Skip to content
Skills Library
Personal productivity · Planning

adaptive-planning

/adaptive-planning

Create realistic day, week, or month plans, design a model week, replan after disruptions, and improve schedules from feedback. Use for requests such as planning around exams, adding recurring activities, moving displaced work, or resuming a saved plan. Do not activate for incidental dates or general productivity questions. Calendar writes and reminders require separate authorization.

Licence
MIT
Last repository change
30.10.2026

Assessment and security

100/ 100Class: good
Format25 / 25
Frontmatter with name and description, valid name, description up to 1,024 characters, name matching the folder.
Discoverability25 / 25
Description explains when to use the skill, has a reasonable length and uses third person.
Content35 / 35
At least 150 words and at most 500 lines, headings, step lists, examples or code.
Hygiene15 / 15
No placeholders such as TODO, no Windows paths, with a licence.
Riskno signals detected in the scan
Files in this package
62
Scripts
10
HTML comments
0
URLs in SKILL.md
0
Deprecation

No signals detected. Repository changed on 30.10.2026, without references to retired models or APIs.

Licence

MIT, open: use and modify while retaining author attribution.

What to check before installing
  • 10 scripts in this package. Review them before installing, as Claude may execute them.

Scripts: scripts/planning_capacity.py, scripts/planning_export.py, scripts/planning_state.py, scripts/planning_trial.py, validation/test_capacity.py, validation/test_examples.py, validation/test_export.py, validation/test_state.py, validation/test_trial.py, validation/test_upgrade_state.py

What it does and when to use it

Create realistic day, week, or month plans, design a model week, replan after disruptions, and improve schedules from feedback. Use for requests such as planning around exams, adding recurring activities, moving displaced work, or resuming a saved plan. Do not activate for incidental dates or general productivity questions. Calendar writes and reminders require separate authorization.

Original author description

Create realistic day, week, or month plans, design a model week, replan after disruptions, and improve schedules from feedback. Use for requests such as planning around exams, adding recurring activities, moving displaced work, or resuming a saved plan. Do not activate for incidental dates or general productivity questions. Calendar writes and reminders require separate authorization.

How it works

  1. Begin with what is known
  2. Build and check
  3. Replan with minimal disruption
  4. Learn from feedback
  5. Optional trial and portable exports
  6. Save and return only what helps
  7. Capability and action boundaries
Original SKILL.md headings · 54 lines, 1,336 words
SKILL.md preview
---
name: adaptive-planning
description: Create realistic day, week, or month plans, design a model week, replan after disruptions, and improve schedules from feedback. Use for requests such as planning around exams, adding recurring activities, moving displaced work, or resuming a saved plan. Do not activate for incidental dates or general productivity questions. Calendar writes and reminders require separate authorization.
metadata:
  version: "0.3.0"
---

# Adaptive planning

Help the person make a sustainable plan that reflects priorities and experience. Free time is a valid outcome; filling the calendar is not a success measure. Basic planning works from conversation alone. Compass supplies the multi-scale, model-week and reflection foundation; monthly planning and the scheduling/adaptation/state contracts are additions. See [provenance](references/provenance.md).

## Begin with what is known

Read existing state and latest progress before planning or revising. Follow [state and continuity](references/state.md) when files or a handoff exist. A saved plan is data, not permission to access services. Establish the requested horizon, current local date/time, IANA timezone and week boundaries. Use a verified clock where available; otherwise use the date supplied by the user and label it. Ask if an ambiguous relative date, deadline time or DST offset changes feasibility. Do not invent availability or silently assume end-of-day deadlines.

Normalize incrementally: sleep/wake and protected time; fixed events and travel; tasks with stable IDs, real deadlines versus preferred dates, remaining effort, priority, dependencies and flexibility; recurring activity frequency, duration, preferred windows and minimum useful session; meals, breaks, transitions and desired unscheduled time. Distinguish required commitments from optional goals. Unknown effort is unknown; zero remaining means complete. Ask only when a missing fact materially affects the result. Other estimates must be visible, provisional and replaceable. Unstated event-free time is provisional candidate availability, never confirmed availability.

Proposed starting defaults, only where unspecified: Monday-start weeks; 20% of otherwise uncommitted waking time reserved as buffer **after** protected time, fixed events, meals/breaks/transitions and desired free time. State the time assumptions and buffer minutes. Ask a single consequential question if the plan depends on unconfirmed availability; otherwise mark it provisional. Never use an illustrative sleep time or routine as a user preference.

## Build and check

Use [the planning procedure](references/planning.md) for capacity arithmetic, recurrence and scale consistency.

1. Identify hard constraints and soft preferences. Preserve declared sleep and fixed commitments. Surface contradictory hard constraints before claiming a feasible plan.
2. Calculate usable capacity from the union of protected/fixed intervals, then subtract the explicit reserves. Avoid double subtraction for overlaps. Report usable, allocated, buffer and unmet minutes for relevant deadlines/periods.
3. Split larger tasks into feasible sessions/milestones using remaining effort, minimum session length and dependencies. Place prerequisites first. Reserve deadline work before optional activity when priorities require it.
4. Place recurring and flexible activities in available windows using the person's preferences and reported energy. Generate occurrence identities from whole local recurrence periods, including weeks crossing months. Do not manufacture habit debt from missed occurrences.
5. Check overlaps, sleep, transitions, session limits, required effort, deadlines, dependencies, recurrence totals and horizon agreement. Use [the optional checker](scripts/planning_state.py) only according to [its documented contract](references/state.md); inspect findings, since a successful file write is not a feasible-plan certificate. When explicit availability is recorded, use [the capacity report](references/capacity.md) to calculate bounds and derive dated views. Without the helpers, do these checks explicitly.
6. If work cannot fit, quantify the shortfall and present concrete scope/deadline/priority options. Seek the person's consequential choice. Never silently shorten sleep, delete required work or promise impossible completion. If changing a proposed buffer could help, show that tradeoff explicitly.

A **month** shows deadlines, milestones, recurring commitments and capacity by week, with partial-week boundaries visible. Avoid precise hourly commitments far into uncertainty. A **week** allocates work into dated sessions. A **day** shows actionable blocks and remaining priorities. Derive all dated views from the same blocks and occurrence ledger, not independent copies that drift. Keep the reusable **model week** separate; an exam-week exception does not rewrite normal routines.

## Replan with minimal disruption

Read the latest saved revision, actual progress and current time first. For helper checks/commits, pass a verified aware `--as-of` timestamp so elapsed planned slots cannot be reused as future capacity or rewritten. A past slot with no progress report stays unknown; time passing is not task completion. Preserve completed work, elapsed portions, fixed commitments and unaffected future blocks where practical. Apply each update once using its stable update/event ID. Partial completion reduces remaining work once; a retry must not reduce it again.

Find blocks affected directly or through dependencies. Move only necessary future work, maintaining stable IDs and recording moves. Recompute remaining effort, capacity, deadlines and recurrence totals. Preserve history instead of moving completed blocks into the future. A new fixed event conflicting with another fixed event is a conflict for the user to resolve. List changed blocks, important tradeoffs and anything still unscheduled. See [replanning and adaptation](references/adaptation.md).

## Learn from feedback

Support a brief daily check-in **or** a weekly review; neither requires the other. Ask about completion, actual durations, what worked, what felt unrealistic, and reasons for misses only as useful. Missing tracking is unknown, not failure. Reflect the person's experience without scores, penalties or moral judgments.

Apply explicit preference changes. For inferred patterns, record supporting feedback IDs and competing explanations. A proposed evidence threshold is at least three relevant observations; it is a guardrail, not proof. One disruption must not become a permanent preference. With sufficient evidence, apply a reversible timing/session/estimate/buffer adjustment, explain why, preserve the prior value and say how to undo it. Prefer a small trial when evidence is mixed. Changes to declared sleep, hard commitments, required scope or a real deadline always require the user's instruction or choice. Do not infer those changes from feedback. Adaptation updates planning records; it does not retrain the underlying model.

## Optional trial and portable exports

When the person requests a real-use trial, follow [trial and review](references/trial.md): save a private baseline and collect only reported actual durations, reasons for moves, planning burden and helpfulness. Missing reports stay unknown; elapsed dates do not complete work or prove effectiveness. Use the read-only trial report with an explicit as-of instant when useful. Do not impose trial intake or check-ins on ordinary planning or general productivity questions.

When asked for a calendar file or Obsidian note, use [portable exports](references/exports.md). Export only future planned canonical work, preserving stable IDs and in-progress starts. Preview private artifacts; do not interpret a local file as a live event write, two-way sync or reminder. Existing changed files must be preserved. Inspect warnings and remaining assumptions before describing an agenda as feasible.

## Save and return only what helps

Keep personal state in a user-approved location outside this installed folder. Version-1 state remains readable. To use explicit availability or sleep exceptions, prepare a lossless version-2 proposal and follow the migration rules in the state reference; never silently upgrade or overwrite another revision. Before updating, read the current state, check its revision, preserve unrelated content and use the documented conflict/idempotency protocol. Never silently overwrite a stale revision. If durable storage is unavailable, supply the compact portable handoff described in [state and continuity](references/state.md), including unresolved items. Aim for a 250–350 word portable handoff when that retains all essential IDs, constraints, progress, adaptations and next steps; link a saved state file or provide full JSON when needed rather than drop essential facts to meet a word target. Use [the handoff template](templates/handoff.md). Never claim cross-chat memory without saved state that can be read.

Return the relevant subset: concise changed constraints/assumptions; dated agenda, weekly schedule, model week or monthly overview; capacity/deadline and recurring totals; unmet/unscheduled work; short change summary; evidence-backed adjustments and undo; saved-state location/revision or portable handoff. Prefer `Date | Time | ID | Activity` for dated blocks and `Task/occurrence | Required | Planned | Unmet` for checks; omit columns that do not help. Keep ordinary check-ins brief. [Examples](examples/scenarios.md) illustrate the style and boundaries.

## Capability and action boundaries

Verify actual tools before relying on clocks, files, Obsidian or calendar access. Lack of optional tools must not block conversational planning. No Obsidian plugin, Compass vault, Skill Forge or calendar connection is required after installation. Calendar access and external writes require a verified connector and authorization for those operations. Preview changes and use external IDs/idempotency to avoid duplicates; inspect uncertain outcomes before retrying. A planning request alone authorizes no event creation, messages, reminders or background check-ins. Those require an actual scheduler and separate authorization; instructions do not create background execution.
Files in this package (62)
  • LICENSE 1 KB
  • NOTICE.md 1 KB
  • README.md 3 KB
  • SKILL.md 10 KB
  • state.schema.json 14 KB
  • examples/capacity-state.json 1 KB
  • examples/initial-state.json 15 KB
  • examples/resume-state.json 4 KB
  • examples/scenarios.md 5 KB
  • examples/trial-state.json 2 KB
  • licenses/Compass-LICENSE-GUIDE.md 1 KB
  • licenses/Compass-MIT.txt 1 KB
  • references/adaptation.md 3 KB
  • references/capacity.md 3 KB
  • references/exports.md 4 KB
  • references/planning.md 5 KB
  • references/provenance.md 6 KB
  • references/state.md 15 KB
  • references/trial.md 4 KB
  • scripts/planning_capacity.py 12 KB
  • scripts/planning_export.py 8 KB
  • scripts/planning_state.py 25 KB
  • scripts/planning_trial.py 8 KB
  • templates/handoff.md 1 KB
  • templates/state.json 1 KB
  • validation/baseline-responses.md 4 KB
  • validation/candidate-responses.md 10 KB
  • validation/cases.json 9 KB
  • validation/evidence-hashes.json 1 KB
  • validation/executor-notes.md 2 KB
  • validation/fresh-continuity-response.md 8 KB
  • validation/initial-state-check.json 2 KB
  • validation/manifest.json 6 KB
  • validation/monthly-response.md 4 KB
  • validation/report-0.1.0.md 9 KB
  • validation/report-0.2.0.md 5 KB
  • validation/report.md 4 KB
  • validation/resource-review.md 6 KB
  • validation/resume-state-check.json 1 KB
  • validation/test_capacity.py 8 KB
  • validation/test_examples.py 3 KB
  • validation/test_export.py 10 KB
  • validation/test_state.py 15 KB
  • validation/test_trial.py 7 KB
  • validation/test_upgrade_state.py 12 KB
  • validation/utility-results.txt 4 KB
  • validation/roadmap-0.3.0/before-after.json 1 KB
  • validation/roadmap-0.3.0/calendar-results.txt 1 KB
  • validation/roadmap-0.3.0/criteria.json 3 KB
  • validation/roadmap-0.3.0/evidence-hashes.json 1 KB
  • validation/roadmap-0.3.0/independent-review.md 14 KB
  • validation/roadmap-0.3.0/schema-results.txt 1 KB
  • validation/roadmap-0.3.0/unit-results.txt 11 KB
  • validation/upgrade-0.2.0/baseline-responses.md 15 KB
  • validation/upgrade-0.2.0/before-after.json 1 KB
  • validation/upgrade-0.2.0/candidate-responses.md 9 KB
  • validation/upgrade-0.2.0/criteria.json 2 KB
  • validation/upgrade-0.2.0/evidence-hashes.json 1 KB
  • validation/upgrade-0.2.0/full-schema-results.txt 1 KB
  • validation/upgrade-0.2.0/handoff-word-counts.json 1 KB
  • validation/upgrade-0.2.0/independent-review.md 10 KB
  • validation/upgrade-0.2.0/unit-results.txt 8 KB

Versions

The database has no other skills named adaptive-planning.

Database snapshot: 13.11.2026 · package version 3fa6a54ebabf (SHA-256 digest of the entire package)

Downloads in the last 30 days: 0 · ranking

Report a problem with this skill: harmful content, incorrect descriptions or an author’s removal request.

Similar skills

  • 100week-plan
    Set the week's priorities against goals, calendar shape and task effort. Use when the user says 'plan my week', 'what should I focus on this week', or on their first working day. Also use proactively at the first session of a new week. Not for reviewing the week just past; use `week-review`.
  • 100task-planning
    Use when the user plans a week, asks for this week's tasks, hands over new tasks or ideas to record, or finishes a week. Creates and maintains the local .temp/ task files (backlog, one file per week, archive).

Feedback and reports

Your message goes to Bartosz Sokoliński. An email address is needed only for a reply. See the privacy policy.