KB
  • references/build-budget/research/distillation.md 3 KB
  • research/research-summary.md 7 KB
  • scripts/forecast-ai-assisted.py 8 KB
  • scripts/test_forecast_ai_assisted.py 7 KB

Versions

The database has no other skills named estimation-stinger.

Database snapshot: 13.11.2026 · package version 1d3bdb0ddd1c (SHA-256 digest of the entire package)

Downloads in the last 30 days: 0 · ranking

Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.

Similar skills

  • 100product-planning-stinger
    Turn an approved strategy and UX package into a PRD map, saved wave plan, project Definition of Done and handoff packet. Use to plan the build order. Read README.md for the guide map.
  • 100task-estimation
    Turn fuzzy work into one honest estimate packet by choosing the right sizing horizon, naming confidence and uncertainty, and separating discovery from delivery before anyone treats the number like a promise. Use when the user needs story points, t-shirt sizing, planning-poker…
  • 100estimation
    Guides the user through risk-based task estimation using decomposition, three-point estimates, and PERT formula. ALWAYS trigger on "estimate", "how long will this take", "time to complete", "sizing", "scope this", "effort estimate", "how many hours", "story points", "project…
  • 100retrospective-stinger
    Facilitate engineering retrospectives. Use for format selection, safety pre-check, facilitation, or action-item follow-through. Read README.md for the guide map.
  • 100time-estimation
    Use when the user asks "how long will this take", when scoping or quoting any task or project (web/app dev, CRM or no-code builds, automations, integrations), or when about to state ANY duration estimate. Produces dual-track estimates (market billable hours vs your real…
  • 100create-estimation
    Create a three-point estimation when the user asks to estimate effort, scope a feature, size work, forecast timeline, or plan capacity for a project or feature

Feedback and reports

Your message goes to Bartosz Sokoliński. An email address is needed only for a reply. See the privacy policy.