client-status-reporting
/client-status-reporting
Produces the weekly 5-block client status report - done, next, blocked, decisions needed, budget/hours - in a 15-minute time cap, from a copy-paste template with [FILL] fields. Use when a freelancer or consultant says "client asked what they're paying for", "how do I keep clients updated", "write my weekly status update", "client keeps pinging me for progress", "they went quiet and I'm worried about the renewal", or "how do I show retainer value". Do NOT use for long-form consulting or research reports - use formatted-report-writer instead; this skill is the recurring one-page operating rhythm
- Author
- SkillMedev ↗
- Repository
- skills ↗
- Licence
- MIT
- Last repository change
- 13.10.2026
Assessment and security
- Files in this package
- 1
- Scripts
- 0
- HTML comments
- 0
- URLs in SKILL.md
- 0
No signals detected. Repository changed on 13.10.2026, without references to retired models or APIs.
MIT, open: use and modify while retaining author attribution.
What it does and when to use it
Produces the weekly 5-block client status report - done, next, blocked, decisions needed, budget/hours - in a 15-minute time cap, from a copy-paste template with [FILL] fields. Use when a freelancer or consultant says "client asked what they're paying for", "how do I keep clients updated", "write my weekly status update", "client keeps pinging me for progress", "they went quiet and I'm worried about the renewal", or "how do I show retainer value". Do NOT use for long-form consulting or research reports - use formatted-report-writer instead; this skill is the recurring one-page operating rhythm
Triggers from the description
Original author description
Produces the weekly 5-block client status report - done, next, blocked, decisions needed, budget/hours - in a 15-minute time cap, from a copy-paste template with [FILL] fields. Use when a freelancer or consultant says "client asked what they're paying for", "how do I keep clients updated", "write my weekly status update", "client keeps pinging me for progress", "they went quiet and I'm worried about the renewal", or "how do I show retainer value". Do NOT use for long-form consulting or research reports - use formatted-report-writer instead; this skill is the recurring one-page operating rhythm
How it works
- Operating procedure
- Template: weekly status report
- Worked example: Maya's week-3 report
- Concrete thresholds
- Deliverable
- Do NOT
- Quality bar
- Neighbors
SKILL.md preview
---
name: client-status-reporting
description: Produces the weekly 5-block client status report - done, next, blocked, decisions needed, budget/hours - in a 15-minute time cap, from a copy-paste template with [FILL] fields. Use when a freelancer or consultant says "client asked what they're paying for", "how do I keep clients updated", "write my weekly status update", "client keeps pinging me for progress", "they went quiet and I'm worried about the renewal", or "how do I show retainer value". Do NOT use for long-form consulting or research reports - use formatted-report-writer instead; this skill is the recurring one-page operating rhythm of an engagement.
---
# Client Status Reporting
Clients do not churn because the work was bad; they churn because they could not see the work at all. "What am I paying for?" is never really a question - it is the announcement that invisibility has already done its damage, and by then the renewal is in doubt. The weekly status report is the cheapest retention instrument a freelancer owns: fifteen minutes that preempts check-in pings, forces decisions out of clients on a schedule, and makes the invoice feel obvious instead of debatable.
In the Freelancer / Consultant OS pack, this skill takes over from client-onboarding-system at day 14 and runs for the life of the engagement. Worked example: Maya, a freelance brand designer on a $4,900/month Brand System Retainer (up to 36 hours) with a DTC hot-sauce brand.
## Operating procedure
### Step 1: Collect the inputs (once, at setup)
1. The communication contract from client-onboarding-system: channel, recipient(s), and send day. Default: same weekday every week (Friday morning or Monday morning), in the engagement's single async channel.
2. The SOW deliverables and, for retainers, the monthly hours cap - the budget block reports against these.
3. Where hours are tracked. If they are not, start now; the budget block cannot be guessed. Label any estimated figure as an estimate.
### Step 2: Write the 5-block report
Five blocks, fixed order, every week. The order is deliberate: value first (done), momentum second (next), then the two blocks that transfer responsibility (blocked, decisions), and money last, where it reads as stewardship rather than alarm.
1. **DONE** - shipped this week, phrased as outcomes with links or attachments. "8 social templates delivered (link)" not "worked on templates". Never empty: a light week still produced something (research, revisions in flight, coordination) - say what and why.
2. **NEXT** - commitments for the coming week, specific enough to be checkable against next week's DONE block. This is the accountability loop that builds trust.
3. **BLOCKED** - what is waiting on the client, who owns it, since when, and what it delays. This block is the polite paper trail: when a deadline slips because assets arrived three weeks late, the record already exists in the client's own inbox, in neutral language.
4. **DECISIONS NEEDED** - each with the options, a recommendation, and a respond-by date. A decision listed without a recommendation is homework; with one, it is a 30-second reply.
5. **BUDGET / HOURS** - hours used vs. cap (retainers) or budget consumed vs. total (projects), plus any change orders in flight. Surfacing this weekly is what makes scope-creep-defense conversations easy: the 80-percent-of-hours flag lands in a block the client already reads, never as a surprise.
### Step 3: Enforce the 15-minute time cap
The report must cost 15 minutes or it will not survive contact with a busy month - and a skipped report during a heavy week is maximum damage, because heavy weeks are exactly when clients most need visibility. Hitting the cap requires logging as you go: keep a running note of shipped items and blockers during the week, then assemble on send day. Writing from memory is what turns 15 minutes into 90. Hard rules: one page maximum, bullets not prose, links instead of embedded explanations, no design or formatting effort.
### Step 4: Send on schedule, even when nothing moved
The report ships every week, same day, including vacation weeks (short version, sent early) and stall weeks. A missed report teaches the client the channel is unreliable, and unreliable reporting reads as unreliable work. Two consecutive weeks where DONE is genuinely thin is not a reporting problem - it is a delivery or blocking problem; if it is blockers, escalate the BLOCKED block into a direct conversation.
## Template: weekly status report
```
STATUS - [FILL: client] - week of [FILL: date]
DONE
- [FILL: shipped item + link]
- [FILL: shipped item + link]
NEXT (by [FILL: next report date])
- [FILL: specific commitment]
- [FILL: specific commitment]
BLOCKED - waiting on you
- [FILL: item] - owner: [FILL], since [FILL: date], delays [FILL: what]
(or: Nothing - all clear.)
DECISIONS NEEDED
- [FILL: decision]: Option A [FILL] / Option B [FILL].
My recommendation: [FILL]. Need your call by [FILL: date].
(or: None this week.)
BUDGET / HOURS
- [FILL: X] of [FILL: cap] hours used this month ([FILL]%). [FILL: on track /
flag + proposed action]. Change orders in flight: [FILL / none].
```
## Worked example: Maya's week-3 report
```
STATUS - Hot Sauce Co - week of Mar 17
DONE
- Packaging concept v2 for the Habanero SKU - 3 directions (Figma link)
- 4 of 8 March social templates delivered (folder link)
- Brand consistency audit fixes applied to Instagram grid
NEXT (by Mar 24)
- Remaining 4 March social templates
- Packaging v2 revisions once your consolidated comments land
BLOCKED - waiting on you
- Product photography for the web refresh - owner: Dana, since Mar 5,
delays the homepage hero mockups
DECISIONS NEEDED
- Habanero packaging direction: A (bold type) / B (illustrated) / C (photo-led).
My recommendation: B - strongest shelf differentiation vs. the two
competitors from the kickoff brief. Need your call by Mar 21 to hold
the print timeline.
BUDGET / HOURS
- 24 of 36 hours used (67%). On track. Change orders in flight: none.
```
Ten minutes to write from her running log. The client replies "B, and chasing Dana today" - a decision extracted, a blocker cleared, and $4,900 of monthly value made visible, in one email.
## Concrete thresholds
- Weekly, same weekday, every week of the engagement - no gaps.
- 15-minute cap, one page maximum.
- Every DECISIONS item carries a recommendation and a respond-by date.
- Hours flagged in the budget block at 80 percent of cap with more than a week left (the same threshold scope-creep-defense uses).
- A blocker appearing 2 weeks running escalates from the report to a direct conversation.
## Deliverable
The recurring one-page 5-block report, sent on schedule - plus, at renewal time, the accumulated stack of them, which doubles as the strongest possible renewal case: a written record of everything shipped, every decision made, and every delay's true owner.
## Do NOT
- Do not narrate activity ("worked on", "made progress on") - report outcomes with evidence.
- Do not soften or omit the BLOCKED block to avoid seeming pushy; unsent blockers become the freelancer's fault at deadline time.
- Do not list decisions without recommendations; open-ended questions stall for weeks, recommendations get same-day replies.
- Do not skip the report on bad weeks; silence during a stall is when "what am I paying for?" gets composed.
- Do not let the report balloon into a memo - past one page, it stops being read, and an unread report protects no one.
## Quality bar
A report passes when: all five blocks are present (with explicit "none" where empty); every DONE item has a link or artifact; NEXT is checkable against the following week; each decision has a recommendation and date; the hours figure is real, not estimated - and it took no more than 15 minutes.
## Neighbors
client-onboarding-system sets up the cadence and channel this report runs on. The budget block feeds scope-creep-defense its early-warning numbers. For a one-off long-form deliverable like a strategy document or audit report, use formatted-report-writer instead.
Versions
The database has no other skills named client-status-reporting.
Database snapshot: 13.11.2026 · package version 6dae575a7d99 (SHA-256 digest of the entire package)
Downloads in the last 30 days: 0 · ranking
Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.
Similar skills
- 100status-report
Write a structured client status report for a consulting engagement. Use when a consultant says "write my weekly status update", "I need to send a status report", "draft the client update", "what should be in the weekly report", "client wants a progress update", "help me write… - 100weekly-client-update
Drafts the weekly update email to a client from the account's memory, this week's files and emails: what we did, what we're seeing, what's next and what we need from them. Saves it as a draft and never sends. Use when asked for a weekly, Friday or end-of-week client update, a… - 100weekly-client-update
Drafts the weekly update email to a client from the account's memory, this week's files and emails: what we did, what we're seeing, what's next and what we need from them. Saves it as a draft and never sends. Use when asked for a weekly, Friday or end-of-week client update, a… - 86report-writer
Write a weekly progress report from the repository's recent activity. Use when the user asks for a progress report, a weekly report, or a status write-up. - 85bops-130-write-the-weekly-status-report
Write a one-page weekly status report from the record: headline, decisions needed, done, slipped, at risk, next week. Use when the owner asks for a status update, a weekly summary or a recap. - 100report-progress
Writes a progress report from the status template, or from a template the project added. Use it when someone asks for a status report, a progress update, or a report template of their own.