Skip to content
Skills Library
Management & product · Planning

complete-project

/complete-project

This skill should be used when the user asks to 'complete a project', 'wrap up a project', 'archive a project', or 'run project completion'.

Repository
engy ↗
Licence
MIT
Last repository change
26.10.2026

Assessment and security

100/ 100Class: good
Format25 / 25
Frontmatter with name and description, valid name, description up to 1,024 characters, name matching the folder.
Discoverability25 / 25
Description explains when to use the skill, has a reasonable length and uses third person.
Content35 / 35
At least 150 words and at most 500 lines, headings, step lists, examples or code.
Hygiene15 / 15
No placeholders such as TODO, no Windows paths, with a licence.
Riskno signals detected in the scan
Files in this package
1
Scripts
0
HTML comments
0
URLs in SKILL.md
0
Deprecation

No signals detected. Repository changed on 26.10.2026, without references to retired models or APIs.

Licence

MIT, open: use and modify while retaining author attribution.

What it does and when to use it

This skill should be used when the user asks to 'complete a project', 'wrap up a project', 'archive a project', or 'run project completion'.

Triggers from the description

complete a projectwrap up a projectarchive a projectrun project completion
Original author description

This skill should be used when the user asks to 'complete a project', 'wrap up a project', 'archive a project', or 'run project completion'.

How it works

  1. MCP Tools
  2. Phase 1: Resolve Project
  3. Phase 2: Distillation
  4. Phase 3: Memory Review
  5. Phase 4: System Doc Proposals
  6. Phase 5: Archive
  7. Key Principles
  8. Flow Position
Original SKILL.md headings · 68 lines, 656 words
SKILL.md preview
---
name: complete-project
description: "This skill should be used when the user asks to 'complete a project', 'wrap up a project', 'archive a project', or 'run project completion'."
---

# Project Completion Orchestrator

Guides a project through its full completion lifecycle: distillation, memory review, system doc proposals, and archival. Each phase pauses for user confirmation so nothing is irreversible without explicit approval.

## MCP Tools

- `listWorkspaces` — resolve the active workspace and obtain its `workspaceId` before calling `listProjects`.
- `getProjectDetails` — fetch project metadata, status, and workspace context.
- `listProjects` — find the active project if not provided.
- `startProjectCompletion` — set status to `completing` and return ranked candidate fleeting memories for distillation review.
- `archiveProject` — mark project as `archived` and remove agent sessions. Plan, tasks, and promoted memories are preserved.

## Phase 1: Resolve Project

1. Identify the current project from session context (active project name/slug or the user's explicit mention).
2. Call `getProjectDetails({ projectId })` to confirm the project exists and retrieve its workspace slug and status.
3. **Branch on status:**
   - If `status` is `archived`: print "Project is already archived; nothing to do." and stop.
   - If `status` is `completing`: ask the user "Project is mid-completion. Resume from Phase 3 (review memories) or restart from Phase 2 (distillation)?" and proceed based on their answer.
   - Otherwise: print the project name and current status, then continue to Phase 2.

## Phase 2: Distillation

1. Call `startProjectCompletion({ projectId })`.
   - This sets the project status to `completing`.
   - It returns `{ candidates: FleetingMemory[] }` — unpromoted fleeting memories scoped to the workspace, ranked by signal score.
2. Print the count of candidate fleetings (e.g., "Found 12 candidate memories for review").
3. **Pause.** Present the candidates briefly and ask the user: "Ready to proceed to memory review? This will hand off to `/engy:review-memories`."
4. Wait for explicit user confirmation before continuing.

## Phase 3: Memory Review

After user confirms, invoke `engy:review-memories` directly via the Skill tool:

```
Skill({ skill: 'engy:review-memories' })
```

`Skill(...)` runs the inner skill to completion and returns control here before Phase 4 begins; do not advance until it returns. The invoked skill re-resolves workspace/project context itself — surface the active project name and workspace slug to the user before invoking so they can confirm the inner skill will target the right scope. The review skill is interactive — the user works through each candidate (approve, edit, supersede, contradict, skip). Do not rush or batch-skip. When it returns, continue to Phase 4.

## Phase 4: System Doc Proposals

Pause and ask: "Memory review is complete. Generate system doc proposals from the project's completed tasks and promoted memories? [yes/skip]"

- **yes** — invoke `engy:write-sysdocs` (refresh mode) via the Skill tool:
  ```
  Skill({ skill: 'engy:write-sysdocs', args: 'refresh' })
  ```
  `Skill(...)` runs the inner skill to completion and returns control here before Phase 5 begins; do not advance until it returns. The invoked skill re-resolves workspace/project context itself — surface the active project name and workspace slug to the user before invoking so the inner skill targets the right scope. Changes land uncommitted under `{workspaceDir}/system/` for diff-viewer review.
- **skip** — continue to Phase 5.

## Phase 5: Archive

1. **Pause.** Confirm with the user: "Memory review and doc proposals are complete. Archive the project now? This will mark it archived and preserve all tasks, plan content, and promoted memories."
2. On confirmation, call `archiveProject({ projectId })`.
3. Print confirmation: "Project archived. Agent sessions and execution logs have been removed. Plan, tasks, and memories are preserved."

## Key Principles

- **Pause between phases.** Never run phases back-to-back without user confirmation. Each pause is a checkpoint where the user can stop, inspect, or continue later.
- **Phases are resumable.** If the user stops mid-flow, they can re-invoke `/engy:complete-project` and pick up from where they left off by checking the project's current status via `getProjectDetails`.
- **Archival is final.** Make sure the user understands archival removes agent sessions and execution logs before calling `archiveProject`.

## Flow Position

**Previous:** Active project with tasks in `done` status | **Next:** Knowledge available via workspace-level memory for future projects

Versions

The database has no other skills named complete-project.

Database snapshot: 13.11.2026 · package version 2a214ddefc71 (SHA-256 digest of the entire package)

Downloads in the last 30 days: 0 · ranking

Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.

Similar skills

  • 100project-overview
    Use when the user asks about a specific project or all projects — e.g. 'show me project X', 'project overview', 'what projects do I have', 'project summary
  • 100project
    Show detailed status of a specific project by reading its archive, project_plan, and issues. Use for deep dive into one project's state.
  • 95project
    This skill should be used when the user asks "which project", wants to "create a project", "start a new project", "switch project", "mark this project complete", "archive a project", "unregister a project", "install the task rule", "set where task worktrees go", "check this…
  • 100ijfw-complete-milestone
    Use when a milestone is shipping and you need to archive its artifacts, generate a summary, and seed the next milestone. Trigger: 'milestone complete', 'ship milestone', 'wrap milestone', 'complete milestone <id>', /ijfw-complete-milestone.
  • 85obsidian-tracker-project-archive
    Archive, restore, or permanently delete a project. Use when the user invokes /project-archive.
  • 90kata-complete-milestone
    Use when the user wants to finish, close, ship, archive, or mark the active Kata milestone complete.

Feedback and reports

Your message goes to Bartosz Sokoliński. An email address is needed only for a reply. See the privacy policy.