Skip to content
Skills Library
Management & product · Planning

backlog

/backlog

Rules for splitting an idea, a feature or a technical initiative (migration, upgrade, rewrite) into a short backlog of vertical, one-line user stories. Use when the user or the lead workflow asks to create or reshape a backlog. No acceptance criteria or implementation.

Author
bitIO ↗
Repository
wheelhouse ↗
Licence
MIT
Last repository change
12.11.2026

Assessment and security

100/ 100Class: good
Format25 / 25
Frontmatter with name and description, valid name, description up to 1,024 characters, name matching the folder.
Discoverability25 / 25
Description explains when to use the skill, has a reasonable length and uses third person.
Content35 / 35
At least 150 words and at most 500 lines, headings, step lists, examples or code.
Hygiene15 / 15
No placeholders such as TODO, no Windows paths, with a licence.
Riskno signals detected in the scan
Files in this package
2
Scripts
0
HTML comments
0
URLs in SKILL.md
0
Deprecation

No signals detected. Repository changed on 12.11.2026, without references to retired models or APIs.

Licence

MIT, open: use and modify while retaining author attribution.

What it does and when to use it

Rules for splitting an idea, a feature or a technical initiative (migration, upgrade, rewrite) into a short backlog of vertical, one-line user stories. Use when the user or the lead workflow asks to create or reshape a backlog. No acceptance criteria or implementation.

Original author description

Rules for splitting an idea, a feature or a technical initiative (migration, upgrade, rewrite) into a short backlog of vertical, one-line user stories. Use when the user or the lead workflow asks to create or reshape a backlog. No acceptance criteria or implementation.

How it works

  1. Conversation (when I invoke it directly)
  2. Rules
  3. Migration mode
  4. Output format
Original SKILL.md headings · 56 lines, 506 words
SKILL.md preview
---
name: backlog
description: Rules for splitting an idea, a feature or a technical initiative (migration, upgrade, rewrite) into a short backlog of vertical, one-line user stories. Use when the user or the lead workflow asks to create or reshape a backlog. No acceptance criteria or implementation.
---

# Backlog

Split what I tell you into user stories. I bring the requirements; you order and slice them. When `lead` uses this skill, it adds risk, checks and mode afterwards.

## Conversation (when I invoke it directly)

1. Listen to the idea. If something is unclear, ask one question at a time, each with your suggested answer.
2. On a new project, agree on the stack: only the stack, not the architecture.
3. Ask whether any expensive-to-change decision applies. Only ask; don't design it:
   - multi-tenant or multi-organization
   - permissions or roles model
   - offline or sync
   - multi-language or multi-currency
   - for migrations: can old and new run side by side, and what is the rollback?
4. Propose the backlog. I adjust it.

## Rules

- **Don't invent requirements.** Only split what I told you. If you see a gap, ask.
- **Each story delivers value on its own** and cuts through every layer it needs. Never split by layer.
- **No technical stories.** "Set up the database" or "create the user model" are not stories; that work happens inside the first story that needs it.
- **Few stories**: 5–15. I'd rather add than cut.
- **One line per story.** No acceptance criteria, no technical detail, no estimates.
- **The first story is a walking skeleton**: the smallest thing usable end to end.

## Migration mode

Use it for migrations, framework or runtime swaps, upgrades and rewrites. The rules above still apply with one change: **the value of a story is behaviour that keeps working on the new stack, which the old stack can then stop providing.**

- The actor is whoever depends on that behaviour: an end user, an API consumer (another app), or an operator who deploys and rolls back.
- **Slice by behaviour, not by layer**: a route group, a user journey, a job. Never "port the controllers", then "port the services".
- **Strangler order**: walking skeleton on the new stack in production-like conditions → the simplest real slice → slices ordered by consumer value and risk → cutover → decommission.
- **Every story leaves the system shippable.** Old and new coexist until the cutover story.
- The final *decommission* story ("As an operator, I want the old backend removed…") is the one allowed exception to "no technical stories".
- Spell out what must not change: contracts, auth semantics, data. `story` turns these into parity criteria.

Details and a worked example: [references/migrations.md](references/migrations.md).

## Output format

```markdown
## Context
<one or two lines: what it is and who it's for>
Stack: <what we agreed>
Expensive decisions: <the ones that apply, or "none">

## Backlog
1. As a <actor>, I want <action>, so that <benefit>.
2. As a <actor>, I want <action>, so that <benefit>. Requires: #1
```

Add `Requires: #N` only when a story makes no sense without another.

When I invoke this directly, offer at the end to save the context and stack in `AGENTS.md` (or `CLAUDE.md`). The stories go to the tracker; don't write them to files unless I ask.
Files in this package (2)
  • SKILL.md 3 KB
  • references/migrations.md 4 KB

Versions

RepositoryScoreLicence
This page · bitIO/wheelhouse100MIT
Ovid/paad100MIT
Ovid/paad100MIT
Ovid/paad100MIT
gtlpanda/PandaStack100MIT
SergioLizana/Dynamo100MIT
Archont561/qgis-agent-harness100MIT
umputun/cc-thingz100MIT
Alter-ai/skill-lab100MIT

Database snapshot: 13.11.2026 · package version 44a0598c6d06 (SHA-256 digest of the entire package)

Downloads in the last 30 days: 0 · ranking

Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.

Similar skills

  • 100shape-it
    Turn a product idea, MVP, or new feature into a scoped plan and an implementable backlog of vertical slices with acceptance criteria. Use this whenever the user wants to design, scope, shape, plan or "think through" an MVP, a new product, a new feature, an epic, or says things…
  • 100user-stories
    Prioritized backlog of user stories with checkable acceptance criteria (docs/STORIES.md) for a Windows app, built from a brief, research, or screen index. Use after app-brief or clone, or when the user asks for user stories, a backlog, a feature list, or "what do we build first".
  • 100user-stories
    Prioritized backlog of user stories with checkable acceptance criteria (docs/STORIES.md) for a macOS app, built from a brief, research, or screen index. Use after app-brief or clone, or when the user asks for user stories, a backlog, a feature list, or "what do we build first".
  • 100user-stories
    Prioritized backlog of user stories with checkable acceptance criteria (docs/STORIES.md) for a macOS app, built from a brief, research, or screen index. Use when app-brief or clone is done, or when the user asks for user stories, a backlog, a feature list, or "what do we build first".
  • 90Backlog Management
    This skill should be used when the user asks to 'add to backlog', 'update backlog', 'check backlog', 'list backlog items', 'prioritize backlog'. Provides conventions for managing the project backlog in .s2s/BACKLOG.md.
  • 100user-stories
    Breaks an epic, spec, or feature into well-formed user stories with Given/When/Then acceptance criteria, applies INVEST, and splits stories that are too big. Use when a PM says "break this epic into stories", "write user stories", needs "acceptance criteria for X", wants to…

Feedback and reports

Your message goes to Bartosz Sokoliński. An email address is needed only for a reply. See the privacy policy.